1/582
Looks like no tags are added yet.
Name | Mastery | Learn | Test | Matching | Spaced | Call with Kai | Chat |
|---|
No analytics yet
Send a link to your students to track their progress
18th–19th century: Industrial Revolution; 1945–1960s: end of World War II and shift toward modernization; 1970s: environmental protection paradigm; 1972: Philippine economic development strategy; 1976: PD 984, National Pollution Control Commission; 1977: PD 1151, Philippine Environmental Policy
Big picture timeline before PD 1586
1977: PD 1152, Philippine Environment Code; 1978: PD 1586, Philippine Environmental Impact Statement System; 1981: PD 2146, proclaiming ECAs and ECPs; 2003: DAO 2003-30, Revised Procedural Manual; 2010: DENR MC 2010-14, standardized requirements with emphasis on thresholds and SDP; 2011: DENR MC 2011-005, incorporation of DRR-CCA in EIA
Key legal milestones after PD 1586
MC 2014-005
Guidelines for Coverage Screening; 2014 update to the PEISS
Operational guide for ECAs; categories for multi-component projects; type of documentary requirement
What MC 2014-005 does
Category A
Environmentally Critical Projects (ECP)
Category B
NEC projects located in ECAs
Category C
Projects that enhance the environment or resolve environmental problems
Category D
Non-coverage projects
Resource extraction; wastes and pollutants
Main environmental pressure pathways of a development project
Development project
Creates environmental pressure through resource extraction and wastes/pollutants and is linked to ecosystem services and human well-being in the Millennium Ecosystem Assessment
Economic, ecological, social, institutional systems
Systems changed by a development project
Changes
Impacts caused by development projects
Projects can trigger responses and management actions
Solution side of development-project impacts
Carrying capacity
Capacity of a system to sustainably support a population through time
Overshoot
Population growth exceeds carrying capacity
Instability
Fluctuation of population based on carrying capacity
Degradation
Increasing demand for resources causes natural resources to decline when pressure is too high
Environmental Impact Assessment (EIA)
Process of evaluating and predicting likely impacts of projects, including cumulative impacts
Construction; commissioning; operation; abandonment
Project stages whose impacts are covered by EIA
Mitigation and enhancement measures
Measures designed as part of EIA
Environmental protection and community welfare
Main goal of EIA
Determine impacts; predict impacts; manage impacts
Uses of different EIA techniques and methodologies
Systematic examination of environmental implications of proposed actions and alternatives
What EIA provides for decision-making
Local and national government policy and regulations
Policies and regulations with which EIA helps ensure compliance
Project concept; pre-feasibility; feasibility; design and engineering; implementation; monitoring and evaluation
Main stages of the project development cycle
EIA
Part of the project development cycle
Site selection; environmental screening; initial assessment; scoping of significant issues
Early EIA inputs
Detailed assessment of significant impacts; identification of mitigation needs; input to cost-benefit analysis; detailed design of mitigation measures; implementation of mitigation measures and environmental strategy; monitoring and post-auditing for future projects
Later EIA inputs
Project sponsor/project proponent; EIA consultants; regulatory agencies including LGUs; community members; socio-civic organizations; private organizations; religious denominations; advocacy groups
Participants in EIA
Public participation in all stages
Main idea of public participation in EIA
Inform
Advertising, media, brochures; first level of the participation ladder
Consult
Public comment, meetings, group presentations; second level of the participation ladder
Involve
Workshops and field visits; third level of the participation ladder
Collaborate
Participatory decision-making; fourth level of the participation ladder
Empower
Delegating decisions to the community level; fifth level of the participation ladder
Environmental risks; carrying capacity
Environmental aspects considered in EIA under sustainable development
Public participation; social issues
Social aspects considered in EIA under sustainable development
Best interest of stakeholders and the community
What projects and investments should serve
Appropriate technologies and processes
Means by which economic efficiency is promoted
Impact
A deviation or change from the baseline situation resulting from a project or investment
Positive; negative; neutral
Possible types of project impacts
With the project; without the project; net impacts
Impact-intensity conditions shown as changing over time
Neglect of the environment during the project cycle; reduced social acceptability; unforeseen costs; weak strategic project planning and design
Reasons for determining environmental impacts
Background information
Information collected to predict and measure environmental impacts
Environmental setting; socioeconomic setting
Main background information collected for impact prediction and measurement
Local and national government agencies; parallel studies; journal articles; maps
Secondary data sources
Flora and fauna; hydrology; geology; land use; climate; soil and water quality conditions
Biophysical information from primary data collection
Demography; customs and traditions; migration; ethnicity; language
Socio-cultural information from primary data collection
Income sources; tenurial instruments; peace and order situation; mode of transportation
Socio-economic information from primary data collection
What changes are important?; What will happen as a result of the project?; How large is the change?; What are the spatial and temporal boundaries of the project?
Main questions in impact analysis and evaluation
Quantity; quality; reliability; accessibility
Water impact indicators
Erosion; crop productivity; salinity; land use; nutrient concentrations
Land impact indicators
Composition and density of natural vegetation; productivity; key species
Flora impact indicators
Populations; habitat; key species
Fauna impact indicators
Customs; traditions; value system; ethnicity; alternative livelihood opportunities; income; quality of life; nutrition
Social impact indicators
Particulate matter; noise
Air impact indicators
Physical and chemical environment; biological environment; human social environment; human economic environment
Four facets of the environment
Project pressure/environmental stress
Leads to an environmental reaction
Environmental reaction
Becomes an environmental impact when environmental status changes
Positive; negative; neutral
Environmental-status changes used in impact evaluation
Benefit-cost terms
Terms in which environmental impacts are valued
Environmental monitoring
Part of the environmental-impact evaluation process
How can we remedy the unwanted changes?; How can we enhance the beneficial changes?; How can we ensure environmental quality?
Main questions in managing project impacts
Avoidance
Strongest option for unwanted impacts
Enhancement
Management option for beneficial impacts
Mitigation
Reduces damage from impacts
Compensation
Used when impacts cannot be fully avoided
Direct impact areas; primary impact areas; secondary impact areas; regional impact areas
Impact-area categories
Environmental Impact Statement (EIS)
Document for single, new projects; contains primary environmental baseline data; maximum 250 pages; Annex 2-12, pp. 153–154
Programmatic Environmental Impact Statement (PEIS)
Document for single co-located projects; contains primary environmental baseline data and carrying capacity; maximum 350 pages; Annex 2-11, pp. 149–152
Initial Environmental Examination Checklist Report (IEE)
Uses secondary environmental baseline data and includes project description, location, impacts, and management strategies; maximum 75 pages; Annex 2-15, pp. 159–160
Environmental Performance Report and Management Plan (EPRMP)
Covers actual environmental impacts, focuses on effectiveness of current measures, applies to single projects already operating, maximum 150 pages; Annex 2-14, pp. 157–158
Programmatic Environmental Performance Report and Management Plan (PEPRMP)
Covers actual environmental impacts of co-located projects and includes proposals for expansions, modifications, and performance improvement plans; maximum 200 pages; Annex 2-13, pp. 155–156
Project Description Report (PDR)
Describes the nature, location, configuration, and use of raw materials and resources of a project; maximum 30 pages; Annex 2-16, p. 161
PEIS
350 pages maximum
EIS
250 pages maximum
PEPRMP
200 pages maximum
EPRMP
150 pages maximum
IEER
75 pages maximum
PDR
30 pages maximum
Proponent
May be private or government
Category A cases
Handled by DENR-EMB Central Office
Categories B, C, D
Handled by DENR-EMB Regional Office
EIA and Management Division; case handler; EIA Technical/Review Committee; review process report; DENR-EMB Chief/Director; decision document
Central Office flow
EIA Division; case handler; EIA Technical/Review Committee; review process report; DENR-EMB Executive Director; decision document
Regional Office flow
LGUs and regulatory agencies
Handle applications for other permits and clearances
Screening; scoping; EIA study and report preparation; technical review 1st; public hearing; technical review 2nd; decision-making; ECC issuance; project implementation and monitoring
Main procedural sequence of EIA
IEC; Public Scoping; Technical Scoping
Three parts of scoping in the EIA procedural sequence
Team Leader; Geologist; Biodiversity Specialist; Hydrologist/Freshwater/Marine Specialist; Air Quality Specialist; Social Scientist/Sociologist; Economist
EIA team composition
Environmental Scientist; Environmental Planner
Specializations under the Team Leader
Geophysical specialist
Specialization under the Geologist
Flora; Fauna
Areas covered by the Biodiversity Specialist
EIA Part 2: The EIA Process
Part covering the procedural steps of EIA
Preliminary activities and Terms of Reference (TOR)
Step 1 of the EIA process
Different EIA specialists
Needed because assessment covers different environmental and socioeconomic dimensions
Project screening
Step 2 of the EIA process
Thorough and full understanding of the proposed project or investment
Main purpose of project screening
What is the project all about?; Why is the project being proposed?; What are the development objectives of the project?; Is the proposed project classified as an ECP?; Is the project site under an ECA?
Questions asked during project screening
“We cannot manage what we do not know and understand.”
Basic principle of project screening
Project Description; Initial Environmental Examination; Environmental Impact Statement; other applicable documents
Possible outputs determined by project screening