UK WEATHER HAZARDS

0.0(0)
Studied by 2 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/14

flashcard set

Earn XP

Description and Tags

Last updated 10:35 PM on 11/15/22
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai

No analytics yet

Send a link to your students to track their progress

15 Terms

1
New cards
What are the weather hazards in the UK
Prolonged rainfall
Thunderstorms
Extreme Cold & Heavy Snow
Strong Winds
Droughts & Extreme Heat
2
New cards
What was the causes of Somerset Flood
Rain
High Tides
Dredging
3
New cards
What were the social impacts of Somerset Flood
Over 600 homes flooded
Residents were temporarily evacuated
16 farms had to be evacuated
Power supplies cut off
Lifestyles were severly disrupted
4
New cards
What were the economic impacts of Somerset Flood
Cost of damage illustrated to be over £10M
Over 14,000 hectares of agriculture land was underwater for 3-4 weeks
1000 lifestock evacuated
Roads were cut off, affecting jobs + economy
5
New cards
What were the environmental impacts of Somerset Flood
Stagnant water was left deoxygenated for months, water had to be reoxygenated before being pumped back into rivers
Debris had to be cleared
Flooding destroyed ecosystems and limited food supplies
Sewage, chemicals like pestcides and oil contaminated the floodwater
6
New cards
What evidence is there that weather in the UK is getting worse
More energy in atmosphere, fuels storms
Intense and frequent periods of hot weather
Atmospheric Circulation changes moisture and pressure, changing precipitation patters
7
New cards
How was rain a cause of Somerset Floods
A series of depressions hit South-West UK, weeks of wet weather
8
New cards
How was high tides a cause of Somerset Floods
sea water levels were higher due to high tides and storm surges, prevented freshwater from being dredged, river levels rise further
9
New cards
How was dredging a cause of Somerset Floods
Rivers were full of sediment, not been dredged in over 30 years, less water could be help in river channel, overflowed quickly
10
New cards
What was the aim for Dredging
Dredge 8km of River Tone and River Parratt: increase capacity of river
11
New cards
What has been the progress of Dredging
2014: 130,000 cubic metres of silt removed
Maintanance dredging has been every year since
12
New cards
What was the aim for Drain Enhancements
Develop better drainage so that expensive pumping mechanisms do not need to be relied on
13
New cards
What has been the progress of Drain Enhancements
Culverts have been added to many roads, roads have also been raised
14
New cards
What has been the aim of Somerset Rivers Authority
Establish authority that is responsible for effective river management
15
New cards
What has been the progress of Somerset Rivers Authority
2015: SRA was launched, works to maintain and improve river managment