Lecture 10.(Biophysics_2_2026.pdf) ) Biophysics 2 and Cardiac Tissue Engineering

0.0(0)
Studied by 0 people
call kaiCall Kai
Locked
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/51

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 11:47 AM on 5/26/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

52 Terms

1
New cards

The majority of growth and remodelling of the vascular network takes place when

blood circulation has already initiated

<p>blood circulation has already initiated</p>
2
New cards

What does flow velocity lead to in at the endothelial cells

shear stress

<p>shear stress</p>
3
New cards

What does pressure lead to in at the endothelial cells

Circumferential (tangential) and axial stress (along the long axis of the vessel)

4
New cards

What is the equation of conservation of momentum

delta p = u delta² u

<p>delta p = u delta² u</p>
5
New cards

What is the equation of conservation of mass

delta u = 0

<p>delta u = 0</p>
6
New cards

What is the equation for the boundary conditions from wall dynamics

u|sigma = ub

<p>u|sigma = ub</p>
7
New cards

What can the application of flow velocimetry to cell/tissue dynamics be used for

  • PIV can be used to tissue flows/deformations

  • Cell tracking (based on nucleolus market)

8
New cards

What are the key concepts of cell mechanics

  • cell junctions

  • cell flows

  • minimal cell models: vertex models

  • solid-fluid transitions of tissues

9
New cards

What are the cell mechanics of epithelial cells

  • apico-basal (different sets of proteins/structures in the apical and basal regions)

  • basal interfaces adhere to ECM (focal adhesions)

  • cells adhere to each other through adhesion molecules (cadherins, bound, indirectly, to an actomyosin network)

  • Actomyosin cytoskeleton: actin filaments myosin molecular motors: strongly concentrated near the cell membrane, allowing cells and tissues to deform

  • Two-dimensional models provide good phenomenology

10
New cards
<p>Cell matrix adhesion</p>

Cell matrix adhesion

focal adhesions, integrins link the cell to the extracellular matrix (ECM) and transmit mechanical forces

11
New cards
<p>Adherens Junctions</p>

Adherens Junctions

connects actin filaments of neighbouring cells; maintain structural integrity hold cells together

12
New cards

name of adhesion molecule

cadherin

<p>cadherin </p>
13
New cards

mechanosensing proteins:

talin, vinculin, myosin-II, a-catenin

14
New cards

What happens to the ATP under mechanical stress

Under mechanical stress, ATP released through channel protein Pannexin-1 activates purinergic receptors in the neighbouring cells to regulate cell tension

<p>Under mechanical stress, ATP released through channel protein Pannexin-1 activates purinergic receptors in the neighbouring cells to regulate cell tension</p>
15
New cards

What do tissue-level and cell-level studies show about the mechanics of epithelial cell layers?

Epithelial cell layers behave as mechanically integrated tissues, but their deformation can also be understood at the level of individual cell shape changes

<p>Epithelial cell layers behave as mechanically integrated tissues, but their deformation can also be understood at the level of individual cell shape changes</p>
16
New cards

What tools can be used to quantify cell shape from microscopy images

cell pose, cell profiler, image J, matlab and payton libraries

<p>cell pose, cell profiler, image J, matlab and payton libraries</p>
17
New cards

What tools can be created for segmentation output

cell masks

<p>cell masks</p>
18
New cards

What is cell intercalation

  • change in neighbouring cells can be driven

  • forces: both extrinsic (applied by other cells or stretcher), or/and intrinsic (actomyosin)

  • contributes to viscoelasticity of epithelial tissues; region specific

  • solid to fluid transitions

  • fluidity allows tissue remodelling

  • solid state: tissue establishment/maintenance

19
New cards

What is the equation for a network of vertexes that move under a force

Fu=- vector ru EVM

<p>Fu=- vector ru EVM</p>
20
New cards

What is the equation for shape factor

po =Po/sqrt(Ao)

<p>po =Po/sqrt(Ao)</p>
21
New cards

What is the monolayer tissue growth in vitro used for

  • originally used to study the spread of a favoured gene through a population

  • good model for expansion of an in vitro monolayer cell colony due to proliferation and cellular migration

  • low n densities proliferation is approximately exponential, with linear growth rate r n

  • Approaching N, inhibition of proliferation rate

22
New cards

What is the Fisher’s equation

differential n/ differential t = rn (N-n) +D vector² n

23
New cards
<p>What is the Fisher’s equation that includes motility</p>

What is the Fisher’s equation that includes motility

rn(N-n)

<p>rn(N-n)</p>
24
New cards

What mechanical forces do endothelial cells experience from blood flow?

Shear stress, Circumferential stress, Axial stress

<p>Shear stress, Circumferential stress, Axial stress</p>
25
New cards

What determines shear stress in a vessel?

Shear stress depends on:

  • flow rate

  • viscosity

  • vessel geometry

26
New cards

What equations are central in an in silico fluid model?

Conservation of momentum and Conservation of mass

<p>Conservation of momentum and Conservation of mass</p>
27
New cards

What does EHT stand for?

Endothelial-to-hematopoietic transition.

28
New cards

Where does zebrafish EHT occur in this lecture example?

In cells from the ventral wall of the dorsal aorta.

29
New cards

What mechanical cue is important for EHT?

Circumferential stress caused by pulsatile blood flow.

30
New cards

How are hematopoietic progenitors extruded during EHT?

By actomyosin contraction in the endothelium.

31
New cards

How do cultured endothelial cells usually orient under flow?

They usually elongate along the flow direction.

32
New cards

How do endothelial cells orient under cyclic strain?

perpendicular to the axis of strain.

<p><strong>perpendicular to the axis of strain</strong>.</p>
33
New cards

What is one example showing mechanics in pathfinding?

RGC axons sense a stiffness gradient and grow toward softer tissue, involving Piezo1.

34
New cards

What is microaspiration?

A method where negative pressure pulls a cell or tissue into a narrow channel to measure mechanics.

35
New cards

What can microaspiration measure?

It can estimate modulus/compliance from:

  • channel geometry

  • applied pressure

  • displacement into the channel

36
New cards

What are the two main imaging velocimetry methods mentioned?

Particle tracking and Particle image velocimetry

37
New cards

What is particle tracking?

Tracking individual particles over time

<p>Tracking individual particles over time</p>
38
New cards

What kind of approach is particle tracking?

A Lagrangian approach

39
New cards

What is PIV?

A method that tracks ensembles of particles to estimate velocity fields.

40
New cards

What kind of approach is PIV?

An Eulerian approach.

41
New cards

What is one limitation of PIV?

It may struggle with unsteady flows or sharp gradients.

42
New cards

How can optical tweezers be used in flow studies?

By measuring the displacement of a trapped particle from the trap center to estimate flow.

43
New cards

What limits optical tweezers velocimetry?

It requires optical access and only works for low drag forces.

44
New cards

What does traction force microscopy measure?

The traction forces cells apply to a substrate.

45
New cards

How does traction force microscopy work?

It infers substrate deformation from movement of:

  • embedded microbeads/nanobeads

  • or micropatterns such as micropillars

46
New cards

How does optogenetic control of RhoA affect contractility?

  • Recruit optoGEF-RhoA to membrane → increase contractility

  • Sequester it at mitochondria → decrease contractility

47
New cards

What are the main adhesion systems in epithelial cells?

Focal adhesions and Cadherin-based junctions

<p>Focal adhesions and Cadherin-based junctions </p>
48
New cards

What is laser ablation used for in tissue mechanics?

To estimate junctional tension from the relaxation/recoil after ablation.

49
New cards

What does cell segmentation allow you to quantify?

It allows extraction of:

  • cell boundaries

  • orientation

  • elongation

  • shape metrics

50
New cards

What do ferrofluid microdroplets measure?

They probe tissue mechanics:

  • fast time constant → elastic response

  • slow time constant → viscous/dissipative response

51
New cards

What is cell intercalation?

A neighbor exchange process that contributes to tissue viscoelasticity, remodeling, and solid-to-fluid transitions.

52
New cards

What is the key idea of vertex models?

They model epithelial tissues as networks of moving vertices, with mechanics depending on cell area, perimeter, elasticity, and line tension.