Professional Practice and Ethics Refresher ✅

0.0(0)
Studied by 6 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/96

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 3:08 PM on 5/6/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai

No analytics yet

Send a link to your students to track their progress

97 Terms

1
New cards

Specialty Contractors

are allied suppliers of furniture, wall cover, carpet, window covering, light fixtures, artworks and accessories

2
New cards

Closed Specification

is a type of specification stipulating the use of specific products and processes without provision for substitution

3
New cards

Quotation

is the price given by a contractor, material supplier, vendor, furniture manufacturer including labor as a form of an offer

4
New cards

Change Order

is the term used for any change, variation, adjustment to an agreed contract, between Owner and Contractor

5
New cards

.10M or 4"

is the minimum height of staircase riser, that is comfortable and relaxed to negotiate, sometimes called in the vernacular as, "Señorita Steps."

6
New cards

Ten (10) Years

is the required number of years of a local Designers' firm to qualify as a local counter part of a Foreign licensed designer

7
New cards

Notice of Change

is a written order to the Contractor issued by the Owner and Designer stipulating revisions, adjustments and replacecments authorizing such variation

8
New cards

Gazebo, Patio and Terrace

These are structures in the construction that do not require a building permit

9
New cards

12M above the roof

the allowable plastic skylights shall not exceed

10
New cards

.75M

is the minimum clear width of the stairs for a Group A dwelling

11
New cards

Bid Bond

refers to any acceptance from bonds accompanying the Bid submitted by the Bidders as a guarantee that the Bidder will enter into a contract

12
New cards

Arrange to replace as specified

is the best action the an Interior Design should take when a manufacturer makes an unacceptable deliver of building materials

13
New cards

10%

is the percentage of an outstanding balance of contract that the Client must pay the Interior Designer upon termination, thru no fault of the I.D.

14
New cards

Design Review

is the condition that an Interior Designer may publish a critique on works of colleagues as design analysis

15
New cards

CCTV (Closed Circuit TV)

is the electronic device intended to provide an unaided surveillance and efficient and sometimes costly

16
New cards

Sanitary Engineer

They're seal and signature is required to have plumbing plans submitted for approval in a given municipality to be given a Building Permit

17
New cards

Accredited member of CIDE

is the number one requisite to be nominated as a member of the PRC Board Interior Design

18
New cards

Capital Investment

the starting instrument for an Interior Design to operate as an art, science, business

19
New cards

Outline Specifications

is a type of specification during schematic and design development phase, containing basic trades and materials with no detailed description

20
New cards

Master's Degree with a license

the requirement int he Academe per RA 10350, for anyone in the Interior Design Baccalaureate degree.

21
New cards

Specifications

the drawings and plans referred to as part of materials necessary to negotiate a project

22
New cards

Designed and prepared by another ID

when is it not appropriate or is illegal for an Interior Designer to affix his real and signature on plans and specifications

23
New cards

Compel and demand the contractor to rectify at his expense

what an Interior Design should advise their client when a constructor shortchanges the client by wrong delivery of materials, interior quality of workmanship and delayed schedule

24
New cards

Scaffolding

is a temporary structure made of timber/ metal/ bamboo with a platform used for construction and other maintenance

25
New cards

Foreman

is the person responsible in resolving issues in the construction site

26
New cards

Occupancy Permit

is the permit given to a building or structure which has fully complied after final inspection and submittal of a certificate of completion.

27
New cards

Sash Maker

is the workman who is skilled to do woodworks and finishing of cabinets, closet, millworks and furniture

28
New cards

Schematics

the design studies to present as recommended solution for any design problems in the best aesthetics

29
New cards

Civic Community Service

is a situation wherein an Interior Design may render unpaid service

30
New cards

Another Interior Designer

no Interior Design shall sign his name, stamp his seal or use any other method of signature on plans and other documents made by _____________

31
New cards

Three (3) Years

the term of service for a member of the board of Interior Design examiner

32
New cards

Client/ Owner

whose interest should an Interior Design uphold, one and above self-interest and financial returns under the code of ethics

33
New cards

Inventory

is to be checked before presenting to clients any material for use in a given project besides cost

34
New cards

Barrier-Free

is another name for Accessibility Design to give ease of mobility to the impaired

35
New cards

Rough and Textured

is the most safe walkway floor finish for children, physically challenged, visually impaired and the elderly to avoid a slippage

36
New cards

Client

is the person whose preference and needs must be considered by a designer in the preparation of a design portfolio

37
New cards

Contract Documents

are the printed documents stipulating the procedure and administrative aspect of the contract between owner and contractor

38
New cards

1.20M

is the minimum width of a given aisle design to be viable and have good flow or movement

39
New cards

Descriptive Specification

is a specification prepared during the schematic and design development phase on trades and materials without a detailed specification

40
New cards

Be a responsible mentor and tell her steps to qualify and improve her condition

how do you best handle a situation wherein a senior designer finds the work of a new graduate below the acceptable level of aesthetic standard

41
New cards

Mezzanine

is a partial intermediate floor in any storey or room of a building, having an area not more than one-half of the area of the room or space in which it is constructed

42
New cards

Deal with established companies

an Interior Designer's basis on recommending quality furnishing to clients

43
New cards

Complete design phase with detailed specification

is what the Interior Designer provides and have sole responsibility for contractors to arrive at an accurate estimate and have a program of construction

44
New cards

Percentage

is a form of compensation wherein the Interior Designer is paid for his services at an agreed percentage based on the project cost

45
New cards

Unethical

the unacceptable practice of advertising in the metropolitan dailies by an Interior Design Firm for marketing purposes is considered

46
New cards

Gallery Curator

is the person who undertakes space analysis, art complement studies, visibility ranges and user-flow analysis of an interior space to completion

47
New cards

2'0"

is the minimum clearance between two twin beds with a night table

48
New cards

Contract Price

is the sum named in the notice of award subject to the addition thereto or deduction there from as contained and stipulated in the contract

49
New cards

2.70M

is the minimum ceiling height requirement of the ground level of a two-storey structure for a residential use

50
New cards

Three (3) Years

is the number of years of validity of an Interior Designer's license

51
New cards

Design Development

is a phase of design service and basis for payment schedule

52
New cards

Interior Design

who should be referred to in case of discrepancies in the drawings, plans, and details of interiors

53
New cards

Guarantee Bond

is a bond furnished by contractor and his surety as a guarantee for the quality of materials and workmanship stipulated in the contract

54
New cards

Project Manager

the person or firm responsible in advising the persons involved in cases where there are discrepancies in the drawings, design details and figures in the plans of an Interior Designer or the Architect

55
New cards

Country of origin has a reciprocity with the Philippines (MRA)

is the necessary requirement for a foreign Interior Designer to be allowed to practice in the Philipppines

56
New cards

Building Official

is the approving official in the government agency implementing approval of the interiors of the buildings for construction in accordance to the National Building Code

57
New cards

Tilt

an inclination in a structure to prevent water retention

58
New cards

Instruction to bidders

the instructions which may be issued prior to awards, to supplement or to modify drawings, specifications or general conditions of the contract

59
New cards

Perspective

is a graphical presentation of the work to be done in a given design project

60
New cards

DPWH

is the government agency enforcing the strict adherence to the National Building Code of the Philippines

61
New cards

Supply

when an interior construction contract states

62
New cards

Floor plans with elevations complete including detailed interior architectural plans signed and sealed

the first design document necessary to continue to the other required steps in the completion of a set plans for permit to start construction

63
New cards

Barrier-Free Design

another name for accessibility design for the benefit of the handicapped

64
New cards

Penalty Clause

is the contract provision setting forth the damages a contractor has to pay the owner of everyday of delay in construction time

65
New cards

Active Subject

one who can compel compliance with the obligation in an agreed contract

66
New cards

.90M

is the maximum standard height of the lavatory installation for adults

67
New cards

Professional Practice and Ethics

one of the subject included in the Interior Design board examination

68
New cards

A separate design fee should always be charged

the best mode of charging, to be ethical in handling design fees by an Interior Designer who is at the same time the manufacturer, supplier and contractor

69
New cards

Acceptance

an agreement of the will of one contracting party with that of another or others, or the object and terms of the contract agreed upon

70
New cards

1.20M

is the maximum width of a ramp without handrails safe and suitable for the physically challenged, visually impaired and the elderly

71
New cards

Project Manager

is the person or company who is professionally trained to manage a project in accorfance to the plans and specifications of and Interior Designer

72
New cards

Give all to the client

the best arrangement with clients when it comes to commissions from suppliers and manufacturers which is a standard practice in the industry

73
New cards

Construction Manager

is to be employed with the task to address the need to effectively control costs and efficiently implement projecct schemes and increasing complexity of construction

74
New cards

Ramp

a structure that is used a replacement for stairs

75
New cards

Contract Price

is the type of contract wherein the cost of materials, labor, execution and professional fee are built into

76
New cards

Bank

is what you call a dwelling that is classified for business

77
New cards

Update all payment dues and CPD unit requirements

is the primary obligation for a delinquent interior designer to get reinstated to the tole of legitimate practitioners

78
New cards

Closed Specifications

a set of specification of detailed materials, quality brand color and dimensions of products without any provision for substition and this type of specs is

79
New cards

Three (3) years

is the validity of an Interior Designer's license

80
New cards

Exit

is the portion of a broadway or public way that should be kept opened ad unobstructed at all times for operation of fire fighting

81
New cards

RA 10350

the newly passed Interior Design Law on the 17th of December 2012 supersedes the law of 1998

82
New cards

Parties must be of legal age, competent, and sane

is the mmost basic necessity and an element of a contract between the contracting partner

83
New cards

Deadline

is the specific period which legal action must be brought forth, for alleged damage or injury in a given construction sit

84
New cards

Excess materials to be sent back to the client

What is the recommended action to be done in the event of a discovery of excess fabrics was found in an unannounced factory visit to a furniture maker.

85
New cards

Circle

is the shape of the signage on Women's washroom specifically designed and undet the law specifically for the impaired

86
New cards

Outcome Based Education (OBE)

is created to promote competitiveness of professionals in the domestic and global markets emphasizing quality assurance in education, skills, trainings and specializations and confidence in the industry.

87
New cards

Ask the contractor to rectify the damages and have it out of his expenses

what measure is best taken when a water seepage is discovered under the wall to wall carpet

88
New cards

Bid Documents

collectively refer to all documents provided or made available to prospective bidders which include the Invitation to Bid and a copy of the Contract which the winning bidders would be required to sign with the Owner.

89
New cards

Errors in plans and Specifications

is one of the basic reason for non-issuance of a building permit to a contractor

90
New cards

Signed contract with 30% downpayment

is when an Interior Designer can start doing an awarded project, following the professional way of practice.

91
New cards

Renovation

is any total change or modification in construction or occupancy based on the requirements of the client/owner

92
New cards

Building Permit

is a written authorization duly notarized granted by the building official to an applicant to proceed with the construction of a specific project after conformity with the National Building Code

93
New cards

Cost plus adjustment fee (CPAF)

is the type of contract a construction project manager signs up with the provisions of a fee that is adjusted by sharing formulas applied to the difference between final allowable cases and the target costs

94
New cards

2.10M

is the standard minimum door height for any building or residence

95
New cards

Good Faith

is the atmosphere of a contract between parties which must be complied with according to the law

96
New cards

Provide sufficient lighting

is the best provision as a precaution from hazards or darkness in a given space especially staircase

97
New cards

1.20M

is the minimum space on both sides of the bed for the elderly to have easy access of the wheelchair