PFD
1
Review transfer plan
PFD
2
Pre transfer conference with dock pic
PFD
3
Line up vapor system per transfer plan
Open vent
Open tank vapor valve once below 0psi
Shut vent stack when shutdown
PV VALVE
Don’t open during transfer
Test once under a vaccum
PFD
4
Open tank furthest from pump
Open block valve form pump to farthest tank
PFD
6
Open pump suction valve
PFD
7
PRIME THE PUMP OPEN BURP VALVE TILL COMPLETION OF PRIME
PFD
8
Close tank valve furthest from pump
PFD 9
Open cargo tank valve closest to pump
PFD 10
Check valve line up
Discharging 1
Confirm with dock pic he’s ready to receive
Discharge 2
Open header valve
PTO on idle
Discharge 3
Open discharge valve
Discharge 4
Confirm pressure
Discharge 5
Open vent stack
Discharge 6
Check for leaks
Discharge 7
Confirm with dock pic ready for max rate
Don’t exceed 100 psi 1800 rpm
Discharge 9
Check for leaks again
Discharge 10
Unless stated differently in transfer plan
Working from tank closest to pump to farthest discharge 3 feet to drop sticks
Discharge 11
Continute per transfer plan
Discharge 12
Record info
Pressure 2 hours
Rpm 2 hours
Temp 2 hours
Prepare for strip
Read transfer plan to see most effective way to strip
Strip 2
Notify OOW beginning strip process
Strip 3
Inform dock pic
Strip 4
Strip 1 tank at a time don’t let cargo get below pipeline in final tank till you strip it
Strip 5
Pinch down on valves as needed to slow cargo
Strip 6
Open next tank to continute discharging liquid and not starve the pump
Strip 7
Finish till all tanks are done with cargo
Strip 8
Close tank valves
Strip 9
Allow for run back and repeat steps
Stripping last tank
Slow pump to 1000 rpm- 1200 rpm to not lose prime
Strip last tank 2
Regulate flow with tank valve
Last tank 3
If necessary slow rate by closing down discharge valve cannot exceed 40 psi
Strip last tank 4
Close valve when can’t strip anymore without getting air in line
Last strip 5
Allow for run back and repeat steps if necessary
Last tank 6
Close tank valve
Last tank 7
Idle pump engine
Last tank 8
Disengage pto
Last tank 9
Close all remaining valves
Last tank 10
Shut down pump engine