Memorandum Circular No. 2010 - 13, which adopts the Manual on Land Survey Procedures, was issued on __________.
June 23, 2010
Pursuant to DAO No. 2007-29, all Geodetic Control Surveys shall be conducted in the __________ using survey grade GNSS receivers.
Philippine Reference System of 1992 (PRS 92)
Geodetic Control Survey Orders are issued by the __________.
NAMRIA Administrator
The Geodetic Control Survey Party must consist of three basic components: help Project Main Office, Office Operations, and __________.
Field Operations
The nominal spacing for a 1st Order Geodetic Network baseline is __________.
50kilometers
Wait time for changing GNSS batteries during observation is prohibited because it causes the receiver to lose lock on satellites, leading to a __________.
major cycle slip
Standard concrete monuments are fabricated with a mixture ratio of __________ (cement:sand:gravel).
1:2:4
The markings on reference monuments must be in __________ font type and at least 2.5 cm in height.
Arial Bold
The government property mark inscribed on reference monuments is __________.
GOV PROP
The maximum value for __________ in GNSS observations should preferably be less than 5 to indicate a higher probability of accuracy.
PDOP (Position Dilution of Precision)
For Geodetic Control, a minimum of __________ satellites must be observed.
4
Primary control points in a cadastral project are designated as __________.
Bureau of Lands Location Monuments (BLLMs)
BLLM No. 1 and BLLM No. 2 should be established near the center of the municipality or project and usually spaced at least __________ apart.
300meters
The __________ is a formal process documenting the agreement of parcel boundaries by adjoining landowners.
Boundary Agreement Process (BAP)
The __________ replaces the Sketch and Survey Record Card and records the boundary delineation agreement.
Parcel Information Sheet (PIS)
In agricultural areas, the width of the strip of land reserved as a public easement along bodies of water is __________.
20meters
In forestlands, the strip of land reserved as a public easement along bodies of water is __________.
40meters
Standard lot corner monuments must be cylindrical, at least 15 cm in diameter, and __________ in length.
50centimeters
The survey symbol used for a Private Land Survey conducted by a Private Geodetic Engineer is __________.
Psu
The political boundary monument designating a Barangay Boundary is abbreviated as __________.
BBM
A __________ is conducted whenever an approved survey is reported to be erroneous or occupancy encroaches on another property.
Verification Survey (Vs)
The Grid Azimuth for a Cadastral Project is reckoned from the __________ as zero direction.
South
The standard scale used for Philippine Cadastral Maps is __________.
1:4000
The transformation parameter for Translation X from WGS84 to PRS92 is __________.
127.62195meters
The reference triangulation station for PRS92 located in Marinduque is known as __________.
Balanacan