dischagre ttaps

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/40

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 7:18 PM on 5/28/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai

No analytics yet

Send a link to your students to track their progress

41 Terms

1
New cards

PFD

1

Review transfer plan

2
New cards

PFD

2

Pre transfer conference with dock pic

3
New cards

PFD

3

Line up vapor system per transfer plan

Open vent

Open tank vapor valve once below 0psi

Shut vent stack when shutdown

4
New cards

PV VALVE

Don’t open during transfer

Test once under a vaccum

5
New cards

PFD

4

Open tank furthest from pump

Open block valve form pump to farthest tank

6
New cards

PFD

6

Open pump suction valve

7
New cards

PFD

7

PRIME THE PUMP OPEN BURP VALVE TILL COMPLETION OF PRIME

8
New cards

PFD

8

Close tank valve furthest from pump

9
New cards

PFD 9

Open cargo tank valve closest to pump

10
New cards

PFD 10

Check valve line up

11
New cards

Discharging 1

Confirm with dock pic he’s ready to receive

12
New cards

Discharge 2

Open header valve

PTO on idle

13
New cards

Discharge 3

Open discharge valve

14
New cards

Discharge 4

Confirm pressure

15
New cards

Discharge 5

Open vent stack

16
New cards

Discharge 6

Check for leaks

17
New cards

Discharge 7

Confirm with dock pic ready for max rate

Don’t exceed 100 psi 1800 rpm

18
New cards

Discharge 9

Check for leaks again

19
New cards

Discharge 10

Unless stated differently in transfer plan

Working from tank closest to pump to farthest discharge 3 feet to drop sticks

20
New cards

Discharge 11

Continute per transfer plan

21
New cards

Discharge 12

Record info

Pressure 2 hours

Rpm 2 hours

Temp 2 hours

22
New cards

Prepare for strip

Read transfer plan to see most effective way to strip

23
New cards

Strip 2

Notify OOW beginning strip process

24
New cards

Strip 3

Inform dock pic

25
New cards

Strip 4

Strip 1 tank at a time don’t let cargo get below pipeline in final tank till you strip it

26
New cards

Strip 5

Pinch down on valves as needed to slow cargo

27
New cards

Strip 6

Open next tank to continute discharging liquid and not starve the pump

28
New cards

Strip 7

Finish till all tanks are done with cargo

29
New cards

Strip 8

Close tank valves

30
New cards

Strip 9

Allow for run back and repeat steps

31
New cards

Stripping last tank

Slow pump to 1000 rpm- 1200 rpm to not lose prime

32
New cards

Strip last tank 2

Regulate flow with tank valve

33
New cards

Last tank 3

If necessary slow rate by closing down discharge valve cannot exceed 40 psi

34
New cards

Strip last tank 4

Close valve when can’t strip anymore without getting air in line

35
New cards

Last strip 5

Allow for run back and repeat steps if necessary

36
New cards

Last tank 6

Close tank valve

37
New cards

Last tank 7

Idle pump engine

38
New cards

Last tank 8

Disengage pto

39
New cards

Last tank 9

Close all remaining valves

40
New cards

Last tank 10

Shut down pump engine

41
New cards