3171 Case Studies

0.0(0)
Studied by 0 people
call kaiCall Kai
Locked
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/28

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 7:08 PM on 9/23/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

29 Terms

1
New cards

Bhopal - hazards

reactivity and toxicity

2
New cards

Bhopal - initiating event

water intruded into an intermediate storage vessel

3
New cards

Bhopal - loss event

40 MT of MIC gas released to the atm

4
New cards

Bhopal - consequences

3,000 fatalities, injuries ranging up to hundreds of thousands

5
New cards

Bhopal - lessons

  1. Process safety culture - cost pressure in preparation for shutdown, cut staffing and training

  2. HIRA - inherently safer design - large intermediate inventory not needed

  3. MOC - disabled safety systems (pressure gauges, hi temp alarms, scrubbers)


6
New cards

Dupont case study- hazards

toxicity

7
New cards

Dupont case study- loss events

two pounds of phosgene released from hose rupture

8
New cards

Dupont case study- consequences

one fatality, 3 exposures, national media attention

9
New cards

Dupont case study- initiating event

hose blocked in, trapped phosgene

10
New cards

Dupont case study- lessons

  1. Process safety culture - inherently safer design reccomendations not taken (containment building, tubing material)

  2. Incident Investigation - recent hose failure not investigated

  3. Missed hose PM, MOC to inspection


11
New cards

T2 labs case study - hazards

Reactivity (runaway), flammability, overpressure

12
New cards

T2 labs case study - initiating event

loss of cooling

13
New cards

T2 labs case study - consequences

explosion equiv to 1400lb of TNT

14
New cards

T2 labs case study - lessons

  1. Process safety competency - lack of experience, did not understand hazards

  2. HIRA - hazop not done on reactor scaling

  3. MOC - increased batch size with no safety review

  4. Exotherms occurred without review


15
New cards

BP America (Texas City) Refinery Explosion - hazards

flammability

16
New cards

BP America (Texas City) Refinery Explosion - initiating event

overfill raffinate splinter on startup

17
New cards

BP America (Texas City) Refinery Explosion - loss event

50,000 lbm of hydrocarbon released

18
New cards

BP America (Texas City) Refinery Explosion - consequences

15 fatalities, 180 injuries, regulatory fines, reforms in various industrial process safety practices

19
New cards

BP America (Texas City) Refinery Explosion - lessons

PROCESS SAFETY CULTURE,

  1. inadequate operation readiness

  2. lack of supervisory oversight during start up

  3. SOP & training inadequate

  4. complacency (consequences of operations - shift change, shift log, fatigue)


20
New cards

Chevron Richmond Refinery case study - hazards

flammability, toxicity, corrosivity

21
New cards

Chevron Richmond Refinery case study - initiating event

sulfidation corrosion caused pipe failure

22
New cards

Chevron Richmond Refinery case study - loss event

15000 lbm light fuel oil vapor from crack in distillation side of cut line

23
New cards

Chevron Richmond Refinery case study - consequences

15000 people in community affected, 20 hospitalized

24
New cards

Chevron Richmond Refinery case study - lessons

  1. Asset integrity - multiple opportunities to replace w materials resistant to sulfidation corrosion

  2. Incident investigation - failure had occurred in similar service at another chevron refinery

  3. PSC - stop work authority, repair extensions


25
New cards

MGPI Processing Case study - hazards

reactivity, toxicity

26
New cards

MGPI Processing Case study - initiating event

human error, connected unloading hose to wrong vessel

27
New cards

MGPI Processing Case study - loss event

chlorine mass not specified, could have used source model

28
New cards

MGPI Processing Case study - consequences

medical attention for 120-140 people in community

29
New cards

MGPI Processing Case study - lessons

  1. Human factors - poor equipment labeling and connection design

  1. inadequate unloading procedures - driver left unsupervised, no verification to confirm lineup

  2. Lock or automated safeguard - no shutoff or isolation system