GDP - C7

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/15

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 5:03 PM on 6/16/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai

No analytics yet

Send a link to your students to track their progress

16 Terms

1
New cards

SP

Surface de plancher (surface brute, murs inclus)

2
New cards

SU (= SUP + SUS)

Surface utile

3
New cards

SN

Surface nette (murs exclus)

4
New cards

SUP

Surface utile principale (pièces de destination habitable)

5
New cards

SUS

Surface utile secondaire (caves, greniers, buanderies, garages, abris protection civile)

6
New cards

SD

Surface de dégagement (couloirs, escaliers, hall, ascenseur)

7
New cards

SI

Surface d’installation (locaux techniques, machinerie d’ascenseur, gaines)

8
New cards

SC (= SCP + SCN)

Surface de construction

9
New cards

SCP

Surface de construction porteuse (mur, pilier)

10
New cards

SCN

Surface de construction non-porteuse (cloison, paroi)

11
New cards

Vrai ou faux, les espaces dont la hauteur libre moyenne est inférieure à 1m n’entrent pas dans la SP ?

vrai

12
New cards

Volume brut (= surface brute, donc SP)

volume total, murs et structure inclus

13
New cards

Volume net (= surface nette)

volume réellement utilisé par les occupants, sans gaines techniques

14
New cards

Volume des annexes

espaces secondaires : garages, caves, balcons fermés

15
New cards

Quels sont les 7 coûts principaux souvent remis au MO ?

  1. Terrain (achat, locatif, pollué ?)

  2. Travaux préparatoires (défrichage etc.)

  3. Travaux de construction (ce qui est bâti)

  4. Équipements spécifiques (gros inclus)

  5. Honoraires (de tous les mandataires)

  6. Frais annexes (assurance, autorisation)

  7. Réserves (%du total pour incertitude)

16
New cards