Important Numbers 4

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/44

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 3:08 PM on 5/21/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai

No analytics yet

Send a link to your students to track their progress

45 Terms

1
New cards
101.6 mm
Minimum extension of bituminous coating below the water line of concrete septic tanks and shall cover all internal area above that point
2
New cards
GA 12 (2.8 mm)
Minimum wall thickness of steel septic tank internally and externally protected from corrosion
3
New cards
25.44 mm
Raking depth to remove loose materials from trenches before placing filter material
4
New cards
19.1 - 63.5 mm (3/4" to 2-1/2")
Sizes of clean stone gravel slag or similar filter material to be placed in trench
5
New cards
1.5 m
Termination of filter material from seepage pit excavation when used with disposal fields
6
New cards
25.4 mm
In distribution box minimum vertical clearance of the invert of inlet above the inverts of outlets
7
New cards
More than 152.4 lineal meters
Length of each line where dosing tank is required
8
New cards
3-4 hours
Intervals of sewage discharge from the dosing tank through automatic siphon or pump
9
New cards
2
Number of siphons or pumps when total pipe length exceeds 304.8 lineal meters
10
New cards
1
Minimum number of drain lines per field
11
New cards
305 m
Maximum length of each line in a disposal field
12
New cards
457.2 mm
Minimum bottom width of trench
13
New cards
914.4 mm
Maximum bottom width of trench
14
New cards
304.8 mm
Minimum depth of earth cover of drain lines
15
New cards
457.2 mm
Recommended depth of earth cover of drain lines
16
New cards
304.8 mm
Minimum thickness of filter material under drain lines
17
New cards
50.8 mm
Minimum thickness of filter material over drain lines
18
New cards
1.2 m
Minimum spacing between leaching beds
19
New cards
1.8 m
Horizontal spacing of distribution drain lines center-to-center
20
New cards
0.9 m
Distance of the perimeter of leaching bed from a distribution line
21
New cards
Less than 2 years
A cesspool without septic tanks may be installed when a public sewer will be available in ___
22
New cards
6.1 m
Minimum sidewall of cesspool below inlet
23
New cards
403.8 mm
Minimum extension of vented leg downward into an existing pit
24
New cards
152.4 mm
Minimum vertical clearance of outlet flow line below inlet when overflow pits are added
25
New cards
2
Minimum number of compartments for interceptors
26
New cards
3 m
Minimum horizontal distance of tree from septic tanks seepage pits or cesspools
27
New cards
4.6 m
Minimum horizontal distance between leaching system and ground surface in sloping ground
28
New cards
304.8 mm
Minimum extension of vented leg fitting below inlet fitting in seepage pit
29
New cards
2.2 m
Minimum diameter of seepage pit
30
New cards
101.6 mm
Minimum thickness of seepage pit concrete wall
31
New cards
304.8 mm
Thickness of concrete block in seepage pits to be chamfered
32
New cards
152.4 mm
Minimum thickness of clean 19.1 mm gravel or rock in excavation voids
33
New cards
17
225 kPa, Minimum compressive strength of brick or block in seepage pit construction
34
New cards
3 m
Minimum sidewall of seepage pit below inlet
35
New cards
50.8 mm
Minimum thickness of cement mortar covering for seepage pit arch or dome
36
New cards
152.4 mm
Minimum extension mortar covering beyond sidewalls of seepage pit
37
New cards
127 mm
Minimum thickness of reinforced concrete slab cover of seepage pit
38
New cards
19.2 kPa
Minimum earth load support capacity of slab cover for seepage pit
39
New cards
228.6 mm
Minimum dimension of inspection hole for seepage pit
40
New cards
457.2 mm to 1.2 m
Depth of top of seepage pit arch or cover below ground surface
41
New cards
203.7 L/m²
Maximum absorption capacity for coarse sand or gravel
42
New cards
162.9 L/m²
Maximum absorption capacity for fine sand
43
New cards
101.9 L/m²
Maximum absorption capacity for sandy loam or sandy clay
44
New cards
44.8 L/m²
Maximum absorption capacity for clay with considerable sand or gravel
45
New cards
33.8 L/m²
Maximum absorption capacity for clay with small amount of sand or gravel