1/9
Looks like no tags are added yet.
Name | Mastery | Learn | Test | Matching | Spaced | Call with Kai |
|---|
No analytics yet
Send a link to your students to track their progress
Task 1.1 Collect species from the coral garden
Flume tank
collect two basket stars and two coral species and bring them to the surface
Task 1.2 Coral garden ridge modelling
Flume tank
measure length of coral garden and create 3D model
scale the 3D model based on the length received from judge
use the scaled model to estimate the height and display on model
CAD version - measure height and length
Task 1.3 Fly a transect over the coral garden
flume tank
maintain position over coral garden for 30 secs
Task 2.1 Mitigate invasive species
flume tank
count number of european green crabs (crab in image)
ai crab detection
or manual counting
report answer on form

Task 2.2 Iceberg tracking
flume tank
survey iceberg at 5 locations and measure keel (“part under the water”) depth
use form from judge to determine threat level of four platforms
threat level: passing > 10 away: green, passing >5 <10: yellow, and <5: red
if keep depth is >110% than depth of water where platform is: green
1 minute of latitude is 1 nautical mile
for subsea assets: within 25 of platform:
green if depth is > 110% than the depth of water at platform, 90%-110% red, 70%-90% yellow, <70% green
Task 2.3 testing whale safe fishing gear
basin tank
turn handle from lobster pot to release buoy
return lobster pot to surface
Task 2.4 Recover the buoy anchor
basin tank
attach recovery line to buoy anchor (U-bolt on it)
line spools out as ROV surfaces
return other end of line to props person
Service the Holyrood subsea observatory
basin tank
recover edna sensor
recover the old sensor
judge will provide data
find percentage frequency of the 10 speices
return a new edna sensor (going to be on the side of the pool) to same spot as old one
connect new sensor to Holyrood subsea observatory
remove biofueling from camera: spin it 3 times and then spin to have correct color appearing (judge will tell us the color)
Task 3.1 Micropile installation
basin tank
place bubble curtain device that is orginally on the surface around designated location
micropile will be lowered from surface by props person guided by pilot
pull pin to release micropile
pick pin up
Task 3.2 Powering an oil platform from a wind turbine
connect oil platform to power from offshore wind farm
get power connector from wind farm platform
lay power connecter cable through a way point attached to micropile
remove the cover from the oil platform port - cover is debris
install power connector into connection port (velco)