These vocabulary flashcards cover common construction terminology, materials, structural reinforcement techniques, and contract documentation based on the lecture notes.

Last updated 4:31 PM on 7/18/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

69 Terms

1
New cards

Over-reinforced beam

A type of beam where concrete fails instantaneously without warning after the failure of steel reinforcements.

2
New cards

Batten

A wood or metal material used to anchor and elevate a roof tile over its undersheeting.

3
New cards

Medium Density Board

A type of hardboard made from wood fibers glued under heat and pressure, utilized for doors and furniture.

4
New cards

Cantilevered beam reinforcement

Reinforced by providing extra top bars at and near the support to resist tension.

5
New cards

Concrete cover for footings

A thickness of 75mm75\,mm for cast-in-place concrete permanently exposed to earth.

6
New cards

Wrought Iron

A ferrous material with a very low carbon content which is malleable, tough, and ductile, produced from pig iron to remove impurities.

7
New cards

Differential Settlement

Relative movement of parts of a structure caused by uneven settlement of the underlying soil, for which a mat footing may be ideal.

8
New cards

Carriage Bolt

A bolt featuring a smooth, domed head with a square section underneath that prevents spinning during installation.

9
New cards

Bituminous Waterproofing

A material used for roof decks and basements that may be installed by torching to activate adhesion and often requires a concrete topping for protection.

10
New cards

Two-way slab reinforcement

Main reinforcements run in both ways if the ratio of the long span to the short span of the slab is less than 22.

11
New cards

Cantilevered slab thickness

Determined by the formula Length of Slab / 1010.

12
New cards

Slump Test

A test utilizing open-ended conical cones to measure the workability and consistency of freshly mixed concrete.

13
New cards

Undersheeting

A layer between the finishing roof material and framing that serves as an additional layer of weatherproofing and drainage.

14
New cards

End lapping for corrugated GI

The required length is 1010 to 12 inches12\text{ inches}.

15
New cards

Footing depth measurement

The measurement taken from the NCL (Natural Grade Line) to the bottom of the footing.

16
New cards

CHB wall reinforcement

Steel reinforcements laid out as 10mm10\,mm diameter every 33 rows vertical and 0.60m0.60\,m horizontal.

17
New cards

Anchor Bolts

L-shaped, machine-threaded bolts typically embedded in concrete to fasten steel or wood.

18
New cards

Dead load

The static load comprising the weight of construction materials like walls and floors that generally carry the live load.

19
New cards

Bridging

An arrangement of braces fixed between floor joists to keep them in place and distribute loads to adjacent joists.

20
New cards

Solvent

A paint component that dissolves the paint to make it usable and workable at normal room temperature.

21
New cards

Stringer

The part of a wooden staircase that supports the steps.

22
New cards

Nickel & Chromium

Specific elements added to steel to create stainless steel.

23
New cards

Suspended beam extra bottom bars

For a clear span of 8m8\,m, the length will be 4.8m4.8\,m.

24
New cards

Stirrups

Reinforcing material designed to resist shear and diagonal tension stresses in a beam.

25
New cards

Performance Specification

A specification stipulating how a component or system must perform without giving the exact means to achieve the results.

26
New cards

Temperature Bars

Reinforcements that absorb stresses resulting from shrinkage particularly during the curing of concrete.

27
New cards

Tempered Glass

Glass processed by thermal or chemical treatments to create outer compression and interior tension, causing it to shatter into small granular chunks when broken.

28
New cards

End Bearing Pile

A pile that depends on the resistance of soil or rock beneath its foot for stability.

29
New cards

Curing

The hardening of concrete requiring time, favorable temperature, and the continuous presence of water or moisture.

30
New cards

Rivet

A metal pin used for joining members by passing a headed shank through a hole and hammering the plain end to form a second head.

31
New cards

Gusset plate

A plate providing a greater surface area to connect chords and web members together through welding or bolting.

32
New cards

Substrate

A layer of gravel placed on undisturbed soil to prevent the capillary rise of moisture to a ground slab.

33
New cards

Cantilever beam

A type of beam that is supported on only one side.

34
New cards

Cementitious Waterproofing

A waterproofing technique using cement that requires no specialized expertise for installation.

35
New cards

Wrinkling

A paint defect occurring when the top coat dries before the bottom layer, often when paint is too wet.

36
New cards

Piles

Long slender columns of wood, steel, or reinforced concrete driven vertically into the earth to form a foundation system.

37
New cards

Grout

A fluid cement mortar containing a considerable amount of water and cement used to fill narrow cavities in masonry.

38
New cards

Mortar

A mixture of water, cement, and fine aggregates, such as sand, used as a bonding agent.

39
New cards

Welding

A fabrication process that joins materials, usually metals or thermoplastics, through the process of coalescence.

40
New cards

28 days

The duration required for concrete to reach approximately 90%90\text{\%} of its compressive strength and be considered fully cured.

41
New cards

Fine Aggregate

Inert granular materials smaller than 9mm9\,mm in diameter.

42
New cards

Course Aggregate

Inert granular materials over 9mm9\,mm in diameter.

43
New cards

Batch Box

A container of known volume used to ensure proper proportions of concrete, plaster, or mortar constituents.

44
New cards

Admixture

An ingredient added to concrete other than water, aggregate, lime, or cement immediately before or during mixing to modify its properties.

45
New cards

Foundation Bed

The soil or rock located directly beneath the footing.

46
New cards

Honeycomb

Voids left in concrete due to the failure of mortar to effectively fill spaces among coarse aggregate particles.

47
New cards

Spacer

A piece of concrete used to hold or support steel reinforcement in its proper position.

48
New cards

Tied Column

A column with reinforcement consisting of vertical bars held in position by lateral ties.

49
New cards

Dowel

Short reinforcing steel bars extending into two abutting pieces of concrete to increase joint strength.

50
New cards

16 GI Wire

The size of wire typically used to attach or connect steel reinforcement.

51
New cards

Splice

To connect two similar members in a straight line by fastening lapped ends using mechanical connectors, welding, or wire.

52
New cards

Gauge

The term used to describe the thickness of galvanized iron (GI) roofing.

53
New cards

Flashing

Material designed to prevent water penetration and provide drainage between a roof and a wall.

54
New cards

Gutter

A shallow channel below and along eaves used to catch and carry off rainwater.

55
New cards

Purlin

A horizontal timber or steel member laid on rafters to support common rafters or roof coverings.

56
New cards

King Post

A vertical member in a truss extending from the apex of inclined rafters to the tie beam.

57
New cards

Chord

A principal member of a truss extending from one end to the other to resist bending.

58
New cards

Fascia Board

A board nailed horizontally to the ends of roof rafters.

59
New cards

Gable Roof

A common and economical roof form made of triangular sections with two slopes meeting at a center ridge.

60
New cards

Hip Roof

A roof with four straight sides that all slope toward the center of the building.

61
New cards

Mansard Roof

A roof with two sides sloping steeply toward the center, forming a flat deck on top.

62
New cards

Cove

A concave interior molding used at the transition from wall to ceiling or floor.

63
New cards

Baseboard

A flat projection at the base of an interior wall covering the joint between the floor and the wall.

64
New cards

Addenda

Written or graphic instruments that clarify, correct, or add to specifications before contract execution.

65
New cards

Change Orders

A type of contract modification authorizing a change in work, contract sum, or contract time after the agreement is signed.

66
New cards

Descriptive Specification

A specification stipulating exact quantities and qualities of materials and installation methods.

67
New cards

Integral waterproofing

A type of waterproofing mixed directly into concrete that does not require skilled workmanship.

68
New cards

Annealed glass

Float glass that has undergone controlled cooling to prevent residual stress; it can be cut, drilled, and polished.

69
New cards

Effective depth

The measure from the top of a concrete beam to the center of the bottom reinforcement bar.