Fire zones are __________ within which only certain types of buildings/structures are permitted.
Occupancy
These are based on use or __________, type of construction, and resistance to fire.
More Highly
A building located partly in one fire zone and partly in another shall be considered in the __________ restrictive fire zone.
One-Third
This applies when more than __________ of its total floor area is located in such zone.
Comply
Any building moved within or into any fire zone shall be made to __________ with all requirements.
Pre-Engineered
This also applies to __________ or pre-fabricated buildings/structures.
Building Official
Temporary buildings may be erected by special permit from the __________.
Limited
Such temporary buildings are allowed only for a __________ period of time.
Removed
These structures shall be completely __________ upon expiration of the permit.
Miscellaneous
Temporary buildings include reviewing stands and other __________ structures.
Fences
Temporary structures may also include sheds, canopies, and __________.
Public
These are used for the protection of the __________ around construction work.
Fire
Temporary structures in restrictive zones may be allowed if __________ measures are adequate.
Suppression
Fire protective and preventive measures must include fire __________ facilities.
Property
The center line of adjoining street or alley may be considered an adjacent __________ line.
Right
Distances shall be measured at __________ angles to the street or alley.
Enlarged
Existing buildings not complying shall not be __________, altered, remodeled, repaired, or moved.
Demolished
One exception is if the building is entirely __________.
Fire
Another exception is if the building is moved outside the limits of the more highly restrictive __________ zone.
20
Changes may be made if the value does not exceed __________ percent of the building value.
12
This limit applies within any __________-month period.
Combustible
Changes must not add additional __________ material.
Fire
The changes must not increase the __________ hazard.
Fire
Additions must be separated by __________ walls.
Materials
Damage from fire, earthquake, or typhoon may be repaired using the same kind of __________.
20
Repair cost must not exceed __________ percent of the replacement cost.
LGU
The legislative body of the __________ may designate fire zones.
Conflagration
Fire zones are designated for management, prevention, control, and suppression of __________.
Countryside
Non-fire restricted zones are often located in the __________ or rural areas.
Wood
These areas may use indigenous materials such as bamboo, sawali, nipa, and __________.
Two
Fire restrictive zones require at least __________-hour fire resistivity for exterior walls.
One
Buildings in these zones must have at least __________-hour fire resistivity throughout.
II
These zones usually allow Types __________, III, and IV construction.
Highly
Highly fire restrictive zones require __________ fire-resistive or non-combustible materials.
Three
These must have no less than __________ to four-hour fire-resistive construction.
IV
Only Types __________ and V constructions are allowed in highly restrictive zones.