SPP Summative (Part 3)

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/71

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 12:22 PM on 6/20/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai

No analytics yet

Send a link to your students to track their progress

72 Terms

1
New cards

Waterproofing method that is semi-flexible or rigid and not exposed to sunlight

Cementitious Waterproofing.

2
New cards

Flexible asphalt waterproofing layer

Bituminous Membrane.

3
New cards

Synthetic rubber single-layer membrane

EPDM Membrane.

4
New cards

Liquidated damages common rate

1/10 of 1% per day of delay.

5
New cards

Substitution of specified materials approved by

Architect of Record.

6
New cards

Law governing low-cost housing

BP 220.

7
New cards

Best document describing a construction site

TCT.

8
New cards

Land reserved for transportation purposes

Right of Way.

9
New cards

Meaning of RROW

Road Right of Way.

10
New cards

Meaning of OCT

Original Certificate of Title.

11
New cards

SPP document for Allied Services

SPP Document 202.

12
New cards

Architectural Interiors subject in LEA

RA 9266 Section 13(4).

13
New cards

Architectural Interiors scope of practice

RA 9266 Section 4(3)(g).

14
New cards

Structural Design subject in LEA

RA 9266 Section 13(2).

15
New cards

Structural conceptualization excludes

Strength.

16
New cards

Maximum TGFA Basic Residential 2 inside lot without firewall

3 × 60% of TLA.

17
New cards

Maximum TGFA Basic Residential 2 interior lot with firewall

3 × 70% of TLA.

18
New cards

Maximum TGFA Basic Residential 2 corner lot with firewall

5 × 70% of TLA.

19
New cards

Maximum TGFA Basic Residential 2 through lot without firewall

3 × 70% of TLA.

20
New cards

Maximum TGFA Basic Residential 2 corner-through lot without firewall

3 × 70% of TLA.

21
New cards

Concrete mixing after adding cement

Within 90 minutes.

22
New cards

Acceptable concrete slump

50–100 mm.

23
New cards

Maximum free vertical drop of concrete

1000 mm.

24
New cards

Slabs exempted from mechanical vibration

100 mm depth or less.

25
New cards

Location of construction joints in slabs

At the end of spans.

26
New cards

UAP membership after registration

Automatic.

27
New cards

Foreign professionals require permit from

PRC and DOLE.

28
New cards

Requirement before rendering professional services

Written Contract Agreement.

29
New cards

Maximum imprisonment for violating RA 9266

6 years.

30
New cards

Provision incorporated in all instruments of service

Architect's signature and seal.

31
New cards

Invitation to Bid excludes

Deciding party.

32
New cards

Instruction to Bidders excludes

General description of works.

33
New cards

Owner-Contractor Agreement excludes

Waiver and Release of Liens.

34
New cards

Plans reflecting changes during construction

As-built Plans.

35
New cards

Completely signed proposal to perform work

Contract.

36
New cards

Business Development Manager function

Innovate schemes for maximum building occupancy.

37
New cards

Compensation for continuous projects

Professional Fee Plus Expenses.

38
New cards

Technical control over full-time construction inspector

Architect.

39
New cards

First thing prospective owner should do

Hire an architect.

40
New cards

Architect's first action with prospective client

Submit professional brief and fee proposal.

41
New cards

First process in architectural sequence

Sign Service Agreement.

42
New cards

Architect's professional fee approved

During Concept Design.

43
New cards

Probable project cost submitted

During Schematic Design.

44
New cards

Architect's Credo Board Resolution

No. 99.

45
New cards

Latest Architect's Credo effectivity

June 21, 2018.

46
New cards

Group not included in ethical relationships

Government.

47
New cards

Retention period after turnover for defects

15 days.

48
New cards

Type of plan submitted after completion

As-built Plans.

49
New cards

Permit required after completion before occupancy

Occupancy Permit.

50
New cards

Code not referred by NBCP

Civil Code of the Philippines.

51
New cards

Building Official appointment for highly urbanized city

Office of the President.

52
New cards

Years before mentoring ALE apprentices

3 years.

53
New cards

New Methods of Compensation effectivity

2016.

54
New cards

Maximum Community Tax Certificate

₱5,000.

55
New cards

Estimate technique unsuitable for cost estimation

Interest Rate Method.

56
New cards

Best estimate technique during schematic phase

Area Method.

57
New cards

Meaning of Moral Turpitude

Conduct violating accepted moral standards.

58
New cards

Common labor-material ratio

70–30.

59
New cards

Non-ASEAN country

Nepal.

60
New cards

Country not included in APEC Architect practice

Bolivia.

61
New cards

First Filipino ASEAN and APEC Architect

Yolanda Reyes.

62
New cards

Year of first conferment of APEC Architects

2006.

63
New cards

Cease and desist order issued after

Third Notice.

64
New cards

Permit required before basement excavation

Excavation Permit.

65
New cards

Building permit processing period

15 days.

66
New cards

Standard height of electrical outlet

0.30 m.

67
New cards

Requirement for replacement PRC ID

Affidavit of Loss.

68
New cards

Processing time for replacement PRC ID

1 day.

69
New cards

CPD requirement after three years

15 units.

70
New cards

Proper compensation for employees

Salary commensurate to work.

71
New cards

First office to visit for corporation registration

City Hall.

72
New cards

Endorsement required before SEC registration

PRC.