EIA Midterm

0.0(0)
Studied by 0 people
call kaiCall Kai
Locked
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/582

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 5:15 AM on 9/18/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

583 Terms

1
New cards

18th–19th century: Industrial Revolution; 1945–1960s: end of World War II and shift toward modernization; 1970s: environmental protection paradigm; 1972: Philippine economic development strategy; 1976: PD 984, National Pollution Control Commission; 1977: PD 1151, Philippine Environmental Policy

Big picture timeline before PD 1586

2
New cards

1977: PD 1152, Philippine Environment Code; 1978: PD 1586, Philippine Environmental Impact Statement System; 1981: PD 2146, proclaiming ECAs and ECPs; 2003: DAO 2003-30, Revised Procedural Manual; 2010: DENR MC 2010-14, standardized requirements with emphasis on thresholds and SDP; 2011: DENR MC 2011-005, incorporation of DRR-CCA in EIA

Key legal milestones after PD 1586

3
New cards

MC 2014-005

Guidelines for Coverage Screening; 2014 update to the PEISS

4
New cards

Operational guide for ECAs; categories for multi-component projects; type of documentary requirement

What MC 2014-005 does

5
New cards

Category A

Environmentally Critical Projects (ECP)

6
New cards

Category B

NEC projects located in ECAs

7
New cards

Category C

Projects that enhance the environment or resolve environmental problems

8
New cards

Category D

Non-coverage projects

9
New cards

Resource extraction; wastes and pollutants

Main environmental pressure pathways of a development project

10
New cards

Development project

Creates environmental pressure through resource extraction and wastes/pollutants and is linked to ecosystem services and human well-being in the Millennium Ecosystem Assessment

11
New cards

Economic, ecological, social, institutional systems

Systems changed by a development project

12
New cards

Changes

Impacts caused by development projects

13
New cards

Projects can trigger responses and management actions

Solution side of development-project impacts

14
New cards

Carrying capacity

Capacity of a system to sustainably support a population through time

15
New cards

Overshoot

Population growth exceeds carrying capacity

16
New cards

Instability

Fluctuation of population based on carrying capacity

17
New cards

Degradation

Increasing demand for resources causes natural resources to decline when pressure is too high

18
New cards

Environmental Impact Assessment (EIA)

Process of evaluating and predicting likely impacts of projects, including cumulative impacts

19
New cards

Construction; commissioning; operation; abandonment

Project stages whose impacts are covered by EIA

20
New cards

Mitigation and enhancement measures

Measures designed as part of EIA

21
New cards

Environmental protection and community welfare

Main goal of EIA

22
New cards

Determine impacts; predict impacts; manage impacts

Uses of different EIA techniques and methodologies

23
New cards

Systematic examination of environmental implications of proposed actions and alternatives

What EIA provides for decision-making

24
New cards

Local and national government policy and regulations

Policies and regulations with which EIA helps ensure compliance

25
New cards

Project concept; pre-feasibility; feasibility; design and engineering; implementation; monitoring and evaluation

Main stages of the project development cycle

26
New cards

EIA

Part of the project development cycle

27
New cards

Site selection; environmental screening; initial assessment; scoping of significant issues

Early EIA inputs

28
New cards

Detailed assessment of significant impacts; identification of mitigation needs; input to cost-benefit analysis; detailed design of mitigation measures; implementation of mitigation measures and environmental strategy; monitoring and post-auditing for future projects

Later EIA inputs

29
New cards

Project sponsor/project proponent; EIA consultants; regulatory agencies including LGUs; community members; socio-civic organizations; private organizations; religious denominations; advocacy groups

Participants in EIA

30
New cards

Public participation in all stages

Main idea of public participation in EIA

31
New cards

Inform

Advertising, media, brochures; first level of the participation ladder

32
New cards

Consult

Public comment, meetings, group presentations; second level of the participation ladder

33
New cards

Involve

Workshops and field visits; third level of the participation ladder

34
New cards

Collaborate

Participatory decision-making; fourth level of the participation ladder

35
New cards

Empower

Delegating decisions to the community level; fifth level of the participation ladder

36
New cards

Environmental risks; carrying capacity

Environmental aspects considered in EIA under sustainable development

37
New cards

Public participation; social issues

Social aspects considered in EIA under sustainable development

38
New cards

Best interest of stakeholders and the community

What projects and investments should serve

39
New cards

Appropriate technologies and processes

Means by which economic efficiency is promoted

40
New cards

Impact

A deviation or change from the baseline situation resulting from a project or investment

41
New cards

Positive; negative; neutral

Possible types of project impacts

42
New cards

With the project; without the project; net impacts

Impact-intensity conditions shown as changing over time

43
New cards

Neglect of the environment during the project cycle; reduced social acceptability; unforeseen costs; weak strategic project planning and design

Reasons for determining environmental impacts

44
New cards

Background information

Information collected to predict and measure environmental impacts

45
New cards

Environmental setting; socioeconomic setting

Main background information collected for impact prediction and measurement

46
New cards

Local and national government agencies; parallel studies; journal articles; maps

Secondary data sources

47
New cards

Flora and fauna; hydrology; geology; land use; climate; soil and water quality conditions

Biophysical information from primary data collection

48
New cards

Demography; customs and traditions; migration; ethnicity; language

Socio-cultural information from primary data collection

49
New cards

Income sources; tenurial instruments; peace and order situation; mode of transportation

Socio-economic information from primary data collection

50
New cards

What changes are important?; What will happen as a result of the project?; How large is the change?; What are the spatial and temporal boundaries of the project?

Main questions in impact analysis and evaluation

51
New cards

Quantity; quality; reliability; accessibility

Water impact indicators

52
New cards

Erosion; crop productivity; salinity; land use; nutrient concentrations

Land impact indicators

53
New cards

Composition and density of natural vegetation; productivity; key species

Flora impact indicators

54
New cards

Populations; habitat; key species

Fauna impact indicators

55
New cards

Customs; traditions; value system; ethnicity; alternative livelihood opportunities; income; quality of life; nutrition

Social impact indicators

56
New cards

Particulate matter; noise

Air impact indicators

57
New cards

Physical and chemical environment; biological environment; human social environment; human economic environment

Four facets of the environment

58
New cards

Project pressure/environmental stress

Leads to an environmental reaction

59
New cards

Environmental reaction

Becomes an environmental impact when environmental status changes

60
New cards

Positive; negative; neutral

Environmental-status changes used in impact evaluation

61
New cards

Benefit-cost terms

Terms in which environmental impacts are valued

62
New cards

Environmental monitoring

Part of the environmental-impact evaluation process

63
New cards

How can we remedy the unwanted changes?; How can we enhance the beneficial changes?; How can we ensure environmental quality?

Main questions in managing project impacts

64
New cards

Avoidance

Strongest option for unwanted impacts

65
New cards

Enhancement

Management option for beneficial impacts

66
New cards

Mitigation

Reduces damage from impacts

67
New cards

Compensation

Used when impacts cannot be fully avoided

68
New cards

Direct impact areas; primary impact areas; secondary impact areas; regional impact areas

Impact-area categories

69
New cards

Environmental Impact Statement (EIS)

Document for single, new projects; contains primary environmental baseline data; maximum 250 pages; Annex 2-12, pp. 153–154

70
New cards

Programmatic Environmental Impact Statement (PEIS)

Document for single co-located projects; contains primary environmental baseline data and carrying capacity; maximum 350 pages; Annex 2-11, pp. 149–152

71
New cards

Initial Environmental Examination Checklist Report (IEE)

Uses secondary environmental baseline data and includes project description, location, impacts, and management strategies; maximum 75 pages; Annex 2-15, pp. 159–160

72
New cards

Environmental Performance Report and Management Plan (EPRMP)

Covers actual environmental impacts, focuses on effectiveness of current measures, applies to single projects already operating, maximum 150 pages; Annex 2-14, pp. 157–158

73
New cards

Programmatic Environmental Performance Report and Management Plan (PEPRMP)

Covers actual environmental impacts of co-located projects and includes proposals for expansions, modifications, and performance improvement plans; maximum 200 pages; Annex 2-13, pp. 155–156

74
New cards

Project Description Report (PDR)

Describes the nature, location, configuration, and use of raw materials and resources of a project; maximum 30 pages; Annex 2-16, p. 161

75
New cards

PEIS

350 pages maximum

76
New cards

EIS

250 pages maximum

77
New cards

PEPRMP

200 pages maximum

78
New cards

EPRMP

150 pages maximum

79
New cards

IEER

75 pages maximum

80
New cards

PDR

30 pages maximum

81
New cards

Proponent

May be private or government

82
New cards

Category A cases

Handled by DENR-EMB Central Office

83
New cards

Categories B, C, D

Handled by DENR-EMB Regional Office

84
New cards

EIA and Management Division; case handler; EIA Technical/Review Committee; review process report; DENR-EMB Chief/Director; decision document

Central Office flow

85
New cards

EIA Division; case handler; EIA Technical/Review Committee; review process report; DENR-EMB Executive Director; decision document

Regional Office flow

86
New cards

LGUs and regulatory agencies

Handle applications for other permits and clearances

87
New cards

Screening; scoping; EIA study and report preparation; technical review 1st; public hearing; technical review 2nd; decision-making; ECC issuance; project implementation and monitoring

Main procedural sequence of EIA

88
New cards

IEC; Public Scoping; Technical Scoping

Three parts of scoping in the EIA procedural sequence

89
New cards

Team Leader; Geologist; Biodiversity Specialist; Hydrologist/Freshwater/Marine Specialist; Air Quality Specialist; Social Scientist/Sociologist; Economist

EIA team composition

90
New cards

Environmental Scientist; Environmental Planner

Specializations under the Team Leader

91
New cards

Geophysical specialist

Specialization under the Geologist

92
New cards

Flora; Fauna

Areas covered by the Biodiversity Specialist

93
New cards

EIA Part 2: The EIA Process

Part covering the procedural steps of EIA

94
New cards

Preliminary activities and Terms of Reference (TOR)

Step 1 of the EIA process

95
New cards

Different EIA specialists

Needed because assessment covers different environmental and socioeconomic dimensions

96
New cards

Project screening

Step 2 of the EIA process

97
New cards

Thorough and full understanding of the proposed project or investment

Main purpose of project screening

98
New cards

What is the project all about?; Why is the project being proposed?; What are the development objectives of the project?; Is the proposed project classified as an ECP?; Is the project site under an ECA?

Questions asked during project screening

99
New cards

“We cannot manage what we do not know and understand.”

Basic principle of project screening

100
New cards

Project Description; Initial Environmental Examination; Environmental Impact Statement; other applicable documents

Possible outputs determined by project screening