Vocabulary and key requirements for plumbing permits and inspections according to the Revised National Plumbing Code of the Philippines.

Last updated 2:19 AM on 6/18/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai

No analytics yet

Send a link to your students to track their progress

13 Terms

1
New cards

Revised National Plumbing Code of the Philippines

The official code governing plumbing practices in the Philippines as presented by Arch. Lorenzo Ray Naz Tanael.

2
New cards

Registered and Licensed Master Plumber

The professional to whom plumbing permits are issued and who is authorized to prepare, sign, and seal plumbing plans and documents without limitations.

3
New cards

Permit Issuance

Official permits must be secured from the Office of the Building Official (OBO).

4
New cards

Application Requirements

Includes the scope of work, vicinity map, computations, technical specifications, drawings, diagrams, and signatures from the owner and a registered master plumber.

5
New cards

Republic Act 13781378

The law also known as the "Plumbing Law" that governs the practice of plumbing in the Philippines.

6
New cards

Submission Quantity

Plumbing plans, design analysis, and other documents must be submitted in 66 sets with each application for a permit.

7
New cards

Administrative Authority (OBO) Retention

The number of sets of plans retained by the Administrative Authority, which is 11 set.

8
New cards

Owner Plan Retention

The owner retains 22 sets of the plumbing plans, with 11 set required to be kept at the jobsite.

9
New cards

Permit Validity (Non-commencement)

A plumbing permit becomes invalid if the work authorized has not commenced within 11 year.

10
New cards

Permit Validity (Suspension/Abandonment)

A permit expires if the plumbing work is suspended or abandoned for a period of 120120 days.

11
New cards

Inspection Approval Requirement

No portion of any plumbing system shall be concealed until it has been inspected and approved.

12
New cards

Plumbing Inspector Qualification

All Administrative Plumbing Personnel shall be a Registered and Licensed Master Plumber in accordance with Republic Act 13781378.

13
New cards

Inspection Request

A request for inspection must be made at least 33 working days before the intended inspection date.