CATEGORY 3 NON-CAB OPERATED TEST Questions and answers 2026

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
Card Sorting

1/75

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 7:35 PM on 4/15/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai

No analytics yet

Send a link to your students to track their progress

76 Terms

1
New cards

Bridge cranes with rated capacities of 20,000 lbs. or greater are classified as ______ cranes

Category 2

2
New cards

The expiration date that is of particular importance to crane operators is

The certification expiration date of the crane

3
New cards

Who is primarily responsible for evaluating a Crane Operators physical and emotional fitness

crane operator

4
New cards

A monorail hoist with less than 20,000 lbs. capacity is a ________________ crane.

Category 3

5
New cards

Components that control, restrain, or position the load, and upon failure would cause dropping, shifting or uncontrolled movement of the loads are ____________.

load controlling parts

6
New cards

All of the following require a license to operate EXCEPT a:

Non-cab operated category 3-bridge crane

7
New cards

What is two-blocking and why is two-blocking dangerous?

Two-blocking occurs when the hook block comes in contact with the upper sheave block during hoisting of the hook. It is dangerous because it could result in damage to the crane, parting of the hoist lines, and dropping the load.

8
New cards

The formula for determining the area of a triangular shaped object is:

Base x Height divided by 2

9
New cards

When are operators required to perform a pre-use check of the crane?

Prior to the first use of the crane each day.

10
New cards

Regardless of the method of communication used all crane signals must be ____________________.

clear

11
New cards

Synthetic web slings should NOT be used in areas where temperatures exceed 194 degrees Fahrenheit.

True

12
New cards

If an object is 6 feet long, 5 feet wide, and 4 feet high, what is the volume of the object?

120 cubic feet

13
New cards

Is it necessary for the operator to see the load or work area?

Not if there is a designated signal person who is in control of the lift and is in view of the operator, or if the signal giver is in constant radio contact with the operator.

14
New cards

What is "inching"?

Performing a motion very slowly, a little at a time

15
New cards

The majority of crane accidents are attributed to which of the following?

Personnel error

16
New cards

Crane operators at naval activities may be required to operate various types of cranes for which they hold a license. Which of the following can best assure operator proficiency and safety?

Be familiarized by a qualified person before operating the crane for the first time

17
New cards

Which of the following is NOT an acceptable method of communication between the signal person and the crane operator?

Signal Flags

18
New cards

Which of the following is used with a physical locking device placed at the energy source?

Lockout Tag

19
New cards

Which of the following is considered to be the best way the operator can ensure the crane is safe to operate on any given day?

Perform Daily Pre-use Checks

20
New cards

When crane accidents happen, you must do all of the following EXCEPT:

Continue to operate the crane until all lifts are completed

21
New cards

Components that provide protection for operation and maintenance personnel working on or in the path of cranes.

General Safety Devices

22
New cards

If the crane operator and the rigger in charge disagree on whether or not a load is safe to lift the operator should:

not operate the crane until contacting the supervisor to resolve the issue.

23
New cards

Components that support the load, and upon failure would cause dropping or uncontrolled lowering of the load are ____________.

load bearing parts

24
New cards

What is meant by "skewing"?

Where one end of the bridge gets ahead of the other end, frequently causing binding on the rails.

25
New cards

What are the principal parts of an overhead traveling crane?

Bridge girders, end trucks, trolley, and operator's cab or pendant control

26
New cards

Why shall sudden starts and stops of the bridge and trolley be avoided?

Sudden starts and stops may cause skidding and uneven wear of the wheels

27
New cards

Select the proper method of landing a load.

Lower the load slowly, stop a few inches from the landing point, then slowly lower the rest of the way.

28
New cards

The crane operator must check the certification information on the crane for________ before operating the crane.

certification expiration date, crane ID, and certified capacity

29
New cards

What is the bridge crane communications hand signal pictured, with the palms up, fingers closed; thumb pointing in the direction of motion, and jerking horizontally?

Trolley travel

30
New cards

At what point during a lift may trolley or bridge travel be started?

When the tracks are clear and the load is high enough off the ground to pass over obstacles safely

31
New cards

What is the crane communications hand signal pictured, with the arm extended downward, forefinger pointing down, and moving the hand in a small horizontal circle?

Lower

32
New cards

Why should the hook be positioned directly over the load when attaching the load?

To avoid side loading and dragging the load as it is picked up

33
New cards

Bridge cranes with rated capacities of less than 20,000 lbs. are classified as ______ cranes.

Category 3

34
New cards

More than one signal person may provide signals to a crane operator at a time.

False

35
New cards

What is the crane communications hand signal pictured, with the arm extended, palm down, moving the arm back and forth horizontally?

Stop

36
New cards

A crane accident occurs when any element of the crane operating envelope fails to perform correctly during crane operations, maintenance, or testing which could result in any of the following EXCEPT:

NOT Two-Blocking or overload

NOT Personnel Injury or Death Equipment malfunction

37
New cards

Common modes of operation for typical OET bridge cranes are:

hoist, trolley, and bridge.

38
New cards

The crane operator is responsible for the pre-use ________ of the crane.

check

39
New cards

Shackles, wire rope slings, and /or eyebolts, may be used to their full capacity when used within ____ of vertical.

40
New cards

Which of the following formulas would be used to find the volume of a rectangular or square shaped 3 dimensional object?

Length X width X height

41
New cards

What should be done when leaving a crane at the end of the work shift?

Raise blocks into the upper limit switch

Ensure all controls are in the neutral or "off" position

Position the crane away from boarding platforms

Secure power

42
New cards

The crane operator STOPS the crane whenever ________ is in question.

safety

43
New cards

What is the purpose of a hoist limit switch?

To prevent overtravel of the hook block and the possibility of two-blocking

44
New cards

Knowing the load's approximate center of gravity prior to rigging or lifting a load is important:

All of the Above

45
New cards

What is the operator's main concern during crane operations?

Operating safely

46
New cards

Who can remove a danger, caution, or lockout tag?

The person who attached the tag or his or her supervisor when they are not available

47
New cards

New shackles put into the weight handling equipment program are required to have all of the following markings on, or attached to the shackles EXCEPT:

Date of Manufacture

48
New cards

How should an operator check the hoist brakes when lifting a load?

Lift the load a few inches off the ground and stop hoisting to ensure there is no slippage of the brakes.

49
New cards

What are the actions required if an asterisked item on the ODCL is found unsatisfactory during the pre-use check of the crane?

Stop operation and notify engineering of the deficiency.

50
New cards

What is the crane communications hand signal pictured, with both arms extended, palms down, moving arms back and forth horizontally?

Emergency stop

51
New cards

If an object is 6 feet long, 4 feet wide, and 2" thick, what is the area of the object?

24 square feet

52
New cards

What signal may an operator obey from a person other than the designated signal giver?

Stop or Emergency Stop

53
New cards

When should a tagline be used during lifting operations?

To prevent the load from swinging or rotating

54
New cards

What is "plugging"?

The use of reverse power instead of a brake to slow or stop the bridge or trolley travel

55
New cards

When making two-hook lifts, the capacity of __________ MUST NOT BE exceeded at any time.

either hook

56
New cards

Crane Operators are responsible for all of the following EXCEPT:

Slowing down when signals are unclear

57
New cards

Components that affect the safety and capability of the WHE, by stopping or limiting the operation when activated are __________________.

operational safety devices

58
New cards

What is the minimum amount of rope that shall be on a grooved drum and a smooth drum?

2 full wraps, 3 full wraps

59
New cards

While performing a pre-use check, the operator must check the wire rope system for all of the following EXCEPT:

Size and grade of wire rope

60
New cards

While performing a monthly ODCL on a crane you find minor deficiencies. What do you do?

Note the deficiencies on the ODCL

61
New cards

A pillar-Jib crane with a capacity of 22,000 lbs. is a __________ crane.

Category 2

62
New cards

Which of the following tags prohibits operation of equipment when its operation could jeopardize the safety of personnel or endanger equipment?

Danger Tag

63
New cards

Which of the following identify the two categories of crane lifts?

Complex and Non-Complex

64
New cards

What is the weight of a 24 sq ft, 2 inch thick aluminum plate with a unit weight is of 15 lbs. per square foot of material per inch of thickness?

720 lbs.

65
New cards

When is it permissible for an operator to leave the controls of a crane while a load is suspended from the hook?

The operator shall remain at the controls at all times while a load is suspended from the hook.

66
New cards

Sling angles affect the actual stress on each leg of the sling. Lowering the angle measured from the horizontal will:

increase the stress on each leg.

67
New cards

What is the crane communications hand signal, pictured, with the arm vertical, forefinger pointing up, moving the hand in small horizontal circle?

Hoist

68
New cards

What may cause the bridge to skew?

Wheel slippage on one side only because of a slippery track, or a heavy load suspended from one end of the bridge

69
New cards

Which tag alerts operators to special instructions for operating the equipment?

Caution Tag

70
New cards

Taking the slack out of rigging and starting to move a load or empty hook should be performed in first hoisting position or at the slowest possible speed.

True

71
New cards

What should an operator do if he/she is not sure of the meaning of a signal?

Stop operation until the meaning of the signal is understood

72
New cards

If an object has a volume of 200 cubic feet. and the unit weight is 150 lbs. per cubic foot, what is its weight?

30,000 lbs.

73
New cards

What is the bridge crane communication hand signal pictured, with the arm extended forward, hand open and slightly raised, making a pushing motion?

Bridge travel

74
New cards

Two-crane lifts require two signalmen to safely control the load

False

75
New cards

All of the equipment types listed below are covered by the P-307 EXCEPT:

Construction Equipment

76
New cards

All of the following describe the purpose of the NAVFAC P-307 EXCEPT

Maximizes efficient use of the equipment