Lean manufacturing
Concept of reducing waste in manufacturing - can be time, materials or idle machines e.g. Toyota car production
Buffer zones
An area adjacent to a point on production line for temporary storage of partially finished products
Timings can be calculated using spreadsheet with material costs and production costs
Feasibility modelling in design
Computer modelling to test the ergonomics or efficiency of a design e.g. kitchen → working triangle
Prototypes
Functioning or non functioning pre-production model that can be used to evaluate with potential customers
→ useful in evaluating food and drink packaging
Feasibility studies
Assess the practicality of a project before materials and manufacturing are invested in