Holderness - Hard Engineering

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/13

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 10:36 AM on 5/10/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai

No analytics yet

Send a link to your students to track their progress

14 Terms

1
New cards

What title does the Holderness coast have

The fastest eroding coast in Europe

2
New cards

How long is the Holderness Coastline

Around 60 Km

3
New cards

How much of the Holderness Coastline is protected by hard engineering

11 Km

4
New cards

What is Bridlington protected by?

4.7Km sea wall

5
New cards

What was used to protect Mappleton

500 meter long revetment

6
New cards

Why was Mappleton protected

Because of a local Village

7
New cards

What was used to protect the Easington Gas Terminal

Revetment

8
New cards

What is the eastern side of Spurn Head protected by

Riprap

9
New cards

The Mappleton scheme has caused increased erosion where?

The cliffs south of Mappleton

10
New cards

What is cowden farm at risk of

Falling into the sea

11
New cards

Why is the Humber Estuary at risk of flooding

Lack of sediment forms less mudflats which increasing the chance of flooding

12
New cards

For the next 50 years, what does the SMP of Holderness suggest at popular areas like Mappleton and easington gas terminal

Holding the Line

13
New cards

What has been proposed to protect the easington gas terminal, and possibly extended to protect the village of easington

4.5 million sea wall, possibly up to 7 million for the village

14
New cards

Smaller scale strategy that’s been proposed to protect the coastline

Concrete filled tyres