[F1-FORMATIVE] Module 1

0.0(0)
Studied by 0 people
call kaiCall Kai
Locked
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/44

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 2:12 PM on 8/29/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

45 Terms

1
New cards

The _______ phase identifies whether or not there is the need for a new system.

Group of answer choices

planning

Planning

PLANNING

Planning

2
New cards

The seventh and final phase involves ______________, regular operations and required updates.

MAINTENANCE

3
New cards

___________ Software resides within a product or system to implement control features for the user and system itself.

EMBEDDED

4
New cards

The systems development life cycle concept applies to a range of hardware and software configurations.

Group of answer choices

True

False

True

5
New cards

Software Engineering is a ____ that holds the technology layers together

GLUE

6
New cards

Closed Systems or probabilistic systems are those in which outputs or results can't be determined precisely but can only be guessed.

Group of answer choices

True

False

False

7
New cards

___________ is a discipline or profession of acquiring and applying technical, scientific or mathematical knowledge to design and implement structures, systems and processes to realize a desired objective

ENGINEERING

8
New cards

A ______ system may be internet-based or combined with e-mail

WORKFLOW

9
New cards

System is a set of interacting or interdependent entities, real or abstract, forming an integrated whole.

Group of answer choices

True

False

True

10
New cards

This phase involves the actual installation of the newly-developed system, putting the project into production by moving the data and components from the old system and placing them in the new system via a direct cutover.

Group of answer choices

Analysis

Maintenance

Planning

Implementation

Implementation

11
New cards

SDLC is used during the development of an IT project and describes the different stages involved in the project from the drawing board, through the completion of the project.

Group of answer choices

True

False

True

12
New cards

_________ Workflow System deals with the shaping of product, sales proposals and strategic plans

AD-HOC

13
New cards

The phase where a businesses will work on the source of their problem or the need for a change.

Group of answer choices

Analysis

Testing

Development

Design

Analysis

14
New cards

DSS is used for periodic report generation in a scheduled manner. It is also used for producing reports on demand as well as exception reports.

Group of answer choices

True

False

False

15
New cards

Product-line Software is designed to provide specific capabilities for many customers.

YES

16
New cards

The ____________ phase signifies the start of production

DEVELOPMENT

17
New cards

Software Engineering is a layered technology and its foundation is the process layer.

Group of answer choices

True

False

True

18
New cards

_________ is a collection of activities, actions and tasks, performed when creating work products.

PROCESS

19
New cards

__________ Software is a collection of programs written to service other programs.

SYSTEM

20
New cards

SDLC is used during the _____________ of an IT project and describes the different stages involved.

DEVELOPMENT

21
New cards

_____________ Software are usually stand-alone programs that solves specific business needs.

APPLICATION

22
New cards

MIS provides___________ information to managers and decision makers.

ROUTINE

23
New cards

SDLC can apply to technical and non-technical systems involving hardware and software.

Group of answer choices

True

False

True

24
New cards

Systems testing phase involves systems___________ and system testing.

INTEGRATION

25
New cards

It is the phase where verification and validation, both of which will help ensure the program's successful completion.

Group of answer choices

Maintenance

Planning

Testing

Implementation

Testing

26
New cards

The following are the tools that businesses can use, specific to the analysis phase, except for one. Which is it?

Group of answer choices

Structured Analysis

CASE

SDLC

Requirements Gathering

SDLC

27
New cards

EIS provides the management routine summary of basic operations of the organization

Group of answer choices

True

False

False

28
New cards

Software are data structures that enable the programs to manipulate information (such as databases).

Group of answer choices

True

False

True

29
New cards

In SDLC, documentation is crucial, regardless of the type of model chosen for any application.

Group of answer choices

True

False

True

30
New cards

System Software is a glue that holds the technology layers together and enables rational and timely development of computer software

Group of answer choices

True

False

False

31
New cards

It describes the stages involved in an information system development project, from an initial feasibility study through maintenance of the completed application.

Group of answer choices

Programming

SAD

Software Engineering

SDLC

SDLC

32
New cards

The ______ phase is when the majority of the code for the program is written.

IMPLEMENTATION

33
New cards

______ focuses on small, but well-defined objectives to produce a tangible outcome.

TASK

34
New cards

______ is the processed data where it becomes information.

OUTPUT

35
New cards

System Software are usually stand-alone programs that solves specific business needs.

Group of answer choices

True

False

False

36
New cards

Mobile Applications encompasses a user interface that takes advantage of the unique interaction mechanisms provided by the mobile platform.

Group of answer choices

True

False

True

37
New cards

The phase when the real work begins when a programmer, network engineer and/or database developer are brought on to do the major work on the project.

Group of answer choices

Testing

Implementation

Development

Maintenance

Development

38
New cards

The phase that describes, in detail, the necessary specifications, features and operations that will satisfy the functional requirements of the proposed system which will be in place.

Group of answer choices

Development

Design

Testing

Implementation

Design

39
New cards

The phase that identifies whether or not there is the need for a new system.

Group of answer choices

Design

Analysis

Development

Planning

Planning

40
New cards

Always specify design and implement knowing someone else will have to understand what you do.

Group of answer choices

True

False

True

41
New cards

___________ may be repeated, specifically to check for errors, bugs and interoperability.

TESTING

42
New cards

Systems analysis phase is where businesses will work on the source of their _______ or the need for a change

PROBLEM

43
New cards

_______ involves data processing, classifying, and arranging, calculating data.

PROCESS

44
New cards

Software is a set of instructions/codes or computer program that when executed provides desired features, function and performance.

Group of answer choices

True

False

True

45
New cards

Software Engineering is a process or collection of methods and an array of tools that allow professionals to build high quality computer __________.

SOFTWARE