1/15
Looks like no tags are added yet.
Name | Mastery | Learn | Test | Matching | Spaced | Call with Kai |
|---|
No analytics yet
Send a link to your students to track their progress
Logistics Plan
Safety, efficiency, controlled site access
Check in area
Workers and visitors are accounted for before entering active zones
Work parking
Separated from main construction area of work
Crane operation area
Allowing safe and effective swing radius. Minimizing risk to workers and pedestrians nearby
Restroom, first aid,
Accessible location on both sides of the site
Muster point
In the event of emergency personnel knows exactly where to go
Mobile offices
Near front of the site for easy access and oversight
Dumpster and washout area
Positioned to manage waste effectively
Existing side walks
Already located here just wanting to shows the separation
Design
Architecture and engineering
Permits and insurance
MEP and site permits, certificate of occupancy, environmental permits
Furniture
Meet with client and discussed the amount allotted for furniture
3rd party services
Inspections, testing, consultants
Contingencies
Discussed with Owner and consultant in previous OAC meeting
High cost drivers
Concrete, MEP , Site Development