4. Updating Switch Station 5 Documentation

0.0(0)
Studied by 0 people
call kaiCall Kai
Locked
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/8

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 1:36 PM on 7/21/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

9 Terms

1
New cards

While working on…

While working on my second project, I found major discrepancies among the circuit design, relay type, and relay manufacturer in switch station 5 between the ETAP model, as-found photos, and the single-line drawings.

2
New cards

And so, my 3rd…

And so, my 3rd project emerged from this discovery, and I was tasked with correcting these inconsistencies in the single-line drawings and ETAP model in order to match what was found in the field

3
New cards

For example, if…

For example, if you look closely at the single-line drawing of switch station 5 on circuit 1522, we find a power meter and a 50/51 and 50 ground relay.

4
New cards

However, this configuration…

However, this configuration is not reflected in the field.

5
New cards

Instead, we see…

Instead, we see that an SEL 751 protective relay that has replaced the 50 and 51 relays as well as the power meter.

6
New cards

After extensive revisions…

After extensive revisions and drawing reviews with my team, I submitted a DCN form and am now waiting for an update from document controls.

7
New cards

Due to the…

Due to the lack of sufficient documentation, this project is a part of a larger effort to accurately document the electrical architecture and equipment to reflect what is currently out in the field.

8
New cards

Without the proper…

Without the proper documentation, our team cannot perform many essential tasks, such as accurately addressing technical issues, developing project scope, and identifying potential safety hazards.

9
New cards

In addition to…

In addition to learning about the importance of keeping accurate documentation, this project taught me the basic guidelines for redlining drawings and the extensive process of drawing review, which are some of the most fundamental skills a project engineer must know.