Transportation Engineering and Heavy Civil Construction Review

0.0(0)
Studied by 0 people
call kaiCall Kai
Locked
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/42

flashcard set

Earn XP

Description and Tags

Flashcards covering the fundamentals of transportation engineering design and heavy civil construction processes, roles, and materials.

Last updated 11:14 AM on 8/15/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

43 Terms

1
New cards

Planning

The first phase of the transportation project lifecycle where the owner identifies a problem.

2
New cards

Environmental Review

The process of evaluating a project's environmental impacts and determining if they can be minimized or mitigated.

3
New cards

Horizontal Alignment

The top-down view design of a roadway layout, determining where the road goes and how curves are laid out.

4
New cards

Vertical Alignment

The side view design of a roadway profile, determining grades and elevations for safety, drainage, and driver visibility.

5
New cards

Typical Section

A standard cross-sectional layout showing lane widths, shoulders, and pavement layers that represents the roadway throughout the project.

6
New cards

Cross Sections

Slices of the roadway at various locations used to show existing ground, proposed roadway, and calculate cut and fill quantities.

7
New cards

Plan View

A birds-eye view of the project showing the roadway location, lines, and stationing.

8
New cards

Profile View

A side view used to design grades, hills, drainage, and driver visibility.

9
New cards

Detail Sheets

Enlarged drawings showing construction requirements, dimensions, and materials for specific components like curbs or guardrails.

10
New cards

Topographic Survey

A survey conducted before design to collect existing site information like elevations and utilities to create a base map.

11
New cards

Construction Layout

Surveying conducted during construction to mark exact locations of roadway features on the ground.

12
New cards

Benchmark (BM)

A permanent point with a known elevation used as the reference point for all elevation measurements on a project.

13
New cards

Control Point

A point with known horizontal and vertical coordinates used as a reference for surveying and layout.

14
New cards

Stationing

A system used to identify locations along a roadway, typically measured every 100ft100\,ft from the starting point.

15
New cards

Total Station

Survey equipment used to measure precise distances and angles.

16
New cards

GPS/GNSS

Technology used to determine accurate locations using satellites.

17
New cards

Subgrade

The compacted native soil that forms the foundation of the roadway and supports all layers above it.

18
New cards

Subbase

An optional intermediate granular layer of crushed aggregate used for additional strength and drainage when existing soils are weak.

19
New cards

Base Course

A compacted layer of crushed aggregate placed above the subgrade or subbase to distribute vehicle loads.

20
New cards

Asphalt

A flexible pavement that is less expensive and easier to repair but requires more maintenance over time.

21
New cards

Concrete

A rigid pavement that is more durable and common on heavy-duty facilities, though it has a higher initial cost.

22
New cards

Mobilization

The phase in heavy civil construction involving setting up the jobsite and bringing in equipment.

23
New cards

Clearing and Grubbing

The removal of existing vegetation and debris to start with a clean site for construction.

24
New cards

Project Manager (PM)

The role responsible for budget, schedule, client communication, contracts, and overall project success.

25
New cards

Superintendent

The leader of the field who runs construction daily work, crews, equipment, safety, and productivity.

26
New cards

Foreman

The individual who directly supervises the construction crew.

27
New cards

Cut

The removal of material in areas where the existing ground is higher than the design elevation.

28
New cards

Fill

The addition of material in areas where the existing ground is lower than the design elevation.

29
New cards

Embankment

Engineered fill that is placed and compacted specifically to raise the ground or roadway.

30
New cards

Earthwork Balancing

The process of reusing suitable cut material as fill to minimize hauling and the need for imported material.

31
New cards

Borrow

Material brought onto the project site from an external source when more fill is needed.

32
New cards

Waste/Export

Excess or unsuitable excavated material that must be removed from the project site.

33
New cards

Grade

Slope expressed as vertical change relative to horizontal distance; for example, 2%2\% equals 2ft2\,ft vertical per 100ft100\,ft horizontal.

34
New cards

Lifts

Thin layers of fill that are individually placed and compacted rather than all at once.

35
New cards

Compaction

Mechanically increasing soil density by reducing air voids to improve stability and reduce settlement.

36
New cards

Optimum Moisture Content (OMC)

The moisture content associated with maximum dry density for a specified compactive effort.

37
New cards

Maximum Dry Density (MDD)

The maximum dry density of a soil as established through a laboratory compaction test.

38
New cards

Proctor Test

A laboratory test used to establish the relationship between soil moisture content and dry density.

39
New cards

Percent Compaction

The ratio of field dry density compared with laboratory maximum dry density, such as 95%95\% of MDDMDD.

40
New cards

Smooth/Vibratory Roller

Compaction equipment commonly used for granular soils.

41
New cards

Padfoot/Sheepsfoot Roller

Compaction equipment designed for cohesive soils.

42
New cards

Pneumatic Roller

Equipment that uses pressure and kneading for compaction.

43
New cards

Plate Compactor/Jumping Jack

Manual compaction equipment used for confined areas or trenches.