1/48
Looks like no tags are added yet.
Name | Mastery | Learn | Test | Matching | Spaced | Call with Kai |
|---|
No analytics yet
Send a link to your students to track their progress
QA/QC
Quality Assurance/ Quality Control - internal review of plans before submission
Kickoff Meeting
Initial team meeting to define scope, schedule, and responsibilities
Check Set
Draft plan set circulated internally before finalizing for submission
Deliverable
Any finalized product (plan set, report, etc.) due to a client or agency
Scope Creep
Expansion of project scope beyond the original agreement or contract
T&M
Time and Materials - billing type based on hours worked and materials used
NTE
Not to Exceed - billing limit set by contract
Lump Sum
Fixed fee billing regardless of hours spent
SALDO
Subdivision and Land Development ordinance -Local land development regulations
Zoning Hearing Board
Local board that hears variance and special exception requests
Planning commission
Reviews land development plans and makes recommendations to the governing body
Waiver
A request to deviate from a municipal code requirement
Variance
Legal request to deviate from a zoning regulations
Conditional Use
A use that may be permitted under zoning if certain criteria are met
SWM
Stormwater Management - infrastructure to handle runoff
BMP
Best management Practice - methods to control stormwater
PCSM
Post Construction Stormwater Management - DEP requirements after construction
E&S Plan
Erosion and Sediment Control Plan - required for earth disturbance
HQL/EV Streams
High Quality/Exceptional Value - protected streams requiring additional reviews
OneCall
PA system to notify utilities before digging
Pre-Submission Mtg
Meeting with municipal or county official to review concept before submitting
Review Cycle
The time period between plan submisssion and receiving comments
Completeness Review
Intial check by a municipality to ensure all required documents are included
Resubmission
Updated plans responding to review comments
Outside Agency
Any regulatory body beyound the municipality
CCD
County Conservation District - reviews NPDES, E&S plans
Basemap
Draft drawing incorporating survey and site information
Concept Plan
Preliminary site layout to explore project feasibility
Yield Plan
Plan showing how many lots/units can fit under zoning rules
Grading Plan
Map showing site contours, cut/fill, and drainage
Utility Layout
Preliminary design of water, sewer, electric, and other service lines.
Stakeout
Surveyor marks key construction points on the ground
Benchmark (BM)
A fixed reference point known elevation used to establish other elevations
Control Point
A point with known coordinates used to anchor the survey to real-world locations
Topographic Survey
A survey that shows the elevations and features (tree, buildings, etc.) of a site.
Boundary Survey
Identifies property lines and corners of parcel based on legal descriptions
Traverse
A series of connected lines whose lengths and angles are measured
Invert Elevation
The inside bottom of a pipe, used in sewer/storm design
Rim Elevation
The top edge of a manhole or catch basin
As-Built Survey
A survey done after construction to verify built location/size/depth of utilities
Utility Locate
The process of marking underground utilities via 811
Easement
Legal right for utilities or others to use part of a property
Contours
Lines on a topo map connecting points of equal elevation
Cross Section
A vertical cut through the land showing existing/proposed grades and utilities
Stationing
A way to measure distances along a baseline (e.g. road centerline)
Plat
A legal map showing boundaries, easements, and other site features
Legal Description
A written way to describe property boundaries
Encroachment
When something crosses a property line
Right-of-Way (ROW)
Land reserved for public use like roads or utilities