Specialty Contractors
are allied suppliers of furniture, wall cover, carpet, window covering, light fixtures, artworks and accessories
Closed Specification
is a type of specification stipulating the use of specific products and processes without provision for substitution
Quotation
is the price given by a contractor, material supplier, vendor, furniture manufacturer including labor as a form of an offer
Change Order
is the term used for any change, variation, adjustment to an agreed contract, between Owner and Contractor
.10M or 4"
is the minimum height of staircase riser, that is comfortable and relaxed to negotiate, sometimes called in the vernacular as, "Señorita Steps."
Ten (10) Years
is the required number of years of a local Designers' firm to qualify as a local counter part of a Foreign licensed designer
Notice of Change
is a written order to the Contractor issued by the Owner and Designer stipulating revisions, adjustments and replacecments authorizing such variation
Gazebo, Patio and Terrace
These are structures in the construction that do not require a building permit
12M above the roof
the allowable plastic skylights shall not exceed
.75M
is the minimum clear width of the stairs for a Group A dwelling
Bid Bond
refers to any acceptance from bonds accompanying the Bid submitted by the Bidders as a guarantee that the Bidder will enter into a contract
Arrange to replace as specified
is the best action the an Interior Design should take when a manufacturer makes an unacceptable deliver of building materials
10%
is the percentage of an outstanding balance of contract that the Client must pay the Interior Designer upon termination, thru no fault of the I.D.
Design Review
is the condition that an Interior Designer may publish a critique on works of colleagues as design analysis
CCTV (Closed Circuit TV)
is the electronic device intended to provide an unaided surveillance and efficient and sometimes costly
Sanitary Engineer
They're seal and signature is required to have plumbing plans submitted for approval in a given municipality to be given a Building Permit
Accredited member of CIDE
is the number one requisite to be nominated as a member of the PRC Board Interior Design
Capital Investment
the starting instrument for an Interior Design to operate as an art, science, business
Outline Specifications
is a type of specification during schematic and design development phase, containing basic trades and materials with no detailed description
Master's Degree with a license
the requirement int he Academe per RA 10350, for anyone in the Interior Design Baccalaureate degree.
Specifications
the drawings and plans referred to as part of materials necessary to negotiate a project
Designed and prepared by another ID
when is it not appropriate or is illegal for an Interior Designer to affix his real and signature on plans and specifications
Compel and demand the contractor to rectify at his expense
what an Interior Design should advise their client when a constructor shortchanges the client by wrong delivery of materials, interior quality of workmanship and delayed schedule
Scaffolding
is a temporary structure made of timber/ metal/ bamboo with a platform used for construction and other maintenance
Foreman
is the person responsible in resolving issues in the construction site
Occupancy Permit
is the permit given to a building or structure which has fully complied after final inspection and submittal of a certificate of completion.
Sash Maker
is the workman who is skilled to do woodworks and finishing of cabinets, closet, millworks and furniture
Schematics
the design studies to present as recommended solution for any design problems in the best aesthetics
Civic Community Service
is a situation wherein an Interior Design may render unpaid service
Another Interior Designer
no Interior Design shall sign his name, stamp his seal or use any other method of signature on plans and other documents made by _____________
Three (3) Years
the term of service for a member of the board of Interior Design examiner
Client/ Owner
whose interest should an Interior Design uphold, one and above self-interest and financial returns under the code of ethics
Inventory
is to be checked before presenting to clients any material for use in a given project besides cost
Barrier-Free
is another name for Accessibility Design to give ease of mobility to the impaired
Rough and Textured
is the most safe walkway floor finish for children, physically challenged, visually impaired and the elderly to avoid a slippage
Client
is the person whose preference and needs must be considered by a designer in the preparation of a design portfolio
Contract Documents
are the printed documents stipulating the procedure and administrative aspect of the contract between owner and contractor
1.20M
is the minimum width of a given aisle design to be viable and have good flow or movement
Descriptive Specification
is a specification prepared during the schematic and design development phase on trades and materials without a detailed specification
Be a responsible mentor and tell her steps to qualify and improve her condition
how do you best handle a situation wherein a senior designer finds the work of a new graduate below the acceptable level of aesthetic standard
Mezzanine
is a partial intermediate floor in any storey or room of a building, having an area not more than one-half of the area of the room or space in which it is constructed
Deal with established companies
an Interior Designer's basis on recommending quality furnishing to clients
Complete design phase with detailed specification
is what the Interior Designer provides and have sole responsibility for contractors to arrive at an accurate estimate and have a program of construction
Percentage
is a form of compensation wherein the Interior Designer is paid for his services at an agreed percentage based on the project cost
Unethical
the unacceptable practice of advertising in the metropolitan dailies by an Interior Design Firm for marketing purposes is considered
Gallery Curator
is the person who undertakes space analysis, art complement studies, visibility ranges and user-flow analysis of an interior space to completion
2'0"
is the minimum clearance between two twin beds with a night table
Contract Price
is the sum named in the notice of award subject to the addition thereto or deduction there from as contained and stipulated in the contract
2.70M
is the minimum ceiling height requirement of the ground level of a two-storey structure for a residential use
Three (3) Years
is the number of years of validity of an Interior Designer's license
Design Development
is a phase of design service and basis for payment schedule
Interior Design
who should be referred to in case of discrepancies in the drawings, plans, and details of interiors
Guarantee Bond
is a bond furnished by contractor and his surety as a guarantee for the quality of materials and workmanship stipulated in the contract
Project Manager
the person or firm responsible in advising the persons involved in cases where there are discrepancies in the drawings, design details and figures in the plans of an Interior Designer or the Architect
Country of origin has a reciprocity with the Philippines (MRA)
is the necessary requirement for a foreign Interior Designer to be allowed to practice in the Philipppines
Building Official
is the approving official in the government agency implementing approval of the interiors of the buildings for construction in accordance to the National Building Code
Tilt
an inclination in a structure to prevent water retention
Instruction to bidders
the instructions which may be issued prior to awards, to supplement or to modify drawings, specifications or general conditions of the contract
Perspective
is a graphical presentation of the work to be done in a given design project
DPWH
is the government agency enforcing the strict adherence to the National Building Code of the Philippines
Supply
when an interior construction contract states
Floor plans with elevations complete including detailed interior architectural plans signed and sealed
the first design document necessary to continue to the other required steps in the completion of a set plans for permit to start construction
Barrier-Free Design
another name for accessibility design for the benefit of the handicapped
Penalty Clause
is the contract provision setting forth the damages a contractor has to pay the owner of everyday of delay in construction time
Active Subject
one who can compel compliance with the obligation in an agreed contract
.90M
is the maximum standard height of the lavatory installation for adults
Professional Practice and Ethics
one of the subject included in the Interior Design board examination
A separate design fee should always be charged
the best mode of charging, to be ethical in handling design fees by an Interior Designer who is at the same time the manufacturer, supplier and contractor
Acceptance
an agreement of the will of one contracting party with that of another or others, or the object and terms of the contract agreed upon
1.20M
is the maximum width of a ramp without handrails safe and suitable for the physically challenged, visually impaired and the elderly
Project Manager
is the person or company who is professionally trained to manage a project in accorfance to the plans and specifications of and Interior Designer
Give all to the client
the best arrangement with clients when it comes to commissions from suppliers and manufacturers which is a standard practice in the industry
Construction Manager
is to be employed with the task to address the need to effectively control costs and efficiently implement projecct schemes and increasing complexity of construction
Ramp
a structure that is used a replacement for stairs
Contract Price
is the type of contract wherein the cost of materials, labor, execution and professional fee are built into
Bank
is what you call a dwelling that is classified for business
Update all payment dues and CPD unit requirements
is the primary obligation for a delinquent interior designer to get reinstated to the tole of legitimate practitioners
Closed Specifications
a set of specification of detailed materials, quality brand color and dimensions of products without any provision for substition and this type of specs is
Three (3) years
is the validity of an Interior Designer's license
Exit
is the portion of a broadway or public way that should be kept opened ad unobstructed at all times for operation of fire fighting
RA 10350
the newly passed Interior Design Law on the 17th of December 2012 supersedes the law of 1998
Parties must be of legal age, competent, and sane
is the mmost basic necessity and an element of a contract between the contracting partner
Deadline
is the specific period which legal action must be brought forth, for alleged damage or injury in a given construction sit
Excess materials to be sent back to the client
What is the recommended action to be done in the event of a discovery of excess fabrics was found in an unannounced factory visit to a furniture maker.
Circle
is the shape of the signage on Women's washroom specifically designed and undet the law specifically for the impaired
Outcome Based Education (OBE)
is created to promote competitiveness of professionals in the domestic and global markets emphasizing quality assurance in education, skills, trainings and specializations and confidence in the industry.
Ask the contractor to rectify the damages and have it out of his expenses
what measure is best taken when a water seepage is discovered under the wall to wall carpet
Bid Documents
collectively refer to all documents provided or made available to prospective bidders which include the Invitation to Bid and a copy of the Contract which the winning bidders would be required to sign with the Owner.
Errors in plans and Specifications
is one of the basic reason for non-issuance of a building permit to a contractor
Signed contract with 30% downpayment
is when an Interior Designer can start doing an awarded project, following the professional way of practice.
Renovation
is any total change or modification in construction or occupancy based on the requirements of the client/owner
Building Permit
is a written authorization duly notarized granted by the building official to an applicant to proceed with the construction of a specific project after conformity with the National Building Code
Cost plus adjustment fee (CPAF)
is the type of contract a construction project manager signs up with the provisions of a fee that is adjusted by sharing formulas applied to the difference between final allowable cases and the target costs
2.10M
is the standard minimum door height for any building or residence
Good Faith
is the atmosphere of a contract between parties which must be complied with according to the law
Provide sufficient lighting
is the best provision as a precaution from hazards or darkness in a given space especially staircase
1.20M
is the minimum space on both sides of the bed for the elderly to have easy access of the wheelchair