to what percentage must an energy meter be added?
10% of the total annual consumption
Roofs used to shade covered parking for Heat Island Reduction must fulfill which specifications?
Option 1 - 3 year aged SRI of at least 32
Option 2 - vegetated roof
Option 3 - covered by energy generation systems
what 5 resources must projects, have designated space for gathering and storing recyclables?
paper, corrugated cardboard, glass, plastics, metals
what heigh is required for the collection of air samples for an IAQ assessment?
3 - 6 feet above floor to represent the breathing zone
what kind of emissions for Green Power and Carbon Offsets may be mitigated using carbon offsets?
scope 1 or scope 2 emissions
what does cradle to gate mean?
raw material extraction to leaving factory floor
what minimal amount of rainfall has to be controlled for a project that includes open space?
95 percentile
in the context of a comprehensive building life cycle evaluation, how long is the baseline building’s service life?
60 years
how much habitat has to be restored for places that have already been built or graded?
30% of the whole property, including the footprint of the building
How far away can a bicycle network be to a building entryway?
200 yards
how may the WE requirement for outdoor water use reduction be met?
selection of plants and effectiveness of irrigation
not okay to use other water sources
how is the efficiency of natural ventilation as a strategy confirmed in a project?
CIBSE flow diagram
what is a more thorough Phase II Environmental Site Assessment?
an additional study that gathers original soil, groundwater, or construction material samples for quantitative analysis
how long must an advanced energy metering system store data?
3 years
for green vehicles, how many EVSE stations need to be installed?
2% for all parking spots, with the possibility that favorite spots go uncounted
how many potential strategies must be assessed for each energy-related aspect for Integrative Design?
at least 2 for each of the 6 aspects
for product disclosure, how many qualifying items must be obtained for outstanding performance?
at least 40 qualifying products
min # of shower and change rooms needed for commercial project?
1 per first 100 FTE and 1 more for each next 150 FTE
how much outside area is required to be available for Open Space?
30% or more for the whole site area, including the building footprint