Physical Fieldwork (Eastbourne)

0.0(0)
studied byStudied by 0 people
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
Card Sorting

1/22

flashcard set

Earn XP

Description and Tags

Sub-questions, Primary Research, Secondary Research, Presentation Techniques + 9 Marker Plan

Study Analytics
Name
Mastery
Learn
Test
Matching
Spaced

No study sessions yet.

23 Terms

1
New cards

What is the Title of the Physical Fieldwork Enquiry?

How Effective is Coastal Management in Eastbourne?

2
New cards

What are the Three Sub-Questions?

  1. What Processes are Affecting the Coastline?

  2. What Types of Coastal Management are Used?

  3. How Effective are Groynes at Stopping Longshore Drift?

3
New cards

What does Accuracy + Reliability mean?

  • Accuracy → How CLOSE a MEASUREMENT is to its TRUE VALUE → NO BIAS + HUMAN ERROR

  • Reliability → How CONSISTENTLY a METHOD measures → LARGE SAMPLE SIZE + REPEATS + AVERAGE

4
New cards

What are my Four Primary Research Methods?

  • LONGSHORE DRIFT SURVEY

  • BIPOLAR EVALUATION of GROYNES

  • BEACH PROFILE

  • GROYNE PROFILE

5
New cards

How to do a Longshore Drift Survey?

  1. Put APPLE into Sea

  2. SEE DIRECTION it moves

  3. TIME how long it takes to go 10m

6
New cards

What is an Advantage of a Longshore Drift Survey?

  • Showed DIRECTION of LONGSHORE DRIFT

  • 2 SITES → RELIABLE

7
New cards

What is a Disadvantage of a Longshore Drift Survey?

  • HUMAN ERROR → INACCURATE

8
New cards

How to do a Bipolar Evaluation of Groynes?

  1. Look at RANDOM GROYNE

  2. Fill out SURVEY on SCALE from -3 to 3 (e.g Able to Control Flooding, Aesthetics, Safety)

9
New cards

What is an Advantage of a Bipolar Evaluation of Groynes?

  • QUICK

10
New cards

What is an Disadvantage of a Bipolar Evaluation of Groynes?

  • SUBJECTIVE → INACCURATE

  • NOT PROPORTIONATE SAMPLE → 2/94 GROYNES

11
New cards

How to do a Beach Profile?

  1. Put RANGING POLES 2m APART

  2. Measure ANGLE from ONE POLE TO NEXT using CLINOMETER

  3. REPEAT along LENGTH of Beach

12
New cards

What is an Advantage of a Beach Profile?

  • 2 SITES → RELIABLE

  • QUANTITATIVE

13
New cards

What is a Disadvantage of a Beach Profile?

  • HUMAN ERROR → INACCURATE

14
New cards

How to do a Groyne Profile?

  1. Measure HEIGHT of TOP OF GROYNE TO BEACH

  2. Repeat along LENGTH of GROYNE

  3. Repeat on OTHER SIDE

15
New cards

What is an Advantage of a Groyne Profile?

  • QUANTITATIVE DATA

16
New cards

What is an Disadvantage of a Groyne Profile?

  • HUMAN ERROR → INACCURATE

17
New cards

What was my Secondary Research?

GOVERNMENT WEBSITES:

  • 94 GROYNES

  • 3.65KM of CONCRETE SEA WALL

  • BEACH REPLENISHMENT

18
New cards

What were my Four Presentation Techniques?

  • Longshore Drift Survey → BAR GRAPH → DISCRETE DATA

  • Bipolar Evaluation → RADIAL GRAPH → COMPARE VISUALLY

  • Beach Profile → CROSS-SECTION → Shows ANGLE CHANGE

  • Groyne Profile → BAR GRAPH → DISCRETE DATA

19
New cards

What did my Longshore Drift Survey show?

  • Travelled EAST

  • 37s to travel 10m at ONE SITE

  • 33s to travel 10m at OTHER SITE

20
New cards

What did my Bipolar Evaluation show?

  • NEGATIVE

  • -2 on CONTROLLING FLOODING

  • -3 on SAFETY

21
New cards

What did my Beach Profile show?

  • STEEP then FLAT

  • At 2m, it was 23°

  • At 36m, it was 0°

22
New cards

What did my Groyne Profile find?

  • MORE SEDIMENT on WESTERN GROYNE

  • 1.5m on WESTERN SIDE

  • 1m on EASTERN SIDE

23
New cards

What is my 9 Marker Plan?

How Effective is Coastal Management at Eastbourne?

P1: What Processes are Affecting the Coastline?

  • LSD Survey → Apple in Sea + Measure Time to travel 10m

  • EAST + 37s + 33s

  • LSD takes place + goes EAST

  • However, LESS ACCURATE because HUMAN ERROR → Don’t know SPEED

  • RELIABLE because 2 SITES

P2: What Types of Coastal Management are Used?

  • GOVERNMENT WEBSITES

  • 94 GROYNES

  • GROYNES STOP LSD by acting as PHYSICAL BARRIER

  • ACCURATE, UP-TO-DATE because GOVERNMENT Websites

P3: How Effective are Groynes at Stopping Longshore Drift?

  • GROYNE PROFILE → Measure amount of Sediment on Each Side

  • 1m MORE SEDIMENT on WESTERN SIDE

  • Groynes EFFECTIVE because they BLOCK SEDIMENT

  • However, NOT PROPORTIONATE because only 2/94 Groynes

Conclusion:

  • 2/3 VALID CONCLUSIONS