RULE 7: Occupancies + Zones + Requi

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/123

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 5:31 AM on 3/13/25
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai

No analytics yet

Send a link to your students to track their progress

124 Terms

1
New cards

Occupancy

are assigned to buildings

how the buildings is used

2
New cards

Zoning

are assigned to lands

how a piece of land is designated for use

how the land is classified

3
New cards

A

Occupancy: Residential Dwellings


4
New cards

B


Occupancy: Residential, Hotels, Apartments

5
New cards

C

Occupancy: Education and Recreation

6
New cards

D


Occupancy: Institutional

7
New cards

E


Occupancy: Business and Mercantile

8
New cards

F


Occupancy: Industrial

9
New cards

G

Occupancy: Storage and Hazardous

10
New cards

H


Occupancy: Assembly other than Group I

11
New cards

I


Occupancy: Assembly with more than 1,000 or more occupant load

12
New cards

J


Occupancy: Accessory

13
New cards


Residential


Zoning: R

14
New cards


Commercial

Zoning: C

15
New cards

General Institutional

Zoning: GI

16
New cards


Industrial

Zoning: I

17
New cards

Utilities, Transportation, Services

Zoning: UTS

18
New cards

Special

Zoning: SPE

19
New cards

Park Structures, Recreation, Entertainment

Zoning: PRE

20
New cards

Cultural

Zoning: CUL

21
New cards

Agricultural

Zoning: A

22
New cards


Agroindustrial

Zoning: AI

23
New cards


Planned Unit Development

Zoning: PUD

24
New cards

A-1

knowt flashcard image

25
New cards

A-2

26
New cards

D-1

27
New cards

D-2

28
New cards

D-3

29
New cards

E-1

30
New cards

E-2

31
New cards

E-3

32
New cards

LIGHT INDUSTRIAL

33
New cards

G-1

34
New cards

G-2

35
New cards

G-3

36
New cards

G-4

37
New cards

G-5

38
New cards

H-1

39
New cards

H-2

40
New cards

H-3

41
New cards

H-4

42
New cards

J-1


AGRICULTURAL STRUCTURES

43
New cards

J-2

CARPORTS/GARAGES, FENCES, TOWERS, AND POOLS

44
New cards

J-3

STAGES, COURTS, TOMBS, MAUSOLEUMS, ZOOS, AND BANKS

45
New cards

YELLOW

ZONE COLOR

RESIDENTIAL

46
New cards

R1

47
New cards

R2

48
New cards

BASIC R2

49
New cards

MAXIMUM R2

50
New cards

R3

51
New cards

BASIC R3

52
New cards

MAXIMUM R3

53
New cards

R4

54
New cards

R5

55
New cards

RED

ZONING COLOR

COMMERCIAL

56
New cards

C1

57
New cards

C2

58
New cards

C3

59
New cards

BLUE

ZONING COLOR

INSTITUTIONAL

60
New cards

GI - GENERAL INSTITUTIONAL

61
New cards

VIOLET

ZONING COLOR

INDUSTRIAL

62
New cards

I-1

63
New cards

I-2

64
New cards

GRAY


ZONING COLOR

INFRASTRUCTURE AND UTILITIES

65
New cards

UTS

66
New cards

SPE

67
New cards

GREEN

ZONING COLOR

PARKS AND PLAYGROUNDS

68
New cards

PRE (PARK STRUCTURES, RECREATION, AND ENTERTAINMENT)

69
New cards

CUL (CULTURAL)

70
New cards

LIGHT GREEN


ZONING COLOR

AGRICULTURE

71
New cards

A (AGRICULTURAL)

72
New cards

LIGHT VIOLET


ZONING COLOR

AGRO-INDUSTRIAL

73
New cards

AI (AGRO-INDUSTRIAL)

74
New cards

PUD (PLANNED UNIT DEVELOPMENT)

75
New cards

MIXED OCCUPANCIES

76
New cards

OLIVE GREEN


ZONING COLOR

GRASSLAND AND PASTURE

77
New cards

DARK GREEN

ZONING COLOR

FOREST

78
New cards

BROWN

ZONING COLOR

MINING AND QUARRYING

79
New cards

AQUA

ZONING COLOR

SWAMPLAND AND MARSHES

80
New cards

RIGHT OF WAY

81
New cards

750 MM

EAVES SHOULD HAVE A DISTANCE OF AT LEAST — MM AWAY FROM THE SIDE AND REAR PROPERTY LINES

82
New cards

FIREWALLS


83
New cards

3.2 METERS

HEIGHT OF R1 ABUTMENT

84
New cards

PERFORATED CONCRETE BLOCKS

R1

ABOVE 1.50 METERS, THE WALL SHOULD BE —

85
New cards

1.70 METERS

HEIGHT OF PERFORATED CONCRETE BLOCKS

86
New cards

7.00 METERS OR 50% OF THE SIDE PROPERTY

R1

ABUTMENT SHOULD NOT BE LONGER THAN —

87
New cards

80%

R2 - ONE SIDE ONLY

MAX OF — OF THE LENGTH OF SIDE OF PROPERTY LINE

88
New cards

85%

65%

R3 - OPTION A

SIDE

PERIMETER

89
New cards

90% (SIDE + REAR)

100% (IF REAR IS 4 METERS)

50% PERIMETER


R3 - OPTION B

SIDE

REAR

PERIMETER

90
New cards

85%

50%

R4 - TWO SIDES

SIDE

PERIMETER

91
New cards

75%

50%

R5 - OPTION A

SIDE

PERIMETER

92
New cards

65%

50%

60%


R5 - OPTION B

SIDE

REAR

PERIMETER

93
New cards

ACCORDING TO THE NBCP, FIRE RATED GLASS BLOCKS CAN BE USED IN FIREWALLS

FIREWALL OPENINGS

INFORMATION ONLY

94
New cards


ALLOWABLE FIREWALLS IN COMMERCIAL, INSTITUTIONAL, AND INDUSTRIAL

95
New cards

TOTAL GROSS FLOOR AREA (TGFA)

96
New cards

GRADE LINE

97
New cards

TAKE THE HIGHEST GRADE

ESTABLISHING THE GRADE LINE

IF THE SLOPE HEIGHT IS LRS THAN 3 METERS —

98
New cards

TAKE THE AVERAGE


ESTABLISHING THE GRADE LINE

IF TEHE SLOPE HEIGHT IS HIGHER THAN 3 METERS —

99
New cards

ROOFTOP

IF THE ROOF IS FLAT, THE TOP IS?

100
New cards

MIDDLE OF ROOF HEIGHT

IF THE ROOF IS SLOPING, THE TOP IS?