loading

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/25

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 1:11 PM on 5/22/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai

No analytics yet

Send a link to your students to track their progress

26 Terms

1
New cards

Preparing for loading

Energize and test alarms

2
New cards

Pre transfer conference with dock pic

Initial load rate

Max load rate

Top off rate

Saftey percautions

Who shuts down

Process of blow back

( 40 psi)

3
New cards

First part in setting up barge

Line up your vapor system

Open air - open vent stack

4
New cards

Second step In setting up barge

Open cargo tank valves per transfer plan

5
New cards

Step 3 in setting up barge

Open load/drop valve

6
New cards

Step 4 in setting up barge

Open the block valve if necessary in transfer plan

7
New cards

Step 5 in setting up barge

Double check all line ups

8
New cards

Loading process step 1

Verify cargo and initial load rate

If no cargo verify dock line up

9
New cards

Loading process step 2

Check for leaks

10
New cards

Loading process 3

Establish 1 foot minimum pad in all tanks

Static cargo 16” pad

11
New cards

Loading process step 4

Call dock pic ready for max flow and monitor and make adjustments as needed

12
New cards

Loading to draft step 1

Review transfer plan

13
New cards

LTD 2

12” before max draft check make sure cargo level no exceed top off paddle

14
New cards

LTD 3

Notify OOW about to begin drafting out

Inform dock pic drafting began

15
New cards

How do you draft out a barge

Bow - stern

16
New cards

Top off rates for drafting out

10k bbl barge- 2000 BBL/H

20k bbl barge - 2500 BBL/H

30k bbl barge- 3000 BBL/H

17
New cards

LTD 4

Can reduce cargo rate to help top off process

18
New cards

LTD 5

Bow draft reaches 2” below required draft or 1 foot bellow top off paddl

Open stern tanks to drop out stern

19
New cards

LTD 6

When bow reaches max draft close bow tanks.

Cases cargo flow to increase in other tanks

20
New cards

LTD 7

Finish stern drafting

Leave room for blow back

Making required notification for dock pic 2hr/ 1hr / 30 min/ 15 min / 10 min/ 5 min

21
New cards

CLEARING CARGO LINE MEASUREMENTS

65 feet of a 4 inch line - 1 barrel

28 feet 6 “ - 1 barrel

16 feet 8”- 1 barrel

10 feet 10”- 1 barrel

7 feet 12” - 1 barrel

22
New cards

BLOW BACK 1

Min of 24” below the deck for push back of cargo

23
New cards

Blow back 2

open vent stack

Or valve system for vapor recovery

24
New cards

Cargo line up for BB

Cargo header 100%

Load/ drop valve 20%

25
New cards

BB 4

Inform dock pic ready to receive

26
New cards

Bb 5

Slowly open tank valve do not exceed 1 round