1/77
Looks like no tags are added yet.
Name | Mastery | Learn | Test | Matching | Spaced |
|---|
No study sessions yet.
Division 2
Existing Conditions
Geophysical investigations
Division 2
Demolition
Division 2
Structure moving
Divison 2
Mold Remediation
Division 2
Division 3
Concrete
Concrete Formin
Division 3
Tilt-up Concrete
Division 3
Concrete Curing
Division 3
O'keeffe's Terminator Reglet
Division 3
Embedded Anchor
Division 3
Division 4
Masonery
Glass Masonry Units
Division 4
Concrete Masonry Unit
Division 4
Division 5
Metals
Steel Joist framing
Division 5
Steel decking
Division 5
Cold formed Metal framing
Division 5
Metal specialities
Division 5
Metal Stairs
Division 5
Division 6
Woods
Glue-Lam Construction
Division 6
Plastic Fabrications
Division 6
Custom Cabinets and Hardware
Division 6
Fasteners
Division 6
Division 7
Thermal and Moisture protection
Dampproofing
Division 7
Roof tiles
Division 7
Wood Shingles
Division 7
Built-Up Bituminous Roofing
Division 7
Flashing and Sheet Metal
Division 7
Siding
Division 7
Roof hatch
Division 7
Division 8
Openings
Louvers
Division 8
Vents
Division 8
Curtain Walls and Glazed assemblies
Division 8
Division 9
Finishes
Terrazo Flooring
Division 9
Gypsum Board
Division 9
Access Flooring
Division 9
Division 10
Specialties
Chalkboards
Division 10
Lockers
Division 10
Cubicles
Division 10
Division 11
Equipment
Residential appliances
Division 11
Division 12
Furnishings
Curtains and Drapes
Division 12
Division 13
Special Construction
Radiation Protection
Division 13
Ice Rinks
Division 13
Sound
Vibration and Seismic control
Swimming Pools
Division 13
Geodesic Structures
Division 13
Division 14
Conveying Systems
Elevators
Division 14
Moving Walks
Division 14
Division 21
Fire suppression
Sprinkler system
Division 21
Domestic Water Softeners
Division 21
Divison 22
Plumbing
Division 23
Mechanical
Furnaces
Division 23
HVAC Ducts and Casings
Division 23
Division 26
Electrical
Interior Lighting
Division 26
Exterior Luminaries
Division 26
Audio-Video Communications
Division 27
Division 31
Site Requirements
Soil Treatment
Division 31
Cofferdams
Division 31
Tunneling and Mining
Division 31
Excavation and Fill
Division 31
Underpinning and Slurry Walls
Division 31