Who starts the building process of steel framing?
Architect (rough sketch)
Who does the structural drawings of steel framing?
Structural Engineer
What are the structural drawings used to prepare?
shop drawings (fabricator)
What do the steel framing plan depict?
shape, size, and location of structural steel (also dimensions)
What do shop drawings depict?
show the configuration and connection details of each member
What happens in the Fabrication Stage?
Ordering of materials; workers cut, drill, punch, weld, add angles, plates to steel as indicated on shop drawings
What assembles structural steel members on site in accordance to shop drawings?
The Erector
What are workers called in the Erector Stage?
Ironworkers
Steps of Structural Steel
Anchor Bolts & Setting Plates
Column Installation
Horizontal Framing (Beams & Girders)
Plumbing and Squaring
Secondary Horizontal Framing (Bar Joists)
Decking Installation
Detail System
3 Methods of Joining Steel Members
Rivets, Bolts, Welds
What is Riveting?
White hot fastner is inserted through holes in members to be fastened

What is this?
Riveting
Riveting is commonly used in modern construction
False
What is Bolting?
Carbon steel bolts

What is this?
Bolting
Bolting has limited uses such as fastening light framing elements or holding temporary connections
True
a bearing type connection
What do bearing type connections do?
Bolts need only be installed to “snug tight” condition.
What do slip critical type connections do?
bolts are tightened to such an extent that the friction between steel members resists movement
bearing type bolts are stressed in tension
False
bearing type bolts are stressed in shear
True
slip critical bolts are stressed in shear
False
slip critical bolts are stressed in tension
True