Comprehensive vocabulary flashcards covering the EtihadWE Electrical Installation Regulations Second Edition, including definitions of key components, technical calculations, and infrastructure requirements.

Last updated 6:20 PM on 8/1/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

30 Terms

1
New cards

Point of Supply (POS)

The physical and contractual boundary between the EtihadWE distribution system and the consumer's internal electrical distribution, marking the point where EtihadWE responsibility ends.

2
New cards

Total Connected Load (TCL)

The total rated load of all appliances and other electrical equipment or points at a Premise.

3
New cards

Maximum Demand Load (MDL)

The maximum load in kWkW an installation is expected to draw under normal operating conditions.

4
New cards

Nominal Supply Voltage

The electric supply voltage from EtihadWE specified as 240/415V×±10240/415V \times \text{±}10% in accordance with IEC 60038.

5
New cards

Power Factor (PF)

The ratio of real power to apparent power; consumers must maintain a minimum of 0.950.95 lagging at the Point of Supply.

6
New cards

Voltage Drop Limit

The maximum accumulative voltage drop allowed from the POS to any end point, which shall not exceed 44% of the nominal supply voltage.

7
New cards

Main Distribution Board (MDB)

The distribution board that receives the main LV supply from EtihadWE or the Customer’s transformer.

8
New cards

Sub-Main Distribution Board (SMDB)

A distribution board supplied by the MDB to distribute circuits within a designated area.

9
New cards

Final Distribution Board (FDB)

The last control and protection point in the installation that accommodates final circuits supplying lights, sockets, and AC units.

10
New cards

Circuit-breaker

A mechanical switching device that automatically interrupts a circuit under overload or short-circuit conditions.

11
New cards

Residual Current Device (RCD/ELCB)

A protective device that automatically disconnects the supply when the algebraic sum of currents in the live conductors reaches a preset value.

12
New cards

Earth Continuity Conductor (ECC)

A protective conductor used to connect exposed-conductive-parts of equipment to the main earthing terminal.

13
New cards

TT Earthing System

The required earthing system for consumer installations where the earthing system must achieve a resistance of 1 Ω1 \text{ Ω} or less at the MDB.

14
New cards

Main Earthing Terminal (MET)

The main connection point for the installation’s protective conductors and earth electrodes, typically installed inside the MDB.

15
New cards

Advance Metering Infrastructure (AMI)

Advanced electronic meters with remote communications, extended measurements, and remote connect or disconnect capability.

16
New cards

Surge Protection Device (SPD)

A device designed to safeguard electrical systems and equipment against transient overvoltage caused by lightning strikes or switching operations.

17
New cards

Safety Extra-Low Voltage (SELV)

An extra-low voltage system providing protection against electric shock, commonly used for underwater lighting at a maximum of 12V AC12V \text{ AC} or 30V DC30V \text{ DC}.

18
New cards

Ring Circuit

A circuit in which the conductors form a closed loop starting from and returning back to the origin.

19
New cards

Radial Circuit

A circuit supplied from a single origin that feeds points without looping back, used for large appliances like water pumps.

20
New cards

Transformer Room

A dedicated room required for installations with a TCL of 230 kW230 \text{ kW} and above, or an MDL between 200 kW200 \text{ kW} and 5 MW5 \text{ MW}.

21
New cards

Switching Station

An infrastructure requirement for installations with an MDL exceeding 5 MW5 \text{ MW} up to 15 MW15 \text{ MW}, with internal dimensions not less than 20m×10m20\text{m} \times 10\text{m}.

22
New cards

Trunking Filling Factor

Special factor used when installing cables in trunking, specifying that the total effective cable cross-sectional area must not exceed 4040% of the internal area.

23
New cards

Cable Tray Space Factor (Multi-core)

The filling factor limit for multi-core insulated and sheathed cables installed in cable trays, which must not exceed 6060%.

24
New cards

Capacitor Bank

Assemblies used to improve the power factor, required for industrial premises with a TCL of 100 kW100 \text{ kW} and above.

25
New cards

Harmonic Filter

A device used to mitigate harmonic distortion risks and resonance, typically provided in series with capacitors using 77% detuned reactors.

26
New cards

Prospective Short-Circuit Current (PSCC)

The current that would flow under a short-circuit of negligible impedance between live conductors or between a live conductor and earth.

27
New cards

Isolator (Disconnector)

A mechanical switching device that provides clear physical separation in the open position for maintenance or safety.

28
New cards

Equipotential Bonding

Electrical connections intended to maintain exposed and extraneous-conductive-parts at substantially the same potential.

29
New cards

Imax Equation (FDB)

The formula used to calculate the maximum operating current defined as Imax=Load of Highest Phase (W)192Imax = \frac{\text{Load of Highest Phase (W)}}{192}.

30
New cards

Ingress Protection (IP) Rating

The classification for the degree of protection provided by enclosures (e.g., IP54IP54 for indoor distribution boards, IP65IP65 for outdoor).