Blue print reading final

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/46

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 3:05 AM on 5/7/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai

No analytics yet

Send a link to your students to track their progress

47 Terms

1
New cards

According to the electrical notes, at what height do the telephone boxes get mounted on the walls? Use drawing E1 Electrical Power Plan.

54”

2
New cards
<p><span>According to the legend, what type of device is this? </span>Use drawing E1 Electrical Power Plan. </p>

According to the legend, what type of device is this? Use drawing E1 Electrical Power Plan.

computer outlet

3
New cards
<p><span>According to the legend, what type of device is this? </span>Use drawing E1 Electrical Power Plan. </p>

According to the legend, what type of device is this? Use drawing E1 Electrical Power Plan.

three way light switch

4
New cards
<p><span>According to the legend, what type of device is this? </span>Use drawing E1 Electrical Power Plan. </p>

According to the legend, what type of device is this? Use drawing E1 Electrical Power Plan.

Fluorescent light fixture

5
New cards
<p><span>Match the following pictures with their description:</span></p><p>Use drawing E1 Electrical Power Plan.</p>

Match the following pictures with their description:

Use drawing E1 Electrical Power Plan.

  1. duplex wall receptacle, 2. duplex floor receptacle, 3. 4-plex, 4. 230v receptacle

6
New cards

Who supplies the exhaust fans? Use drawing E1 Electrical Power Plan.

HVAC contractor

7
New cards

All exterior receptacles needs to be GFCI protected. Use drawing E1 Electrical Power Plan.

True

8
New cards

All interior receptacles needs to be GFCI protected. Use drawing E1 Electrical Power Plan.

false

9
New cards

You will find the light fixture on the sheet E1.

false

10
New cards

Ductwork takes precedence over electrical conduit location. Use drawing E1 Electrical Power Plan.

True

11
New cards

The lights in Scott’s office is connected to which breaker in the panel? Use drawing E2 Lighting Plan.

A-7

12
New cards

Based on the previous answer about the breaker for the lights in Scott’s office, what size is the breaker (Amp)? Use drawing E2 Lighting Plan.

20 A

13
New cards

What fixture/equipment is connected to the 60 Amp breaker? E1 Electrical Power Plan.

Heat pump 2

14
New cards

The receptacles in Scott’s office is connected to which breaker in the panel?  Use drawing E1 Electrical Power Plan

A-20

15
New cards

What is the size on Amp of the main electrical panel?

Please write the answer as a number only. NO UNITS. For example of it is 120Amp, write 120  because that is is the format I give the answer in so if you do it differently, it will be marked incorrect. Use drawing E1 Electrical Power Plan

400

16
New cards

Who is the manufacturer of the fluorescent 2'x4' that sits in the Acoustical tile ceiling? Use drawing E2 Lighting Plan.

H.E. Williams

17
New cards

There is a 3-way light switch in Scott's office. Use drawing E2 Lighting Plan.

False

18
New cards

How many duplex receptacles are there in Scott's office? E1 Electrical Power Plan.

4

19
New cards

At what height does the hose bibs (h.b. which is an exterior faucet) need to be installed? Use drawing P1 Plumping Plan.

18”

20
New cards

In Restroom #102 (RR 102) the handle for the ADA (handicap) water closet (toilet) should be installed on which side of the toilet? Use drawing P1 Plumping Plan.

other side

21
New cards

How often are clean outs required to be installed on the sewer line leaving the building going to sewer main (every X' o.c. maximum). Use drawing P1 Plumping Plan.

100’

22
New cards

What is the piping size for the hot water line going to plumbing fixture 1 in Restroom #109 (RR 109)? Use drawing P1 Plumping Plan.

0.5”

23
New cards

What is the vent pipe size for plumbing fixture 3 in Restroom #109 (RR 109)? Use drawing P1 Plumping Plan.

2”

24
New cards

In what direction does the building sewer line leave the building? Use drawing P1 Plumping Plan.

S

25
New cards

Over what room will you find the water heater? Use drawing P1 Plumping Plan.

Vault

26
New cards

What size is the building sanitary sewer line? Use drawing P1 Plumping Plan.

4”

27
New cards

What size is the main building water supply line? Use drawing P1 Plumping Plan.

1”

28
New cards

In RR 105, fixture 6, what size is the waste pipe? Use drawing P1 Plumping Plan.

2”

29
New cards

How many Btu’s of electric heat does HP Unit # 1 produce? Use drawing M1 HVAC Plan.

34,130

30
New cards

What voltage supply each of the Heat pumps. Use drawing M1 HVAC Plan.

240 V

31
New cards

How thick should the heat pump concrete pads be?

Write the answer with just a number, no decimals, and no units. For example 6. Use drawing M1 HVAC Plan.

4

32
New cards

How high on the walls should the thermostats be placed? Use drawing M1 HVAC Plan.

54”

33
New cards

Are the rectangular ducts lined with liners?   Use drawing M1 HVAC Plan.

yes

34
New cards

What size is the return air grille in the Gifted class room? Use drawing M1 HVAC Plan.

46”x22"

35
New cards

AND according to what you have learned in class (not shown on drawings), how many CFM does that return air grill in the Gifted class room pull through? Use drawing M1 HVAC Plan.

1530 CFM

36
New cards

How many take offs are there (where round branch duct comes off from main trunk duct)  for HP Unit #1? Use drawing M1 HVAC Plan.

5

37
New cards

How many CFM supply air is planned for the Rest Room (Rm 109)?  Use drawing M1 HVAC Plan.

50 CFM

38
New cards

For the Rest Room (Rm 109), which Heat Pump (HP) provides the air?  Use drawing M1 HVAC Plan.

HP 2

39
New cards

Where on the building (N,S,W,E wall)  do the exhaust fans terminate (outlet)  from rooms 102, 105 and 109? Use drawing M1 HVAC Plan.

S

40
New cards

Which exhaust fan serves room 109? Use drawing M1 HVAC Plan.

exhaust fan # 2

41
New cards

The exhaust fan serves room 109, what is the CFM capacity? Use drawing M1 HVAC Plan.

80 CFM

42
New cards

In the design data for this project, what is the soil bearing capacity?

2000 psf

43
New cards

In the design data for this project, what strength concrete is required for exterior exposed concrete?

4000 psi@28 days

44
New cards

In the design data for this project, what is the strength for the #3 or larger rebars?

60,000 psi

45
New cards

In the general notes for this project, how thick is the concrete protective covering of the rebars on the surfaces of the slabs?

3/4”

46
New cards

In the general notes for this project, for slabs-on-grade, provide saw-cut control joints at  intervals of _____oc max across the width
of the slab.?

18’

47