1/13
Looks like no tags are added yet.
Name | Mastery | Learn | Test | Matching | Spaced | Call with Kai |
|---|
No analytics yet
Send a link to your students to track their progress
Division 00 :
Procurement and contracting requirements
Contracts, bid forms, Bonds, General conditions
Division 01 :
General requirements
Submittal procedures, quality control, Pricing and payment, Environmental goals, definitions
Division 02 :
Existing conditions
Surveying, site remediation, demolition
Division 03 :
Concrete
Forms, reinforcement
Division 04 :
masonry
brick, CMU, Stone, Glass blocks
Division 05 :
Metals
Structural steel, ornamental metal
Division 07 :
Thermal And moisture protection
damn proofing, waterproofing, insulation, barriers, Roofing
Division 08 :
openings
Doors, windows, skylights, curtain walls, glazing
Division 09 :
finishes
All Finish Material, Plaster, cheap, Light gauge Metal framing, Tile
Division 10 :
Specialties
Loggers, display, fireplaces, bath accessories
Division 11 :
equipment
Vaults and security equipment, Stage equipment, vending machinesl
Division 12 :
Furnishings
Freestanding furniture, window, treatments, fixed Seating
Division 13 :
Special construction
Structures from unconventional materials, towers, geodesic domes
Division 14 :
Conveying equipment
Elevators, escalators, dumb waiters