Radial Distribution
A separate feeder is used to feed power from the substation to each area and this feeder feeds power to a distributor in one direction only
Ring Distribution
The distribution transformer is connected in a loop and supplied by a substation from one end. It means each distribution transformer has two different ways to connect with the substation
Radial Distribution
Type of distribution network characterized by a single line feeder . . .
a. Reactive . . .
What is the purpose of static condenser? a. Reactive . . . b. Voltage regulator c. AC to DC converter d. Regulates current
a. Current is directly proportional to transmission current and square of the distance
Power supply network characteristic. . . a. Current is directly proportional to transmission current and square of the distance b. proportional to transmission current and distance c. Single phase cannot be converted into 3 phase using inverter d. Increasing transmission voltage to reduce conductor requirements
a. Installing low power factor correction
Solution for low power factor?
Primary
A type of alarm that will automatically shutdown the system
b. Power loss due to transmission . . .
Principles of power supply network except: a. Three phase power . . . b. Power loss due to transmission . . . c. A single phase cannot be converted . . . d. Increasing the transmission voltage . . .
Instrument Transformer
Type of transformer used as transducer
Poles
All are the same except?
ICAO Doc 9157
An ICAO document that contains the power supply standards requirements for an Aerodrome?
Mechanical Interlock
It is a mechanical device provided on each of the main Auto-transfer breaker, as a gadget to prevent two or more breakers to closed at the same time
2405 A
Ifl @ Secondary, combi (200kVA @ 34.5/19/92 – 0.48/0.277 kV)
Time Delay Breaking
It is commonly known as short time circuit breaker setting (100% - 110% for 0.05 sec – 0.4 sec)
11,000 V
What is the National Grid standard low voltage distribution voltage?
Zigzag Transformer
Transformer which provides neutral grounding derived from delta transformation
Overload Switch
Which of the following is not a current protection device
Overload Trip
It is commonly known as long time circuit breaker setting (80% - 100% for 0.5 sec -20sec)
conductor
Increasing the transmission voltage will decrease the current and minimized the power loss in transmission lines and also decreases its ______ requirements
D. POLES
When Gen 1 transfers to Gen 2, which of the following parameters will change? A. VOLTAGE B. FREQUENCY C. PHASE D. POLES
Positive, Negative, zero sequence
Symmetrical component of current
Load Break Switch
Switches that are provided with an interrupting device capable of disconnecting circuits under load
Prime mover
Any mechanical device used to drive a generator to produce electricity
Distribute power to the consumer
What is the purpose of power distribution system?
Vaults and shelter
Installed within the aerodrome for the protection of electrical equipment against weather and for better security
reroute
The engineers at the central control of the National Grid Network continually asses the demand, direct the flow and ______ electrical energy when breakdown occurs
Short Circuit
There are two conductors having different voltage, what happens when these conductors touch each other?
Poles
Parallel Generator
297.36 KVAR
S=1000 KVA, pf1=0.68, pf2=0.90. Compute for the power factor
Intensity of light
The “maximum switch over time†is defined as the duration for the measured _____ to fall from 50% of the original value and recover to 50% during a power supply changeover
2000 – 5500 V
The voltage is reduced at the aerodrome substation to an intermediate voltage for distribution. What is the range of an intermediate voltage?
33,000 V
What is the National Grid standard network distribution voltage?
Surge Protective Device
It is a protective device designed to protect electrical equipment loads against the damaging effects of transient voltages that can be induced or generated as a result of remote lightning, power equipment switching or high frequency disturbances
Uninterruptible Loads
It include all CNS equipment, critical airfield lightings (1 sec maximum transfer time), alarms, protection devices, and computers, wherein power interruption may result to an accident, serious incident, life threat or financial loss.
Runway Visual Range less than 800 m
Aerodromes that will require a stipulated transfer time of 1 second for the IPU to be brought into operation
228.75 V
A Panel Board 238 V (L-L) at its bus bar. Supplying power to a 3-phase load with a balanced current of 15 A through a 3 – 2.0 mm2 THHN wire at a length 35 meters. What will be the load terminal voltage? Assume R(wire) = 3.1 ohms/305 m and X(wire) = 0.073 ohms/305 m from line to neutral
24 – 72 hours
Engine-generator sets are often expected to operate without refueling for how many hours?
Synchronizer
What is the device used to simultaneously load two or more AC power sources?
D. Voltage Regulator
Primary purpose of substation in a power distribution system? A. Power Distribution B. Power Transmission C. Energy Storage D. Voltage Regulator
230.94 V
Given 400 V/√3 , solve for the secondary voltage
Grid distribution (GRID or MESH distribution ay same lang)
What type of distribution system has a central substation and distributes power to the multiple interconnected substation? A. Radial Distribution B. Ring Distribution C. Interconnected Distribution D. Grid Distribution
80 batteries
48 V, 12-V, 3 A, 108 AH battery, 30 days. How many batteries are needed?
over 5000 V
Power to the aerodrome main power substation is usually supplied at a high voltage
Overload Relay
Not considered as protective device
Independent
For major airports, it is desirable to have at least two incoming power sources must be ___
22 KA
Isc @ secondary, neglecting conductor: 100 KVA, 34.5 – 0.46 KV, 5.70% Z, heater load at 70%
7 A
3 phase (Vp = 34.5 KV, Vs = 230 V, Is= 1050 A) Solve for primary current
38.51
12.9 HP, divide all given then divide by √3
0.01 per unit
1000 KVA, 0.001 pu, 100 KVA
Install power factor conversion capacitor
Which soluton is commonly employed to improve a low power factor in an electrical system?
870 KVA
3-500 KVA, Y-Y connection Solve for the maximum power that can be generated if one 500 KVA is removed (ganyan ang thought, basta yan)