where are the reliable instruments in regards to a control room fire? what makes them reliable?
B train in the remote shutdown panel
reliable due to isolators in their circuits
what actions are taken prior to evacuating the CR during a CR fire?
TRIP THE RX (SPTAs are not performed)
check power lowering
check all FSCEAs have inserted
initiate an MSIS to prevent SG overfill (90 second time critical action)
what actions are taken at the remote shutdown panel during a CR fire?
determine the status of PBB-S04, evaluate if B train is powered from off site, the EDG, or de-energized
how is pressure control maintained during a CR fire?
B class B/U PZR heaters controlled from RSP or with local breaker operation
control of the B aux spray valves
during a CR fire which AFW pump will be used?
AFW pump B will be used
what are the time critical actions associated with a CR fire?
90 seconds initiate an MSIS
5 minutes ADV disconnects in local
disable charging pumps A and E to prevent draining the VCT
(times taken from when VCT is isolated)
14 min for 3 pumps
22 min for 2 pumps
44 min for 1 pump