NCCCO TELESCOPIC BOOM CRANES -SWING CAB(TLL) & CORE SITE

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/29

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 11:06 PM on 5/18/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai

No analytics yet

Send a link to your students to track their progress

30 Terms

1
New cards

IF OUTRIGGERS AREN'T QUITE FULLY EXTENDED,WHICH LOAD CAPACITY CHART SHOULD YOU REFER TO BEFORE LIFTING OPERATIONS?

ON RUBBER CHART

3 multiple choice options

2
New cards

UNDER WHAT CIRCUMSTANCE(S) IS IT OKAY TO BLOCK UNDER THE OUTRIGGER BEAMS?

IT IS NEVER ACCEPTABLE

3 multiple choice options

3
New cards

ANY TYPE OF IMPROPER BLOCKING OR CRIBBING SUCH AS SPAN BLOCKING MUST REDUCE CRANE CAPACITY BY:

50%

3 multiple choice options

4
New cards

WHICH AREA OF THE CRANE MUST BE BARRICADED?

WORKING RADIUS

3 multiple choice options

5
New cards

PRIOR TO CRANE SET UP ON JOBSITE, WHO SHOULDYOU CHECK WITH FOR ANY UNDER GROUND LINES AND/OR VAULTS?

LOCAL UTILITIES

3 multiple choice options

6
New cards

HOW MUCH WEIGHT SHALL ONE PAD OR MAT UNDER AN OUTRIGGER BE ABLE TO SUPPORT?

TOTAL WEIGHT OF THE CRANE AND LOAD

3 multiple choice options

7
New cards

WHEN WORKING AT GROUND NEAR A CELLAR WALL, WHERE SHOULD THE CRANES OUTRIGGER PADS BE PLACED?

AT LEAST AS FAR BACK AS THE DEOTH OF THE WALL BELOW GROUND

3 multiple choice options

8
New cards

WHAT IS THE REQUIRED SET UP DISTANCE AWAY FROM EDGE OF SOFT OR SANDY EXCAVATED AREAS?

1.5 TIMES DEPTH OF EXCAVATION AWAY FROM EDGE

3 multiple choice options

9
New cards

UPON ARRIVAL ON A NEW JOB SITE WITH A TRUCK CRANE, THE PRIMARY MAJOR CONCERN IS:

UNDER GROUND UTILITIES

3 multiple choice options

10
New cards

DUNNAGE OR OUTRIGGER PADS MUST BE A MINIMUM OF _____________TIMES LARGER THAN THE FLOAT

3

3 multiple choice options

11
New cards

WHEN ARRIVING IN THE CRANE AT THE JOB SITE, THE OPERATOR SHOULD FIRST ACCOUNT FOR THE CONDITION OF THE:

ACCESS ROADS

3 multiple choice options

12
New cards

NEXT TO SOFT OR SANDY EXCAVATION AREAS, SET UP DISTANCE IS AT LEAST_________TIMES DEPTH AWAY FROM EDGE

1.5

3 multiple choice options

13
New cards

OF THE FOLLOWING, WHICH IS THE MINIMUM CLEARANCE DISTANCE WHEN TRAVELING UNDER LIVE POWER LINES THAT ARE 750 TO 1000KV?

20FT (WHILE TRAVELING BOOM LOWERED)

3 multiple choice options

14
New cards

OF THE FOLLOWING, WHICH IS THE MINIMUM CLEARANCE DISTANCE WHEN OPERATING A MOBILE CRANE NEAR LIVE POWER LINES THAT ARE OVER 1000KV?

DETERMINED BY THE UTILITY/OWNER OR REGISTERED PROFESSIONAL ENGINEER

3 multiple choice options

15
New cards

THE SUPPORTING SURFACE/GROUND OF A CRANE MUST BE ABLE TO SUPPORT:

CRANE AND LOAD

3 multiple choice options

16
New cards

CRANE IS SET UP WITH MAXIMUM BOOM ON UNLEVEL GROUND, WHAT SUPPORT CONDITION MUST BE ACCOUNTED FOR?

KEEPING A 90 DEGREE ANGLE BETWEEN CYLINDER ROD AND PAD

3 multiple choice options

17
New cards

OF THE FOLLOWING,WHICH IS THE MINIMUM CLEARANCE DISTANCE WHEN OPERATING A MOBILE CRANE NEAR LIVE POWER LINES THAT ARE OVER 200 TO350KV?

20FT

3 multiple choice options

18
New cards

WHICH OF THE FOLLOWING IS THE MINIMUM CLEARANCE DISTANCE FOR A CRANE TRAVELING UNDER LIVE POWER LINES UP TO .745KV

4FT (WHILE TRAVELING WITH BOOM LOWERED)

3 multiple choice options

19
New cards

WHAT IS THE MAIN OBJECTIVE WHEN PUTTING MATS OR ANY TYPE OF BLOCKING UNDER THE OUTRIGGER FLOATS?

DISTRIBUTE GROUND BEARING PRESSURE OVER A LARGER AREA

3 multiple choice options

20
New cards

THE CRANE ARRIVES ON A NEW JOB SITE, WHAT IS THE PRIMARY MAJOR CONCERN BEFORE SETTING UP?

UNDERGROUND UTILITIES

3 multiple choice options

21
New cards

WHICH OF THE FOLLOWING TOOL IS USED TO FIGURE OUT LIFTING HEIGHT CAPABILITIES FOR A CRANE?

RANGE DIAGRAM

3 multiple choice options

22
New cards

IF AN OPERATOR IS ENTERING A NEW CONSTRUCTION AREA,WHO SHOULD HE/SHE CONFIRM THE GROUND SURFACES ABILITY TO WITHSTAND GROUND BEARING PRESSURE FROM THE CRANE ?

SUPERINTENDENT OR QUALIFIED ENGINEER

3 multiple choice options

23
New cards

MOBILE CRANES NEED TO BE LEVEL WITHIN WHAT PERCENTAGE OF GRADE?

1%

3 multiple choice options

24
New cards

WHICH OF THE FOLLOWING IS THE BEST LOCATION FOR LEVELING A CRANE?

SUPERSTRUCTURE (UPPER)

3 multiple choice options

25
New cards

NEXT TO AVERAGE EXCAVATION AREAS, SET UP DISTANCE IS AT LEAST _________TIMES DEPTH AWAY FROM.

1

3 multiple choice options

26
New cards

BEFORE SET UP NEAR AN OBSTRUCTION,WHAT IS THE MINIMUM ALLOWABLE SWING CLEARANCE DISTANCE THAT MUST BE MAINTAINED?

2FT

3 multiple choice options

27
New cards

IN IDEAL CONDITIONS,OUTRIGGERS ARE FULLY EXTENDED WITH TIRES:

JUST HIGH ENOUGH OFF THE GROUND TO BE FREE OF CRANE WEGHT

3 multiple choice options

28
New cards

CRANE IS GETTING SET JUP NEXT TO A CELLAR WALL AT GROUND LEVEL. HOW FAR BACK DOES THE OPERATOR NEED TO SET THE OUTRIGGER PADS OR TRACKS?

AT LEAST AS FAR BACK AS THE DEPTH OF THE WALL BELOW GROUND

3 multiple choice options

29
New cards

IF CRANE IS CRIBBED UP IMPROPERLY, (SPAN BLOCKING) HOW MUCH MUST THE CRANES CAPACITY BE REDUCED?

50%

3 multiple choice options

30
New cards

HOW MUCH LARGER MUST THE MATS OR CRIBBING BE THAN THE OUTRIGGER FLOAT?

MINIMUM OF 3 TIMES THE PAD AREA

2 multiple choice options