SPP Document for Allied Services
SPP Document 202.
SPP 204-A
Construction Inspection Services.
Business Development Manager role
Maximize building occupancy.
Architect's responsibility to people
Promote welfare, heritage, and environment.
Architect's responsibility to client
Protect client's interest and keep client informed.
Architect's responsibility to contractor
Provide clear and consistent information.
Architect's responsibility to suppliers
Reject favors and commissions.
Paid advertisement of services
Violation of ethical responsibility.
Guaranteeing project cost
Violation of ethical responsibility to client.
Accepting gifts from suppliers
Violation of ethical conduct.
Bribes from contractors
Must be rejected.
Architect's seal and signature
Required in all contract documents.
Written contract agreement
Required before rendering services.
UAP Membership
Automatic after registration.
Provision for UAP Membership
RA 9266 Section 40.
Architectural Interiors in LEA
Section 13(4).
Architectural Interiors in scope of practice
Section 4(3)(g).
Structural Design subject
Section 13(2).
Moral Turpitude
Behavior violating accepted moral standards.
PRBoA Ethics Resolution
Resolution No. 2 Series of 2018.
Code of Ethical Conduct promulgated
2006.
Architect's Credo effectivity
June 21, 2018.
Architect's Credo Board Resolution
No. 99.
Heritage preserved for future generations
Architectural Heritage.
Non-ASEAN country
Nepal.
Country excluded from APEC Architect practice
Bolivia.
First Filipino ASEAN and APEC Architect
Yolanda Reyes.
First conferment of APEC Architects
2006.
Foreign Architect permit agencies
PRC and DOLE.
Replacement PRC ID fee
₱250.
Replacement PRC ID requirement
Affidavit of Loss.
Replacement PRC ID release
1 day.
CPD units after three years
15 units.
Years before mentoring ALE aspirants
3 years.
Maximum Community Tax Certificate
₱5,000.
First office for corporation registration
City Hall.
Office endorsement before SEC registration
PRC.
Building Official appointment for HUC
Office of the President.
Building permit processing period
15 days.
Excavation Permit
Required before basement work.
Occupancy Permit
Required before moving in.
Certificate of Electrical Inspection
For substantially completed electrical works.
As-Built Plans
Submitted after construction completion.
Cease and Desist Order
Issued after Third Notice.
Standard outlet height
0.30 m.
Calendar Day
Includes Sundays and holidays.
Triplicate Contract Documents
Three signed copies.
Performance Bond
Guarantees contract execution.
MSDS
Material Safety Data Sheets.
CIAC
Construction Industry Arbitration Commission.
RA 9285
Alternative Dispute Resolution Act of 2004.
Arbitration committee composition
Two representatives and one neutral member.
Claims below ₱100,000
Small Claims Court.
Arbitration order compliance
15 days.
Project Proponent
Client.
Construction Inspector
Clerk-of-Works.
Shop Drawings
Prepared by Contractor.
BOQ
Prepared by Contractor.
BOM
Prepared by Architect.
Project Construction Cost
Building cost only.
Project Development Cost
Building cost plus fees and permits.
Soft Costs
Professional fees and permits.
Hard Costs
Construction costs.
Area Method
Estimate method for early project stages.
Interest Rate Method
Not used in project estimation.
Labor-Material Ratio
70:30.
Commercial Length
Unit used for rebar estimates.
Division containing concrete pipes
Division 2.
MasterFormat additional divisions
34.
Total MasterFormat divisions
50.
Building Commissioning
Process ensuring building systems work as intended.
Forensic Architecture
Study prolonging building life.
Building Component Services
Materials, finishes, roofing, hardware and fixtures.
Management of Architectural Practice
Office management, accounting and taxation.