Textiles- Unit 1: New and ~emerging Technolgoies

5.0(1)
Studied by 6 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/15

Last updated 3:32 PM on 4/12/23
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai

No analytics yet

Send a link to your students to track their progress

16 Terms

1
New cards
What is automation?
The use of computers to automatically run a production line
2
New cards
What is CAD?
Computer programs that designers use to draw detailed designs and model ideas
3
New cards
Benefits of CAD
\-Easily shared with client

\-Testing without waste

\-Used to program CAM
4
New cards
What is CAM?
Uses codes converted from CAD drawings to program machines to shape and engrave material
5
New cards
What are flexible manufacturing systems?
A series easily reprogrammable machines used in the production of a product
6
New cards
What can Flexible manufacturing systems do?
\-Restock shelves

\-Transfer and assemble parts

\-Manufacture parts

\-Check quality
7
New cards
What is Just in time manufacturing (JIT)?
When parts needed for manufacturing arrive just as they are needed
8
New cards
Advantages of JIT
\-Less storage space needed

\-Minimal waste

\-Easily change factories to making other products
9
New cards
Disadvantages of JIT
\-If there is a problem with supplier, process is delayed

\-Unexpected demand could lead to delays
10
New cards
What’s Lean Manufacturing?
A process looking at the whole manufacturing process and works to create the best product to meet consumer demand
11
New cards
What does lean manufacturing include?
\-Efficient working

\-JIT Manufacturing

\-Continuous improvment

\-Quality assurance

\-Customer feedback
12
New cards
What are the main stages in Life cycle assessments (LCA)?
\-Extraction of raw materials

\-Manufacture and assembly

\-Transportation

\-Use

\-Disposal
13
New cards
How can designs investigate different ways to reduce the negative impact at each stage of LCA’s?
\-Alternative materials//manufacturing processess

\-Sourcing local materials or relocating factories to reduce transportation

\-Reducing parts

\-Alternative energy sources

\-Labelling for recycling
14
New cards
What is a finite resource?
Non renewable resources that are bad for the environment
15
New cards
Examples of finite resoruces
\-Oil

\-Gas

\-Coal
16
New cards
What are some ways to reduce waste?
\-Recycling schemes for household rubbish

\-Creating products with replaceable parts

\-Using more recycling materials