1/14
A collection of vocabulary flashcards derived from the Short Test 1 transcript, covering metal fabrication, pipe fitting, and structural steelwork concepts.
Name | Mastery | Learn | Test | Matching | Spaced | Call with Kai |
|---|
No analytics yet
Send a link to your students to track their progress
Lifting equipment safety precautions
A set of at least three [3] safety measures required when lifting equipment.
Fabricated components and structures operational stages
Stages in production that are governed by five [5] specific principles.
Air bending
A specific metal bending method noted for having at least three [3] advantages.
Hollowing
A metalworking technique mentioned in contrast to the 'raising' method.
Raising
A metalworking technique mentioned in contrast to the 'hollowing' method.
Solid blow
One of three types of impacts used when employing a hammer or a mallet.
Elastic blow
One of three types of impacts used when employing a hammer or a mallet.
Floating blow
One of three types of impacts used when employing a hammer or a mallet.
Wiring the edge of a curved surface
An edge-finishing process that can be performed using two [2] distinct methods.
Structural steelwork connections
The techniques used to connect members, which include at least four [4] ways of connecting structural components.
Web stiffeners
Components required in some structural components to provide reinforcement.
Pipe work or bending measurement
The process of measuring for pipe work, which utilizes four [4] specific methods.
Pipe fitting
A field of work that involves at least four [4] important factors for consideration.
Copper pipe
A piping material identified as having two [2] main disadvantages.
Neutral line inside the bend
A line in a bent component whose precision position is determined by three [3] specific factors.