CE - PT. 4

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/29

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 4:24 AM on 4/14/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai

No analytics yet

Send a link to your students to track their progress

30 Terms

1
New cards

How many days does contractor have to remediate unacceptable work by owner’s standards and what should the owner do?

  • contractor has 10 business days

  • Owner can hire another contractor to remedy the work

2
New cards

An allowance was provided for large format tiles for a project but ended up costing half the price; how should the contract sum be adjusted?

  • a credit of the left over money should be given to the owner

3
New cards

Building will be enclosed when:

  • openings have been installed

  • Thermal protection has been completed

  • Moisture protection has been completed

4
New cards

What is the last day the contractor can submit their question to the design team during bidding?

  • 7 days prior to the bid date

5
New cards

Reasons why an architect should suggest conducting a performance mock up (PMU) ?

  • to pinpoint any areas of weakness as they pertain to water penetration

  • To ensure the safety and welfare of future occupants by checking for structural integrity

  • To validate the design

6
New cards

Architectural supplemental instructions (AIA G710) :

  • used by architect to send additional instructions or interpretations to the contractor that do not change the contract time or sum

7
New cards

Purpose of cement plaster coating on basement portion of a exterior wall:

  • damp proofing the basement

8
New cards

Contractor assumes responsibility for :

  • all subcontractors and suppliers

9
New cards

Low voltage deals with:

  • communications

  • Security

  • Audio

  • Video systems

    • coaxial cabling would fall under the low voltage consultant’s specifications (division 27)

10
New cards

Design build method streamlines :

  • submittals

    • builder and designer are under one contract which streamlines the submittal process therefore open communication to work out any issues

11
New cards

Facilities that will require an electrical power commissioning plan?

  • bank

  • Hospital

    • critical operations power systems (COPS) pertains to buildings that must maintain their ability to operate during an emergency per National Electrical Code (NEC) article 708

12
New cards

Information the architect should verify to ensure a design element meets quality and safety standards:

  • UL rating

    • UL rating confirms the that material was tested and deemed acceptable for use

13
New cards

Architect noticed precarious and unsafe conditions on site;

  • architect should inform superintendent immediately and the contractor along with the owner in writing

14
New cards

Single purpose entity documents:

  • C195

  • C196

  • C197

15
New cards

Multi party agreement:

  • C191

16
New cards

Transitional forms:

  • B195

  • A195

  • A295

17
New cards

Per SectionFormat, these are not considered submittals:

  • Mock up

  • Field sample

18
New cards

Responsible for signing change order in project using CM- adviser:

  • owner

  • Cm-a

  • Contractor

  • Architect

    • in CM-a , the CM prepares change orders and construction change directives

19
New cards

In project using CM-adviser; what tasks would architect and CM-a be responsible for? (4)

  • reviewing submittals

  • Reject work

  • Require inspections

  • Contract administration

20
New cards

G710 is:

  • architect’s supplemental instructions

21
New cards

In CM- adviser project, who would be the IDM?

  • architect

    • unless otherwise noted in contract - A232 ; 15.2

22
New cards

An allowance is:

  • an amount of money or quantity of materials identified by the bidders for work that is not completely defined in the procurement documents

23
New cards

A bid alternate is:

  • portion of the work defined in the procurement documents for which separate pricing is to be identified in bidders proposals

24
New cards

When would a post occupancy evaluation most likely occur?

  • 6 months after substantial completion

    • should happens some time after building has been occupied

25
New cards

Who is responsible for signing certificate of substantial completion?

  • owner

  • Architect

  • Contractor

    • parties associated with contractors; insurance company

26
New cards

G714:

  • construction change directive

27
New cards

Architect discovers portion of the work for which a certificate of payment had been issued 3 weeks prior , does not conform with contract documents . What is the next course of action for architect?

  • the architect may nullify the certificate for payment previously issued that relates to the portion of the work

    • A201 section 9.5

28
New cards

What information should contractor submit promptly after being awarded a contract?

  • submittal schedule

  • Date of commencement of work

  • Time required for completion of each portion of the work

    • A201 section 3.10

29
New cards

Contracts used for Design build projects:

  • B143 - design builder and architect

  • A141 - owner and design builder

30
New cards

G711 :

  • site visit report