1/42
Looks like no tags are added yet.
Name | Mastery | Learn | Test | Matching | Spaced | Call with Kai |
|---|
No analytics yet
Send a link to your students to track their progress
How has the Uk economy changed from the past to the present
changed from an industrial powerhouse to a service-dominated economy
5% primary
12% secondary
83% services (tertiary + quaternary)
what is a good example of a post industrial economy
Cambridge
define science parks
a collection of scientific and technical knowledge-based businesses located on a single site e.g Cambridge science park
define business parks
a collection of businesses that are closely linked in the same supply chain or offer similar services that group together in a specific area that has been set aside for them e.g Biomedical centre
define post industrial economy
The shift in some HIC economies from producing goods to providing services e.g Cambridge
define globalisation
The process by which the world is becoming increasingly interconnected bc of increased trade and cultural sharing
By 1900, 1961, and 2011 what % of jobs were in secondary
55% in 1900
38% in 1961
10% in 2011
What is UK’s post industrial economy like
1) services e.g retail and entertainment → return employs 4m ppl in the UK
2) information - technology → over 1.7m ppl work in IT
3) finance - hole to may banking and financial TNC
4) research - in 2016 over £33b was spent on R&D (research n development) in UK
What are examples of science and business parks in UK
Cambridge science park
→ established in 1970
→ By the A14 so easily accessed by cars
→ close to the Cambridge North station
ARM
What caused changes to the UK economy
1) de-industrialisation
2) globalisation
3) government policies e.g minimum wages (higher labour cost) + lack of industrial strategies (decision on drilling oil+ gas or keeping the production of steel)
What are the UK biggest export market and imports
Biggest export : EU e.g Germany, USA
Most imports: Germany, USA, China
What are examples of government policies that affected UK’s economy
joining the EU 1972
Leaving the EU 2016
Privatisation e.g water, rails, energy
Removing taxes on businesses since 1980

What are examples of globalisation that affected UK’s economy
Companies like Mark and Spencer’s moved their clothing manufacturing to countries like India and China to make bigger profit
LIC and NIC becoming more industrialised and starting to produce goods more cheaply then UK
TNC like Apple moving tertiary and quaternary operations to the UK. Apple employs 6,500 ppl across UK

What are examples of de-industrialisation that affected UK’s economy
Automation meant that factories n other secondary industries shut down bc robots replaced the jobs of ppl

What are examples of foreign direct investments in the UK
Nisan, Honda → Big car factories
Nuclear power station (Hinckley point) by China (funds $$) + France (provides skilled workers)
What is an example of industry in the Uk
Rolls Royce → makes engines and small modular reactors (SMRs)
What are the negative impacts of industry on the physical environment
1) Pollution (including GHG)
→ air, water, ground, noise, visual
2) use of natural resources
→ requires lots of energy n water e.g Ai
3) dmg to nearby habitats e.g Caracas iron mine
→ also releases toxic chemicals into rivers, lakes, oceans
what are some facts about Tor Quarry (case study)
located in Somerset
7th largest in UK and produces limestone which is used for making concrete
75% of the products are transported by rail
There’s a train station near the quarry
what are the environmental impacts of the Tor Quarry
loss of habitat and animal + plant life
visual pollution
noise pollution from explosives and machinery
water pollution
air pollution from trucks + train e.g C02
what are Tor Quarry’s responses to the environmental impacts
Tree planting → restores habitat
won prizes for becoming more environmentally sustainable
what are Tor Quarry’s responses to pollution
to dig quarry deeper rather than wider into the surrounding countryside
to monitor noise, vibrations, dust, and water quality regularly
transport limestone by rail instead of lorries travelling on local village roads

what are Tor Quarry’s responses to use of natural resources
to create a lake that will provide water to the local water supply

what are Tor Quarry’s responses to damaged habitats
plans to create two wildlife lakes in areas where they have stopped working
landscaping 200 acres of land by planting trees

what is the UK’s history (related to its relationship to the world)
used to have empires and colonies e.g India, today, there is the Commonwealth (like a club)
in 1973 we joined the EU which became the biggest and most integrated market in the world. In 2016 we left the EU
how is the UK connected to the wider world through trade
Uk exports over £800bn of goods + services each year
Most = services
The EU + USA are our biggest export market
we have TNC like BP

how is the UK connected to the wider world through culture
we export culture e.g english premier league
Shawn the sheep shown in over 170 countries
in 2019 chinese food was voted the most popular takeaway

how is the UK connected to the wider world through transport
Heathrow, a global international hub, travels to 185 locations and 84 countries
the channel tunnel from UK → France

how is the UK connected to the wider world through electronic communications
many electronic cables, like the trans atlantic cables, carry digital data
interconnectors
headquaters of many international telecom → O2, vodaphone, virgin media

why are we important for the UN
because we sit on the Security Council (they’re bodies meant to stop wars) with:
France, USA, Russia, China
what does the UK import
steel, clothes, electrical goods
what makes more then 50% of the Uk exports
services like finance e.g insurance
what are examples of rural towns effected by post-industrial changes CASE STUDY
North Sumerset
South lakeland
what is the effect of post- industrial changes on North Sumerset
population inc by 7.8% from 2005-2015
more services and businesses becoming available e.g restaurants, supermarkets, sports centre

why is North Sumerset growing/ impoving after the post-industrial changes
close to Bristol → 2 universities (UNI of Bristol, UWE), Big retail centre, Big high tech centre, Manufacturing (air buds makes airplane wings)
Bristol has high house prices
nice area
green space, less crime, less pollution
near the coast
railway M4 = easy commuting
lower house prices
inc pop’un leading to positive multiplier effect → Eco ⬆

what is the effect of post-industrial changes on South Lakeland
population ⬇ by 4.3% in Barrow
drop in the number of jobs
businesses and services are closing
less attractive
younger people are leaving, leaving behind an ageing population → spiral of decline

why is South Lakeland getting worse after the post-industrial changes
mainly countryside - biggest town = Barrow-in-Furness
transport is difficult
major city (Leeds) is 2H away so is unsuitable

what are the impacts of pop’un ⬆ on N.Sumerset
house prices in the area are rising. From 2017 to 2018 inc by 5.5%
some services e.g schools are becoming over-subscribed
employment and wages are above the national average
roads in smaller towns and villages are becoming more congested

what are the impacts of pop’un ⬆ on S.Lakeland
shows such as Gamestation have closed while others like Marks and Spencer are at risk
closure of shops and businesses is leading to lower taxes for local gov
young people leaving, leaving ageing pop’un behind
public services like dentists and no. of buses are reducing

what are the changes in transport in the UK
1) Railway - HS2 (high speed 2) railway in planning
2) Airports - Heathrow (3rd runway) in planning
3) The expansion of Felix Stowe
explain the railway changes in the UK
HS2 railway (Big project fail)
→ UK only has 1 high speed train track London → Channel Tunel
→ HS2 was planned to reduce the “North-South divide”
→ Aim: faster travel times to Manchester (1h) and Leeds (50min)
→ original £50bn budget will increase to £100bn
Cambridge N+S (small successful project)
→ 2 new railway stations for Biomedical centre + Cambridge science parks

explain the airports changes in the UK
building a 3rd run way
expensive
→ M25 turn into tunnel lead to congestion
→ compensation for relocating ppl 761 homes
→ multi bn project
noise pollution for locals
talked about for decades
flight inc 480,000 to 740,000
→ CO2 ⬆
→ tourst ⬆
explain the changes to Felixstowe in the UK
44% of all UK container traffic
double in size by 2030
→ environmental cost - Carlew no. near Felixtstowe ⬇
→ phase 1 completed Jan 2025
what are the local successes on transport changes
Cambridge N+S railway
Dualing of A14 between Harwhich and Midlands
East west rail connecting Oxford and Cambridge (planning to)