Congestion

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/68

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 6:00 AM on 5/17/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai

No analytics yet

Send a link to your students to track their progress

69 Terms

1
New cards

Congestion Rent

Revenue collected by the system operator from LMP differences caused by binding transmission constraints

2
New cards

Locational Marginal Price (LMP)

"Price at a location reflecting the cost to serve one more MW of load there (includes energy

3
New cards

LMP energy component

"System-wide marginal energy cost (identical at all nodes

4
New cards

LMP congestion component

"Part of LMP reflecting the cost of transmission constraints (positive on the expensive side of a constraint)"

5
New cards

LMP loss component

"Part of LMP accounting for marginal transmission losses (higher at nodes far from generation)"

6
New cards

Binding constraint

"Transmission limit reached in dispatch (no slack)

7
New cards

Non-binding constraint

"Transmission limit not reached in dispatch (has slack)

8
New cards

Shadow price (constraint)

"Value (Lagrange multiplier) of relaxing a constraint by one unit in dispatch; equal to the congestion component of LMP for that constraint"

9
New cards

Power Transfer Distribution Factor (PTDF)

"Fraction of a power transfer from one node to another that flows through a particular line (percentage of the transfer)"

10
New cards

PTDF example

"Example: If 100 MW is transferred from Bus A to B and 20 MW flows on Line X

11
New cards

Line Outage Distribution Factor (LODF)

"Fraction of power flow that shifts to a line when another specified line is out of service"

12
New cards

Flowgate

"Transmission element or set of elements identified as limiting the amount of power that can be transferred"

13
New cards

Interface (transmission)

"Defined set of circuits between two areas with a specified transfer capacity (limit on power exchange)"

14
New cards

Congestion forecasting

"Predicting future transmission constraints using data (load

15
New cards

Deterministic forecast

"Prediction that provides a single best estimate (no uncertainty) of a future value (e.g. congestion level)"

16
New cards

Probabilistic forecast

"Prediction that provides a probability distribution of future outcomes (e.g. congestion probabilities)

17
New cards

Security-Constrained Economic Dispatch (SCED)

"Market algorithm finding lowest-cost real-time dispatch subject to security constraints (ensuring reliability)"

18
New cards

Security-Constrained Unit Commitment (SCUC)

"Day-ahead optimization scheduling which units to commit to meet demand and reserves at least cost under security constraints"

19
New cards

Redispatch

"Short-term adjustment of generation schedules (ordered by the system operator) to relieve unexpected congestion"

20
New cards

Counterflow

"Power flow arranged opposite the direction of a congested path (injecting on the high-price side

21
New cards

Financial Transmission Right (FTR)

"Financial contract entitling the holder to the difference in locational prices (congestion cost) between two points"

22
New cards

Auction Revenue Right (ARR)

"Financial entitlement allocated to customers granting a share of congestion revenue (from FTR auctions) to hedge transmission costs"

23
New cards

Congestion hedging

"Using FTRs

24
New cards

Nodal (locational) pricing

"Pricing method with a unique price at each node

25
New cards

Zonal pricing

"Pricing method with a single price for a group of nodes (zone)

26
New cards

Congestion cost allocation

"Rules for assigning the costs of congestion (e.g. redispatch costs) to market participants or load (often based on usage or nodal prices)"

27
New cards

Transmission constraint

"Physical limit (thermal

28
New cards

Marginal loss

"Additional transmission loss incurred by delivering one more unit of power to a location"

29
New cards

Marginal congestion cost

"Additional system cost caused by one more MW flowing on a congested path (equal to the congestion component of LMP)"

30
New cards

Congestion relief actions

"Measures taken to reduce congestion

31
New cards

Congestion hours

"Number of hours in which at least one transmission constraint was binding (indicating congestion occurred)"

32
New cards

Congestion Severity Index

"Metric combining the magnitude and duration of congestion (e.g. sum of congestion prices over time) to quantify severity"

33
New cards

SCADA (Supervisory Control And Data Acquisition)

"System that collects real-time grid data (flows

34
New cards

EMS (Energy Management System)

"Software platform using SCADA data to monitor

35
New cards

Market settlements data

"Information on cleared schedules

36
New cards

Root Mean Square Error (RMSE)

"Square root of the average of squared forecast errors; measures accuracy of predictions (penalizes large errors)"

37
New cards

Mean Absolute Error (MAE)

"Average of absolute differences between forecasted and actual values; measures average forecast error"

38
New cards

Scenario analysis

"Studying how different hypothetical conditions (varying load

39
New cards

Sensitivity analysis

"Evaluating how changes in inputs (load

40
New cards

Contingency analysis (N-1)

"Simulating each single-element (line/generator) outage to ensure the system operates securely with any one element out"

41
New cards

Ramp constraint

"Limit on how fast a generator’s output can change (ramp up or down) between time intervals"

42
New cards

Market power (congestion)

"Ability of a generator to influence prices by leveraging a constrained transmission path (e.g. withholding capacity)"

43
New cards

Curtailment

"Reduction of scheduled generation output (often mandated by operators) to relieve over-generation or transmission constraints"

44
New cards

Congestion Revenue Right (CRR)

"Financial right (similar to an FTR) in some markets that entitles the holder to congestion payments between two locations"

45
New cards

Congestion management

"Set of processes (market clearing

46
New cards

Optimal Power Flow (OPF)

"Mathematical optimization finding least-cost generation dispatch while meeting demand and satisfying network constraints"

47
New cards

Available Transfer Capability (ATC)

"Amount of additional power that can be scheduled on a transmission path without violating limits

48
New cards

Transmission Reliability Margin (TRM)

"Portion of transfer capability reserved to ensure reliability (accounting for uncertainty)

49
New cards

Power flow

"Electrical flows on network lines determined by injections/withdrawals

50
New cards

Tie line

"Transmission line connecting two control areas or regions (often subject to interface transfer limits)"

51
New cards

Unscheduled flow (loop flow)

"Power flowing over an interface not matching scheduled interchange

52
New cards

Loop flow

"Flows that travel on alternate paths through neighboring networks because of meshed grid connections (often unscheduled)"

53
New cards

Over-generation

"Condition where total generation exceeds demand (often from renewables)

54
New cards

Price separation

"Difference in LMP between two locations caused by a transmission constraint between them"

55
New cards

Line rating

"Maximum safe power flow on a transmission line (thermal or stability limit) under specified conditions"

56
New cards

Load forecast

"Prediction of future electricity demand used in planning and market scheduling"

57
New cards

Shadow price example

"If a binding constraint has a shadow price of $10

58
New cards

Congestion cost example

"If LMP is $30 at injection and $40 at withdrawal due to a constraint

59
New cards

Constraint slack

"Difference between a transmission limit and the actual flow; positive slack means the constraint is non-binding"

60
New cards

Dual variable

"Value associated with a constraint in optimization (same as the shadow price) indicating the marginal cost of relaxing the constraint"

61
New cards

Independent System Operator (ISO)

"Entity that operates the transmission grid and runs the electricity market in a region (e.g.

62
New cards

Regional Transmission Organization (RTO)

"Organization similar to an ISO that manages the transmission network and market over multiple states or areas"

63
New cards

Constrained dispatch

"Generation schedule resulting from binding constraints

64
New cards

DC power flow

"Simplified linear power flow model ignoring reactive power

65
New cards

AC Optimal Power Flow (AC-OPF)

"Nonlinear optimization of dispatch considering full AC power flow equations for accurate flow and loss modeling"

66
New cards

N-0 condition

"Power system state under no-contingency (base case)

67
New cards

Marginal Loss Factor (MLF)

"Multiplier applied to energy deliveries at a location to account for incremental losses when computing LMP"

68
New cards

Transmission usage charge

"Fee charged for using the transmission network

69
New cards

```