Preparing for loading
Energize and test alarms
Pre transfer conference with dock pic
Initial load rate
Max load rate
Top off rate
Saftey percautions
Who shuts down
Process of blow back
( 40 psi)
First part in setting up barge
Line up your vapor system
Open air - open vent stack
Second step In setting up barge
Open cargo tank valves per transfer plan
Step 3 in setting up barge
Open load/drop valve
Step 4 in setting up barge
Open the block valve if necessary in transfer plan
Step 5 in setting up barge
Double check all line ups
Loading process step 1
Verify cargo and initial load rate
If no cargo verify dock line up
Loading process step 2
Check for leaks
Loading process 3
Establish 1 foot minimum pad in all tanks
Static cargo 16” pad
Loading process step 4
Call dock pic ready for max flow and monitor and make adjustments as needed
Loading to draft step 1
Review transfer plan
LTD 2
12” before max draft check make sure cargo level no exceed top off paddle
LTD 3
Notify OOW about to begin drafting out
Inform dock pic drafting began
How do you draft out a barge
Bow - stern
Top off rates for drafting out
10k bbl barge- 2000 BBL/H
20k bbl barge - 2500 BBL/H
30k bbl barge- 3000 BBL/H
LTD 4
Can reduce cargo rate to help top off process
LTD 5
Bow draft reaches 2” below required draft or 1 foot bellow top off paddl
Open stern tanks to drop out stern
LTD 6
When bow reaches max draft close bow tanks.
Cases cargo flow to increase in other tanks
LTD 7
Finish stern drafting
Leave room for blow back
Making required notification for dock pic 2hr/ 1hr / 30 min/ 15 min / 10 min/ 5 min
CLEARING CARGO LINE MEASUREMENTS
65 feet of a 4 inch line - 1 barrel
28 feet 6 “ - 1 barrel
16 feet 8”- 1 barrel
10 feet 10”- 1 barrel
7 feet 12” - 1 barrel
BLOW BACK 1
Min of 24” below the deck for push back of cargo
Blow back 2
open vent stack
Or valve system for vapor recovery
Cargo line up for BB
Cargo header 100%
Load/ drop valve 20%
BB 4
Inform dock pic ready to receive
Bb 5
Slowly open tank valve do not exceed 1 round