Send a link to your students to track their progress
49 Terms
1
New cards
SECTION 101. Title
This Decree shall be known as the “National Building Code of the Philippines” and shall hereinafter be referred to as the “Code”. Under what section is this?
2
New cards
General Powers and Functions of the Secretary under this Code
Section 203
3
New cards
Fees
Section 208
4
New cards
Non-Issuance, Suspension or Revocation of Building Permits
Section 306
5
New cards
SECTION 309
Certificate of Occupancy
6
New cards
Type IV
Type _____ buildings shall be of steel, iron, concrete, or masonry construction. Walls, ceilings, and permanent partitions shall be of incombustible fire-resistive construction: Except, that permanent non-bearing partitions of one-hour fire-resistive construction may use fire-retardant treated wood within the framing assembly.
7
New cards
Type V
Type ____ buildings shall be fire resistive. The structural elements shall be of steel, iron, concrete, or masonry construction. Walls, ceilings, and permanent partitions shall be of incombustible fire-resistive construction.
8
New cards
SECTION 502. Buildings located in more than One Fire Zone
A building or structure which is located partly in one fire zone and partly in another shall be considered to be in the more highly restrictive fire zone, when more than one-third of its total floor area is located in such zone.
9
New cards
SECTION 507. Designation of Fire Zones
The Secretary shall promulgate specific restrictions for each type of Fire Zone. Cities and municipalities shall be divided into such Fire Zones in accordance with local, physical, and spatial framework plans submitted by city or municipal planning and/or development bodies.
10
New cards
SECTION 602. Fire-Resistive Time Period Rating
Fire-resistive time period rating is the length of time a material can withstand being burned which may be one-hour, two-hours, three-hours, four-hours, etc.
11
New cards
SECTION 704
Location on Property
12
New cards
SECTION 804
Size and Dimensions of Courts
13
New cards
SECTION 907
All pipe materials to be used in buildings shall conform to the Standard Specifications of the Philippine Standard Council.
14
New cards
SECTION 1007
Doors, windows, and the like less than 2.40 meters above the pavement or groundline shall not, when fully opened or upon opening, project beyond the property line except fire exit doors.
15
New cards
Storage in Public Property
SECTION 1102
16
New cards
Roof Construction and Covering
SECTION 1206
17
New cards
Republic Act No. 184
All electrical systems, equipment and installation mentioned in this Code shall conform to the provisions of the Philippine Electrical Code, as adopted by the Board of Electrical Engineering pursuant to ________ otherwise known as the Electrical Engineering Law.
18
New cards
SECTION 1603
Glazing of Openings
19
New cards
SECTION 1903
A copy of the output sheets for computer-generated computations shall be submitted as a part of the design computations. The out sheets shall be accompanied by a certification of a designer and/or consultant that the output sheets are the results obtained through the use of documented programs.
20
New cards
PD 1096
Also known as the National Building Code of the Philippines is a law created to provide a framework of minimum standards and guidelines for Philippine Buildings.
21
New cards
BP 220
It is a policy of the government to promote and encourage the development of economic and socialized housing projects, primarily by the private sector in order to make available adequate economic and socialized housing units for averaged and low-income earners in urban and rural areas.
22
New cards
RA 9514
This Act shall be known as the “Fire Code of the Philippines of 2008”.
23
New cards
BP 344
An Act to Enhance the Mobility of Disabled Persons by Requiring Certain Buildings, Institutions, Establishments and Public Utilities to install Facilities and Other Devices.
24
New cards
PD 957
REGULATING THE SALE OF SUBDIVISION LOTS AND CONDOMINIUMS, PROVIDING PENALTIES FOR VIOLATIONS THEREOF.
25
New cards
6 sqm, 2.00m
Under PD 1096, Rooms for human habitation should have a minimum area of ___________ and a minimum dimension of _____________.
26
New cards
3 sqm, 1.50m
Kitchen should have a minimum area of _____________ and a minimum dimension of ___________________.
27
New cards
1\.2 sqm, 0.90m
Bathroom should have a minimum area of ______________ and a minimum dimension of ____________________.
28
New cards
2\.70m
MINIMUM CEILING HEIGHTS UNDER PD 1096, provide the required ceiling heights of the following:
Ground floor – Naturally Ventilated
29
New cards
2\.7m
MINIMUM CEILING HEIGHTS UNDER PD 1096, provide the required ceiling heights of the following:
Ground floor – Artificially Ventilated
30
New cards
**2.70**
MINIMUM CEILING HEIGHTS UNDER PD 1096, provide the required ceiling heights of the following:
Second floor – Naturally Ventilated
31
New cards
2\.40m
MINIMUM CEILING HEIGHTS UNDER PD 1096, provide the required ceiling heights of the following:
Second floor – Artificially Ventilated
32
New cards
**2.7m**
MINIMUM CEILING HEIGHTS UNDER PD 1096, provide the required ceiling heights of the following:
Succeeding floor – Naturally Ventilated
33
New cards
2\.10m
MINIMUM CEILING HEIGHTS UNDER PD 1096, provide the required ceiling heights of the following:
Succeeding floor – Artificially Ventilated
34
New cards
1\.80m
MINIMUM CEILING HEIGHTS UNDER PD 1096, provide the required ceiling heights of the following:
Mezzanine
35
New cards
10% of floor area, but 1.00 sq. m minimum
Windows for rooms should be ____________.
36
New cards
5% of floor area, but 240 sq. mm minimum
Windows for bathrooms should be ____________.
37
New cards
3\.60 m
Maximum vertical distance between landings is _______.
38
New cards
2\.0 m
Minimum headroom for stairs
39
New cards
800 mm, 900 mmu
Handrails shall be placed not less than _______ nor more than ______ above the nosing of treads.
40
New cards
Space planning
Refers to the utilization of the space and on how it is being laid out and planned for the efficient use of the spaces. Thus, it is an essential part of the interior design process.
41
New cards
Specifications
Talks about the detailed information with regard to the certain project of sites, facilities, or systems. These includes the set of rules and standards that are needed to be followed in the conduct of the planning and construction of buildings.
42
New cards
Building Permits
Are an essential part when it comes to the entirety of the construction process for it ensures that the plans and specifications meet the required standards set forth by the specific codes.
43
New cards
Quantity Survey
Is a process that deals with the monitoring and management of construction project costs.
44
New cards
Design Drawings
These set out design information and procedures which are required to be used on the works.
45
New cards
Bill of quantities
This itemizes the quantity of materials to enable a tenderer to accurately cost the work for which they are bidding.
46
New cards
Materials Specifications
Such as diameter, type and grade of material for pipes (e.g.
polyethylene pipes or UPVC), joining methods (e.g., electro- fused or compression fittings etc.), or 28- day compressive
strength of concrete.
47
New cards
Taking off quantities
Is the process of measuring dimensions from working drawings and recording them in a systemic and concise manner along with the description of each item.
48
New cards
Abstracting
The process by means of which the quantities of items of
identical character and description are collected from the “take- off sheets”, totaled and deduction made in order to arrive at the
net total quantities of respective items and in trade-wise order called ________.
49
New cards
Billing
It is a claim for the amount of work done or materials supplied.