1/70
Looks like no tags are added yet.
Name | Mastery | Learn | Test | Matching | Spaced | Call with Kai | Chat |
|---|
No analytics yet
Send a link to your students to track their progress
Consulting Architect
Architect who is professionally and academically qualified with recognized expertise.
RA 9266
Architecture Act.
PD 1096
National Building Code.
BP 344
Accessibility Law.
RA 9514
Fire Code.
BP 220
Standards of Economic & Socialized Housing.
PD 957
Subdivision and Condominium Buyers Protective Decree.
Maestro De Obras
Responsible for supervising the construction of churches, bridges, and public buildings during the Spanish period.
Liceo de Manila, 1900
First private school to offer an academic title.
LPA
League of Philippine Architects.
APGA
Association of Philippine Government Architects.
PIA
Philippine Institute of Architects.
RA 386
Covers the legal framework governing personal and family relationships, ownership and rights over property.
15 years
The time period from the completion of a building during which an architect can be held liable if the structure collapses.
Article 1723
Whoever is responsible for the damage of the structure (contractor, architect, or engineer) is liable.
10 years
Prescription period for filing cases if a building collapses.
PRC
Professional Regulation Commission.
Ar. Conrad Onglao
PRC Commissioner.
Ar. Robert Mirafuente
PRBOA Chairman.
RA 544
Engineering Law.
Architect of Record
Reminds the team that all architectural drawings, specifications, and related documents must bear their seal signature and PRC number before submission.
Architectural Firm
Can be a sole proprietorship, partnership, or corporation.
Sole Proprietorship
Business registration through the DTI.
Corporation
Business registration through the SEC.
Authorship
Owner of architectural plans.
Board
Refers to the Regulatory Board of Architecture.
Continuing Professional Development
A progressive learning process that maintains knowledge.
SEC
Securities and Exchange Commission.
3840 hours
Diversified experience requirement.
2 years
Renewal period of Certificate of Registration (CoR) if revoked.
Expiration of PRC ID
Every 3 years upon member's birthday.
Ramp
1.20m length for accessibility.
Gradient
1:12 ratio for ramps.
Width of parking slot
4 meters.
Walkway width
1.2m required for accessibility.
Pol Mounted Parking Signage
.6x.6 meters.
United Nations Blue
Color of the ISA.
Toilet Cubicle
Dimensions of 1.8x1.8 meters.
Height of Door Knobs
900mm.
Elevator Distance from Building Entrance
30m.
Air Space for Factories
12 cubic meters.
Classroom occupant load
1:80sqm.
Socialized Housing
450k budget (no finishes).
Economic Housing
450k but not exceeding 1.7m (with finishes).
Minimum Open Market Single Attached
96sqm.
Minimum Open Market Single Detached
120sqm.
Minimum Open Market Floor Area
42sqm.
Minimum Lot Area for Duplex
80sqm.
Minimum Single Detached Area
72sqm.
Rowhouse Frontage
4m minimum.
Minimum Frontage of Irregular Lot
6m.
Enforced BP344
DPWH (Department of Public Works and Highways).
Minimum Exit Door Width
0.71m.
Ramp Gradient
1:12m.
Minimum Width of Hallway
1:20m.
Occupant Load for Standing Room
0:28m.
Minimum Corridor Width
1:2m.
Men's Washroom
Designed as an equilateral triangle.
Women's Washroom
Designed as a triangle.
Stairs for Crutches
Utilize slanted nosing.
Minimum Hospital Corridor Width
2.44m.
Occupant Load for Laboratory Shop
4.60sqm per person.
Turn Grove
Required to be 90 degrees.
Occupant Load for 500-999 Occupants
Requires 3 exits.
Occupant Load for 1000+ Occupants
Requires 4 exits.
Dry Nursery Occupant Load
2.50sqm per person.
Minimum Dimension of PWD Toilet
1.80m.
Wheelchair Turning Space
1.50m.
Elevator to Lobby Distance
30m.
Issuance of Permits
15 days from payment.
Minimum Width of Planting Strip RROW 15m
1.3m.