BOOK COMBINED SET

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/553

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 12:23 AM on 5/5/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai

No analytics yet

Send a link to your students to track their progress

554 Terms

1
New cards

What is the minimum compressive strength of lean concrete?

A. 2,000 psi C. 1,000 psi

B. 2,500 psi D. 1,500 psi

A

2
New cards

Weep holes shall be spaced at not more than _ center to center in s staggered manner and shall be at least 50 - mm diameter PVC or other pipe materials.

A. 1.0 meter C. 2.0 meters

B. 1.5 meters D. 2.5 meters

C

3
New cards

What is the class of stone for riprap and grouted riprap if the stone weight varies between 30 kg to 70 kg? Note: Also familiarize other classes of stones and weights

B. Class B D. Class D

A. Class A C. Class C

B

4
New cards

How many percent of piles are used for testing? Integrity Testing shall be conducted in at least of the total number of Piles.

A. 25% B. 30%

C. 40% D. 50%

D

5
New cards

What is the minimum tensile strength of carbon fiber sheet in N/mm^2?

B. 3,500 D. 3,800

A. 3,400 C. 3,000

A

6
New cards

What is the minimum dry compressive strength of Stone Mastic Asphalt?

B. 1.5 MPA D. 1.0 MPA

A. 1.4 MPA C. 2.0 MPA

A

7
New cards

It is used to determine the soundness of cement and useful for specific gravity determinations of hydraulic cement, sand, and other fine materials.

 A. Le Chatelier Flask

B. Vicat Apparatus

C. Ultrasonic Pulse Tester

D. Autoclave Machine

A

8
New cards

The minimum reflective brightness values of the reflective sheeting as to angle of divergence is 0.5 and the brightness of the reflective sheeting totally wet by rain shall be not less than _ of the given values on the table.

B. 85% D. 100%

A. 90% C. 75%

A

9
New cards

What is the minimum compressive strength of Shotcrete?

A. 5.2 MPA

B. 13.8 MPA

C. 4.1 MPA

D. 5.0 MPA

A

10
New cards

During Shotcrete curing, at least how many days it shall be cured uninterrupted?

A. 3 Days C. 7 Days

B. 5 Days D. 10 Days

C

11
New cards

This measures tendency of asphalt to form a flammable mixture with air and indicates safe working temperature of asphalts without catching fire.

A. Ductility Test

B. Solubility

C. Spot Test

D. Flash Point

D

12
New cards

The amount of glass beads to be mixed with the paint shall be 500 grams per liter of paint and its index of refraction shall be within the range of _____ when tested by the liquid immersion method at 29 degrees.

B. 3.5 - 4.6

D. 1.5-1.6

A. 2.5 - 2.60

C. 0.5 - 0.60

D

13
New cards

Traffic paint shall be applied to the pavement at the rate of 0.33 Liter per sqm and shall dry sufficiently to be free from cracking in from minutes (drying time).

A. 45-60

B. 10-15

C. 15-30

D. 30-45

C

14
New cards

Which of the following is a test for traffic paints.

A. Wheel and Ramp

B. Ring and Ball

C. Tag Open Cup

D. Rolling Thin-Film Oven

A

15
New cards

Core Sampling will be done at least 3 representative cores which will be considered adequate if the average strength of the cores is equal to or at least__ and if no single core is less than __ of the specified strength.

A. 80% and 75%

B. 85% and 75%

C. 85% and 80%

D. 85% and 70%

B

16
New cards

The strength level of the concrete will be considered satisfactory if the averages of all sets of 3 consecutive strength test results equal or exceed the specified strength, f ’c and no individual result is deficient by more than of the specified strength.

A. 10% B. 15% C. 20% D. 25%

B

17
New cards

What is the class of Concrete used for Rubble Concrete and for Concrete Slope Protection?

A. Class A

B. Class B

C. Class C

D. Class P

B

18
New cards

Cement bags to be stacked in not more than _ high or maximum of 4.5 m to prevent bursting of the begs in bottom layers.

B. 7 Layers D. 12 Layers

A. 5 Layers C. 10 Layers

C

19
New cards

Importance of phosphorus in Rebars, except?

A. Most potent ferrite strengthener after carbon

B. Increases both the yield and tensile strength of steel.

C. Improves characteristics and atmospheric corrosion resistance.

D. None of the above

D

20
New cards

It occurs when a cohesionless saturated or partially saturated soil substantially loses strength and stiffness in response to an applied stress such as shaking during an earthquake or other sudden change in stress condition, in which material that is ordinarily a solid behaves like a liquid.

A. Liquefaction

B. Condensation

C. Liquification

D. NOTA

A

21
New cards

Rapid Curing Cut-back Asphalt = asphalt cement + _____

A. Kerosene C. Crude Oil

B. Gasoline D. NOTA

B

22
New cards

It consists of preparing and treating an aggregate base course.

A. Item 301 Bit. Prime Coat

B. Item 302 Bit. Tack Coat

C. Item 303 Bit. Seal Coat

D. Item 304

A

23
New cards

Which is not an effect of Fly Ash on Concrete?

A. Improve concrete workability.

B. Increase concrete durability.

C. Increase heat hydration

D. Leads to longer curing time.

C

24
New cards

What is Item 714?

A. Geo-Textiles

B. Water

C. Paint

D. Admixture

B

25
New cards

If waterproof membrane method is used during curing, the curing membrane shall remain in place for a period of not less than __

A. 24 Hours

B. 43 Hours

C. 72 Hours

D. 60 Hours

C

26
New cards

in Items 734, Stone Mastic Asphalt, the newly paved section shall be closed to vehicular traffic until such time that the temperature cools down to atmospheric temperature of ___. After attaining the required atmospheric temperature, the paved section shall be opened for vehicular traffic.

A.50 - 60°C

C.70 - 80°C

B.60 - 70°C

D.40 - 50°C

B

27
New cards

It is the consequence of excess water evaporating while the concrete dries or occurs due to change & moisture of concrete.

A. Shrinkage Cracking

B. Thermal Cracking

C. Plastic / Setting Cracking

D. Expansion Cracking

A

28
New cards

What will you do when the aggregate sample material such as base course passed the requirements of quality tests except for Grading?

A. Obtain another set from a different source.

B. Reject the material and the source.

C. Just accept the material, its just Grading only.

D. Process again the aggregate material by blending

D

29
New cards

Fly ash as mineral admixture can be permitted but not exceeding __ partial replacement of Portland cement in concrete mix. (Item 311 PCCP)

A. 20%

B. 30%

C. 40%

D. 50%

A

30
New cards

Emulsified asphalt or cutback asphalt is usually used for:

A. Seal Coat

B. Tack Coat

C. Prime Coat

D. B and C

D

31
New cards

The workability of the asphalt mix is very dependent on the ___

A. Temperature of the asphalt mix

B. Size of the aggregates used.

C. Gradation of Aggregates used

D. Texture of the bitumen.?

A

32
New cards

Which of the following ls the most appropriate penetration grade of asphaltic material for sealing PCCP joints? No more than

A. 90

B. 80

C. 100

D. 75

A

33
New cards

What is the minimum depth of the armored stem thermometer should be inserted to determine the temperature of the delivered asphalt mix?

B. 5 inches

D. 3inches

A. 4 inches

C. 6 inches

C

34
New cards

What is the height of the reflectorized thermoplastic rubble strips?

A. 10mm B. 5mm

C. 13mm D. 15mm

C

35
New cards

What is the tolerance of gabion dimension?

A. +-3% B. +-4%

C. +-5% D. +-6%

C

36
New cards

This is the minimum thickness of coco-net used as bioengineering solution.

A. 10mm

B. 12mm

C. 13mm

D. 15mm

A

37
New cards

What is the acceptable IRI Value in m/km for national primary roads? Not more than

B. 3mm D. 10mm

A. 1mm C. 5mm

B

38
New cards

Non — Shrink grout shall be placed within.

B. 45 Minutes D. 15 minutes

A. 60 Minutes C. 30 Minutes

A

39
New cards

What kind of curve is formed by graphing compaction curve of the MDD and OMC?

B. Hyperbolic D. Algebraic

A. Parabolic C. Linear

A

40
New cards

When the Fineness Modulus is smaller, the ____ is the material

A. Finer

B. Plastic

C. Coarse

D. Clayey

A

41
New cards

What is the diameter shall the soil thread began to break when doing the plastic limit test?

A. 1.5mm

B. 2.5mm

C. 3.2mm

D. 3.5mm

C

42
New cards

What is the maximum percentage of abrasion loss allowed for paving coarse aggregate?

A. 30%

B. 40%

C. 50%

D. 60%

B

43
New cards

How many layers should a 50 - cm thick aggregate base course be placed?

A. 2

B. 3

C. 4

D. 5

B

44
New cards

What is the PI if the PL = 23 and the LL = 35?

A. -12

B. +12

C. +58

D. +15

B

45
New cards

This is the sieve sized used in sieving materials discharged from the abrasion machine.

A. #40

B. #30

C. #12

D. #50

C

46
New cards

Not more than __ of the bars maybe spliced in the same cross - section, except when shown in the plans.

A. 1/4

B. 2/3

C. 1/3

D. 3/4

C

47
New cards

Maximum Size Aggregate for structural concrete is less than spacing of the bars.

A. 25mm

B. 2/3 bar spacing

C. 1/3 bar spacing

D. 3/4 bar spacing

B

48
New cards

In degree Celsius, what is the allowable temperature of the fresh concrete upon discharge?

A. 25 B. 28 C. 30 D. 32

D

49
New cards

This is the result when wrong deposit or conveyance of concrete.

A.Cracks

B. Segregation

C. Honeycomb

D. Fatigue

B

50
New cards

How many bags of cement is needed for class B concrete per cubic meter?

A. 8.0

B. 9.0

C.9.1

D.9.5

A

51
New cards

What is the concrete class used for Item 515 Mechanically Stabilized Earth (MSE) Retaining Walls?

A. Class A

B. Class B

C. Class C

D. Class D

A

52
New cards

What is the height of the Reflectorized Thermoplastic Rubble Strips?

A.3-5 mm

B. 4-13 mm

C.5-13 mm

D. 5-10 mm

B

53
New cards

Compaction rolling shall begin at the sides and proceeds longitudinally parallel toward the road centerline, each trip overlapping the roller width, gradually progressing to the crown of the road. This shalt continue until roller marks are eliminated and a minimum of density required is attained.

A. 95%

B. 97%

C. 100%

D. 90%

B

54
New cards

This specification pertains to blended hydraulic cements for both general and special applications, using slag or pozzolan, or both, with Portland cement or Portland cement clinker or slag with lime

A. ASTM C595

B. ASTM C695

C. ASTM C585

D. ASTM C505

A

55
New cards

What is the rolling speed in asphalt construction whether in the vibratory or static mode?

A. 3-5 km/hr

B. 4-7 km/hr

C. 5-8 km/hr

D. 6-9 km/hr

B

56
New cards

This is the frequency of core sampling on a completed bituminous pavement per lane. Every ___ Linear meter

A. 500 L.M.

B. 1,000 L.M.

C.100 L.M.

D. 250 L.M.

C

57
New cards

What is the importance of adding emulsifying agent in emulsified asphalt?

A. Lessen the bed odor.

B. Improve resistance to defects

C. Make water and asphalt combine.

D. Improve bond between asphalt and aggregates.

C

58
New cards

What kind of test is used to measure the resistance to deformation of bituminous mixture?

A. Marshall Stability Test

B. Ductility Test

C. Extraction Test

D. Spot Test

A

59
New cards

What is the minimum requirement for asphalt pavement thickness acceptance?

A. -5mm

B. +5mm

C. +-5mm

D. -7.5mm

A

60
New cards

What kind of test is used to determine if the asphalt is overheated during manufacture?

A. Marshall Stability Test

B. Ductility Test

C. Extraction Test

D. Spot Test

D

61
New cards

What is the other same for Asphalt cement?

A. Cutback Asphalt

B. Blown Asphalt

C. Hot Asphalt

D. Emulsified Asphalt

C

62
New cards

Cutback Asphalt are commonly used in cold mixes or as prime applications, which of the following is not a test for cutback asphalt?

A. Float Test

B. Kinematic Viscosity

C. Flash Point

D. Water Percent

A

63
New cards

Coconut coir fiber materials for sue in fabrication of coconut geonets shall be 12 to 24 microns in diameter and the ratio of length to diameter shall be____.

A. 15

B. 25

C.35

D. 45

C

64
New cards

The Contractor shall conduct adhesion testing of the fully cared CES installation using direct pall off tests at locations determined by the engineer. Failure at the bond line at tensile stress below ___ will be cause for rejection of the repaid.

A.1.373 MPA

B.1.575 MPA

C.1.675 MPA

D.1.775 MPA

A

65
New cards

Reflective Pavement studs can support a vertical load of ___ during testing.

A. 10 KN

B.5 KN

C.15 KN

D. 20 KN

A

66
New cards

If the curing compound has not been used within __ after the date of manufacture, the Engineer may require additional testing before the use to determine compliance to requirements.

A. 30 Days C. 90 Days

B. 60 Days D. 120 Days

D

67
New cards

What is the widely used chemical admixture used for RMC application that gives water reducing, high range and retarded concrete?

A. Type E

B. Type G

C. Type C

D. Type D

B

68
New cards

Sampling Item 733 - Zinc (HotDip galvanized) Coating on Iron and Steel Products, for articles whose surface area is greater than _, the average of the 3-specimen coating thickness grades comprising each test articles are the average coating thickness for that test article.

A. 100,000 mm^2

B. 200,000 mm^2

C. 300,000 mm^2

D. 500,000 mm^2

A

69
New cards

What is minimum number of rivets and bolts for testing purposes?

B. 3 pieces D. 10 pieces

A. 5 pieces C. 6 pieces

A

70
New cards

About 23,500 — 4” CHB will be used in the project, how many quality tests are you going to perform?

A. 1

B. 2

C. 3

D. 5

C

71
New cards

When timber is intended for marine use, what blend of the following shall not be used?

A. Kerosine

B. Gasoline

C. Creosote Oil

D. All of the Above

C

72
New cards

What is used in subsurface drainage, hydraulic filter, erosion control, sediment control and pavement structures as a WATERPROOFING and Stress relieving membrane?

B. Geofoam D. Coco Fiber

A. Geo-textile C. Coco Net

A

73
New cards

What do you call the selection by standard method of a representative portion of a material for the purpose of ascertaining its characteristics?

A. Experimenting

B. Selecting

C. Sampling

D. Representing

C

74
New cards

Consolidation Test is performed on what type of soil sample?

A. Consolidated

B. Plastic

C. Disturbed

D. Undisturbed

D

75
New cards

What is the maximum compacted thickness per layer for aggregate subbase and base courses?

A. 180mm C. 200mm

B. 100mm D. 250mm

C

76
New cards

For Pipe Culverts, the width of excavation shall be at least greater than the horizontal diameter of the pipe.

A. 200mm C. 400mm

B. 300mm D. 500mm

B

77
New cards

Ia Item 101, clearing shall extend _____ beyond the toe of the fill slopes or beyond the rounding of cut slopes as the case maybe for the entire length of the project.

B. 2.0m D. 4.0m

A. 1.0m C. 3.0m

A

78
New cards

Base and subbase courses shall be compacted with an extension of on each side thus the carriageway will be __ greater than the design width.

A. 0.25 & 0.5m

B. 0.4 & 0.8m

C. 0.5 &1.0m

D. 0.75 & 1.5m

C

79
New cards

A 3.5-meter width single lane pavement has a shoulder with of 2.5 meters on each side. The combined thickness of subbase and base course shall be 425mm. How many layers of Compaction of the subbase and base courses must be carried out if the thickness of the subbase is 225mm?

A. 2 layers over full width of 4.5m

B. 2 layers over full width of 3.5m

C. 3 layers over full width of 4.5m

D. 3 layers over full width of 3.5m

C

80
New cards

What is the compressive strength of the 6” diameter cylinder sample if it fails 90,100 Ib?

B. 3,090 psi D. 3.490 psi

A. 3,190 psi C. 3,290 psi

A

81
New cards

How many sets of field density tests are required per layer of a 1,500square meter of base course?

A. 2

B. 3

C.4

D.5

B

82
New cards

What is the fineness Modulus of fine aggregates if the summation of the percent retained from sieve size 3/8” to Sieve No. 100 is 287% and passing percentage on Sieve No. 200 is only 3%?

A. 2.87

B. 2.90

C. 2.84

D. NOTA

A

83
New cards

What is the weight of 3 meters - 16mm diameter in kilogram?

A. 4.75 kg

B. 5.75 kg

C. 3.00 kg

D. 3.75 kg

A

84
New cards

What is the grade of the rebars if the color code green?

A. Grade 230

B. Grade 275

C. Grade 415

D. All OT Above

C

85
New cards

If there are 250 pieces of reinforced pipe culverts, how many samples shall be taken for testing?

A.4

B. 5

C.6

D.7

B

86
New cards

How many quality tests are required for aggregate base course of 45,250 cubic meters?

A. 30

B. 31

C. 46

D. 23

B

87
New cards

As materials engineer, where can you obtain the permit for the procurement of the chemicals to be red for laboratory testing such as sodium hexametaphosphate?

B. PDEA D. BFAR

A. DOST C. BFAD

B

88
New cards

As Contractor’s ME handling DPWH Projects, are you allowed and authorized to perform testing on DOST Testing Laboratories?

A. YES

B. NO

C. SOMETIMES

D. DEPENDS

A

89
New cards

The following are the type of water stops, except one:

B. Rubber D. Plastic

A. Copper C. PVC

C

90
New cards

What class of concrete to be deposited water?

B. Class B

D. Class P

A. Class A

C. Class Seal

C

91
New cards

Conducting California Bearing Ratio (CBR) is forcing the plunger : into the sample to a depth of__.

A. 2.0mm C. 1.5mm

B. 1.0mm D. 2.5mm

D

92
New cards

What to the height of drop of AASHTO T-180 (Modified Proctor Test)?

A. 12”

B. 14"

C. 16”

D. 18”

D

93
New cards

How many quality tests are required for each type of paint if in » certain project, it requires 325 Gallons of paint, and which 180 gallons are Latex paint, and the rest are enamel paint?

A.2 QT

C.4 QT

B.3 QT

D.1 QT

A

94
New cards

Item 1000: Termite Control Work, there are 2 methods usually adopted in soil poisoning, but which method is used or adopted when there is NO VISIBLE evidence of termite infestation.

A. Drenching

B. Cordoning

C. Waterlogging

D. Dousing

B

95
New cards

When sod show termite infestation, this method shall be applied with working solution at the rate of per square meter.

A. 20L

B. 24L

C.28L

D.30L

B

96
New cards

Flood Control: Item 1704 Embankment. Which of the following is considered SUITABLE material?

A. Peat and Muck

B. Soils with water content exceeding 100%

C. Soil with density of 800 kg/m3 or lower

D. Soils with Liquid limit of 75 and Plasticity Index of 50

D

97
New cards

Item 1013: Corrugated Roofing. All corrugated asphalt roofing materials shall be delivered at the jobsite with labels affixed indicating the quality, make type and thickness. Each roof in position shall withstand up to of wind pressure.

A. 100 km/hr

B. 200 km/hr

C. 300 km/hr

D. 250 km/hr

B

98
New cards

Flood Control: Item 1714: Gabions and Mattresses, the width, height, and length of gabion as manufactured shall not differ by more than from the ordered size prior to filing.

A.+-5%

B. +-10%

C.+-15%

D. +-3%

A

99
New cards

It is high technology equipment containing radioactive source that can read in-place density or moisture content. (Past ME Exam)

A. Nuclear Density Gauge

B. Seismic Density Gauge

C. Dynamic Density Gauge

D. Kinetic Density Gauge

A

100
New cards

It is large metal hopper and pipe used to distribute freshly mixed concrete over an underwater site. (Past ME Exam)

A. Pneumatic Caissons

B. Tremie

C. Concrete Hopper

D. Immersed tube Tunnels

B