National Building Code Rule VII and VIII Vocabulary

0.0(0)
Studied by 0 people
call kaiCall Kai
Locked
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/28

flashcard set

Earn XP

Description and Tags

Flashcards covering key classification terms, building parameters, and development control standards from Rules VII and VIII of the Philippine National Building Code.

Last updated 9:48 PM on 8/24/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

29 Terms

1
New cards

Group A Occupancies

Residential dwellings including single-family dwellings in Division 1 and exclusive non-leasing occupant structures not exceeding 1010 persons in Division 2.

2
New cards

Group B Occupancies

Multiple residential dwelling units accommodating more than 1010 persons, including boarding houses, hotels, apartment buildings, and row houses.

3
New cards

Group C Occupancies

Buildings used for school or day-care purposes involving assemblage for instruction, education, or recreation.

4
New cards

Group D Occupancies

Institutional buildings divided into Division 1 (mental hospitals, jails, prisons), Division 2 (nurseries, hospitals, nursing homes for non-ambulatory patients accommodating more than 55 persons), and Division 3 (nursing homes for ambulatory patients accommodating more than 55 persons).

5
New cards

Group E Occupancies

Business and mercantile occupancies including gasoline filling stations and storage garages (Division 1), wholesale/retail stores, offices, and dining establishments under 100100 persons (Division 2), and aircraft hangars or open parking garages (Division 3).

6
New cards

Group F Occupancies

Light industrial occupancies using incombustible and non-explosive materials, including ice plants, power plants, pumping plants, cold storage, and creameries.

7
New cards

Group G Occupancies

Storage and hazardous industrial occupancies categorized into five divisions based on storage of hazardous/flammable materials, woodworking, repair garages, and aircraft repair hangars.

8
New cards

Group H Occupancies

Assembly buildings for an occupant load of less than 10001000, including structures with or without stages, stadia, and reviewing stands.

9
New cards

Group I Occupancies

Any assembly building with a stage and an occupant load of 10001000 or more.

10
New cards

Group J Occupancies

Accessory structures including agricultural buildings (Division 1), private garages, carports, and fences over 1.80meters1.80\,\text{meters} high (Division 2), and stages, courts, tombs, mausoleums, or vaults (Division 3).

11
New cards

Basic R-2

A single-attached or duplex building/structure of from one (11) storey up to three (33) storeys in height with each unit for separate use as single-family dwellings.

12
New cards

Maximum R-2

A low-rise multi-level building/structure of from three (33) up to five (55) storeys in height for use as multiple family dwellings.

13
New cards

Basic R-3

A rowhouse building/structure of from one (11) storey up to three (33) storeys in height with each unit for separate use as single-family dwellings.

14
New cards

Maximum R-3

A medium-rise multi-level building/structure of from six (66) up to twelve (1212) storeys in height for use as multiple family dwellings.

15
New cards

Residential R-4

A medium to high-density residential use characterized mainly as a low-rise townhouse building/structure on an individual lot for exclusive use as multiple family dwellings.

16
New cards

Residential R-5

A very high-density residential use characterized mainly as a medium-rise or high-rise condominium building/structure for exclusive use as multiple family dwellings.

17
New cards

Allowable Maximum Building Footprint (AMBF)

The resultant area established at grade level upon which a proposed building or structure may stand, measured horizontally from property lines or firewalls.

18
New cards

Building Height Limit (BHL)

The maximum height allowed for buildings or structures based on their proposed use or occupancy, generally measured from established grade line to the topmost portion.

19
New cards

Floor to Lot Area Ratio (FLAR)

The ratio of total floor area to total lot area, serving as the primary or initial determinant of building bulk.

20
New cards

Gross Floor Area (GFA)

The total floor space within the perimeter of permanent external building walls, inclusive of main and auxiliary buildings, corridors, lobbies, and balconies, but excluding specified parking, utility, and open areas.

21
New cards

Total Gross Floor Area (TGFA)

The total floor space within main and auxiliary buildings consisting of the GFA, enclosed support areas, and usable horizontal surfaces attached to the building above or below grade level.

22
New cards

Outermost Faces of Building (OFB)

The outer boundary limits established by the vertical projections of the outermost faces of the Allowable Maximum Building Footprint up to the prescribed Building Height Limit.

23
New cards

Allowable Maximum Volume of Building (AMVB)

The maximum 3D volume of a proposed building determined by multiplying the AMBF by the BHL and reduced by superimposing angular planes originating from the RROW centerline.

24
New cards

Percentage of Site Occupancy (PSO)

The percentage of the total lot area occupied by the building footprint taken at ground level.

25
New cards

Total Open Space within Lot (TOSL)

The portions of the total lot area not occupied by the Maximum Allowable PSO, consisting of the Impervious Surface Area (ISA) and Unpaved Surface Area (USA).

26
New cards

Impervious Surface Area (ISA)

The paved or tiled (hardscaped) open spaces within the total lot area.

27
New cards

Unpaved Surface Area (USA)

The unpaved, exposed soil and softscaped planted portion of open space within a lot.

28
New cards

Planned Unit Development (PUD)

Land development or redevelopment schemes governed by a Comprehensive Development Master Plan (CDMP) that permits flexibility in planning, urban design, and building siting.

29
New cards

Four-Hour Fire-Resistive Occupancy Separation

An occupancy separation of not less than four-hour fire-resistive construction having absolutely no openings therein.