Kissimmee River Restoration Scheme

0.0(0)
studied byStudied by 0 people
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
Card Sorting

1/13

encourage image

There's no tags or description

Looks like no tags are added yet.

Study Analytics
Name
Mastery
Learn
Test
Matching
Spaced

No study sessions yet.

14 Terms

1
New cards

Location

Kissimmee River, central Florida

2
New cards

History

Once meandered 165km, floodplain 5km wide

3
New cards

to manage floodwaters and protect adjacent land.

90km 10m deep drainage canal 1962 - 1971

4
New cards

Wetlands

Loss of 2,000 to 14,000 hectares/habitats 92% less wading birds

5
New cards

Flow rates

0.42 m/s to 0.05 m/s

6
New cards

Shortened floodwater retention time

11 days to 1 day.

7
New cards

Restoration started

1999 - 2015

8
New cards

restored

100km2

9
New cards

Wildlife

320 fish and wildlife species, 11,000 hectares of wetlands

10
New cards

Dechannelisation

backfilling half of the flood control channel
re-establishing natural river flow
Flood-control channel residential areas stays

11
New cards

Cost

$400 million (initial channelization cost $20 million).

12
New cards

Benefits

Ecosystem
Doubled dissolved oxygen levels vital for aquatic species

13
New cards
14
New cards