2 - Formal system analysis stage

0.0(0)
studied byStudied by 0 people
0.0(0)
full-widthCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/10

encourage image

There's no tags or description

Looks like no tags are added yet.

Study Analytics
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai

No study sessions yet.

11 Terms

1
New cards

Goal Step 1: General Goals

The system must have benefits > costs, produce useful reports, and be easy/flexible to use

2
New cards

Top Management Goals

Executives need to know the short-range and long-range performance of the company

3
New cards

Operating Management Goals

Department managers need daily, weekly, and monthly performance data

4
New cards

Step 2: System Survey

A detailed investigation of the current system to find specific problems

5
New cards

Data Gathering Methods

Reviewing documents, interviewing employees (morale/downtime), questionnaires, and checking internal controls

6
New cards

Step 3: Data Analysis

Takes months to suggest solutions in a final report that may include flowcharts or statistics

7
New cards

Step 4: Feasibility evaluation

If the steering committee allows the process to proceed, the study team performs a detailed investigation of different potential solutions. The study team will evaluate

8
New cards

Technical Feasibility

Evaluation of hardware, software, and personnel skills to see if the system is technically possible

9
New cards

Operational Feasibility

Evaluation of whether the system fits well in or hinders current business processes

10
New cards

Schedule/Legal Feasibility

Checks if the system can meet the target implementation date and all legal requirements (e.g., data protection)

11
New cards

Economic Feasibility

Determining if there is a net benefit where benefits outweigh the costs