Existing Conditions Plan
Shows the site survey data to the scale and orientation established in the plan drawing set
Tree Protection Plan
Looks to preserve trees and other critical site vegetation from construction activities
Demolition Plans
Identify site elements to be demolished, removed and relocated/transplanted as well as those items to remain in place in order to prepare the site for construction activities
Deconstruction
Means to reclaim, reuse or recycle construction debris
Post-consumer Recycled Content
Any material or product that has served its intended use and has been diverted or recovered from waste to be remanufactured into a new product or material
Pre-consumer Recycled Content
Waste or scrap materials generated in manufacturing and converting processes that can be remanufactured into a new product or material
Reprocessed Materials
Broken down or otherwise modified from their original size
Volatile Organic Compounds (VOCs)
Variety of organic compounds that vaporize at room temperature. Typically harmful to human health
Erosion Control
Reduce or eliminate conditions that lead to erosion
Sediment Control
Minimize the off-site transport of sediments in runoff
Mitigation Plans
Intended to reduce risks and impacts to a given resource
Avoidance
Implementing preventative measures to stop adverse impacts from occurring
Minimization
Used to limit the degree, extent, magnitude, or duration of adverse impacts
Compensation
When adverse impacts are unavoidable and are typically considered to be the option of last resort