1/19
Looks like no tags are added yet.
Name | Mastery | Learn | Test | Matching | Spaced | Call with Kai |
|---|
No analytics yet
Send a link to your students to track their progress
How many LF of Type 6 wall is needed for the First floor?
Between 159 and 181
According to the drawings, what material is on the East wall of Entry 100?
Stone
Which material is used to fill the void between the deck structure and walls that go to deck?
Pre-molded compressible filler.
According to the partition schedule, a Type 1 partition uses what thickness sound attenuation blanket?
3 1/2"
During the shop drawing submittal process, the ______________shall assume responsibility for all means and methods and errors and omissions on their drawings.
Contractor
How many SY of carpet are required for room 113?
Between 31.5 and 38.5
According to the documents, a Type one wall uses what gauge studs?
25
Office 149 requires how many LF of base?
Between 43 and 49
Partition Type 6 extends how far above the ceiling?
6”
What type of door is #137
3-0 x 7-0 stained wood door, 1 hr rated, sound rated to stc 54
Classroom 154 requires what kind of flooring?
VCT-1
The use of fire retardant treated wood is prohibited.
True
How many SF of acoustical wall panels are required for room 154?
325
Which of the items is not a part of wall type 2?
4 5/8" metal studs.
Door 114 has an Acoustical rating of STC-54.
True
Classroom 154 has how many entry doors?
2
What does PCC stand for?
Precast Concrete
How many LF of Type 5 wall is needed for the First floor?
Between 62 and 70
Classroom 150 requires how many SF of Ceiling?
Between 901 and 1,021
Door number 154A has a fire rating of _______________________?
1 HR