1/34
Looks like no tags are added yet.
Name | Mastery | Learn | Test | Matching | Spaced | Call with Kai | Chat |
|---|
No analytics yet
Send a link to your students to track their progress
Timing Closure
Reaching an implemented FPGA design whose constrained timing requirements are satisfied.
Timing Closure Is an Implementation Property
Timing closure concerns whether the physically implemented machine satisfies the timing requirements imposed on it.
Timing Closure Is a Loop
Timing closure is an iterative process of analyzing timing, diagnosing failing paths, revising the design, reimplementing it, and checking timing again.
Timing-Closure Loop
RTL + constraints → synthesis → placement → routing → static timing analysis → requirements checked → either timing closed or diagnose, revise, and implement again.
Functionally Correct but Timing-Failing
A design can produce correct behavior in simulation while its implemented FPGA still fails required timing relationships.
Positive Timing Margin ≠ Functional Correctness
Meeting implementation timing requirements does not prove that the arithmetic algorithm or functional behavior is correct.
Two Independent Proofs
Functional verification asks whether the machine behaves correctly; timing closure asks whether the implemented machine can obey its timing contract.
Timing Constraint
A requirement that tells the implementation and static timing analysis tools what timing relationship the physical design is expected to satisfy.
Physical Timing Contract
The set of constrained timing relationships that the implemented FPGA is required to satisfy.
Clock Constraint
A timing requirement that establishes the clock relationship against which relevant implementation paths are analyzed.
Requested Clock Period
The allowed clock interval that establishes how much time the relevant launch-to-capture work is given under the clock constraint.
10 ns Clock Constraint
A requirement in which the relevant launch, logic/routing, and capture relationship must fit within the imposed 10 ns timing relationship.
Testbench Clock
A simulation mechanism that schedules clock events; by itself it does not impose the physical implementation timing contract.
Testbench Clock vs Physical Clock Constraint
A testbench clock schedules simulation events, while a physical timing constraint tells implementation and timing tools what performance relationship to analyze.
Constraint Before Performance Claim
A meaningful Fmax or timing-margin claim requires knowing which timing relationships were actually constrained and analyzed.
Static Timing Analysis
The analysis stage that evaluates implemented paths against their specified timing requirements.
Timing Analysis Requires Requirements
Static timing analysis needs constraints so that actual implemented timing can be compared against required timing.
Constrained Timing Relationship
A timing relationship for which the analysis tool has a stated requirement against which implementation behavior can be evaluated.
Routed Netlist → Timing Evidence
Static timing analysis takes the physically implemented design and organizes its timing behavior into analyzable paths and timing results.
Timing Path Report
A report that decomposes an implemented timing journey into launch, data-path, capture, arrival-time, required-time, and slack evidence.
Source / Startpoint
The beginning of an analyzed timing path, such as the launch register in a register-to-register path.
Destination / Endpoint
The end of an analyzed timing path, such as the capture register in a register-to-register path.
Launch-Side Evidence
Timing-path information associated with the source, including clock arrival and clock-to-Q behavior.
Data-Path Evidence
The accumulated physical journey through resources such as LUTs, carry structures, muxes, and routing between the startpoint and endpoint.
Capture-Side Evidence
Timing-path information associated with the destination, including required arrival and setup-related requirements.
Actual Arrival Time
The timing report's determination of when data reaches the analyzed destination through the implemented path.
Required Arrival Time
The time by which the analyzed data is required to reach the destination according to the imposed timing relationship.
Actual Arrival vs Required Arrival
The timing comparison from which the report determines the path's slack.
Named Physical Evidence
A timing report identifies actual cells, nets, logic levels, routing segments, endpoints, and accumulated delay rather than leaving the critical path as an abstract concept.
Accumulated Delay
The delay built up as the signal travels through the implemented logic and routing along the analyzed timing path.
Timing Report Connects Time to Geography
The timing report shows how much time the physical cells and routes established during implementation actually consume.
Read Timing Paths Causally
Follow the path from startpoint → logic/routing journey → endpoint → arrival time → required time → slack instead of looking only at the final slack number.
Startpoint → Logic/Routing → Endpoint → Arrival Time → Required Time → Slack
The causal reading order for understanding an analyzed timing path.
Final Slack Number Alone
Is insufficient for understanding why a path has its reported timing behavior; the physical path evidence provides the causal context.
Part 04 → Part 05
Part 04 established where cells and routes physically exist; Part 05 determines how much time those physical structures consume and whether they satisfy the imposed timing contract.