1/4
Looks like no tags are added yet.
Name | Mastery | Learn | Test | Matching | Spaced | Call with Kai | Chat |
|---|
No analytics yet
Send a link to your students to track their progress
PPE for the warehouse floor
Gloves, hi-vis vest and steel-capped boots, worn before you pass the airlock doors
Safe manual lifting limit
25 kg maximum for a single-person lift; anything heavier needs a second person or a trolley
Forklift exclusion zone
Stay 3 metres clear of an operating forklift and make eye contact with the driver before crossing an aisle
Chemical spill procedure
Tag the area, report to the shift supervisor, and never clean a chemical spill yourself
Fire assembly point
The muster sign in the staff car park; check in with your shift leader so the count is right